Tuning an Accelerator for 1 MW C. Peters WAO 12 August 8 th, 2012.

Slides:



Advertisements
Similar presentations
Machine Physics at ISIS Proton Meeting 24 th March 11 Dean Adams (On behalf of ISIS Accelerator Groups)
Advertisements

ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
ISIS Accelerator Division
PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
Space Charge Issues in the SNS Linac and Ring
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
ISIS Beam Protection System and MICE operation. Dean Adams 29 Nov 07 Presented by Chris Rogers.
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
Linear Collider Machine Protection Issues M. Palmer Injection System Injector Damping Rings Bunch Compressor and Transfer Sections Main LINAC Beam Delivery.
SNS Integrated Control System MPS - Commissioning Plans 1. Quick MPS System Overview 2. Run Permit System 3. Fast Protect Auto Reset 4. Fast Protect Latched.
Managed by UT-Battelle for the Department of Energy SNS MEBT : Beam Dynamics, Diagnostics, Performance. Alexander Aleksandrov Oak Ridge National Laboratory.
ORNL-SNS Diagnostic Group SNS Beam Loss Monitors and HARPs Machine Protection System FDR September 11,2001 Presented by Saeed Assadi.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
ESS DTL beam commissioning
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
ORNL is managed by UT-Battelle for the US Department of Energy SNS Beam Diagnostics: Ten Years After Commissioning A. Aleksandrov Oak Ridge National Laboratory,
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Managed by UT-Battelle for the Department of Energy Overview of Beam Instrumentations for High-Power Operation of the Spallation Neutron Source Saeed Assadi.
F Project X Overview Dave McGinnis October 12, 2007.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Dog( leg )s of War Eric Prebys Run II Meeting March 13, 2003.
Advanced Accelerator Design/Development Proton Accelerator Research and Development at RAL Shinji Machida ASTeC/STFC/RAL 24 March 2011.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
Managed by UT-Battelle for the Department of Energy SNS BLM System Overview Detectors, Measurements, Simulations Alexander Zhukov Saeed Assadi SNS/ORNL.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
Managed by UT-Battelle for the Department of Energy Analysis of 2008 Beam Instability Data S. Cousineau, V. Danilov, M. Plum HB2008.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
Alexander Aleksandrov Oak Ridge National Laboratory
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
Booster Issues for NuMI Eric Prebys FNAL Beams Division.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
Managed by UT-Battelle for the Department of Energy Residual Does Rate Analyses for the SNS Accelerator Facility I. Popova, J. Galambos HB2008 August 25-29,
Managed by UT-Battelle for the Department of Energy Using Online Single Particle Model for SNS Accelerator Tuning Andrei Shishlo, Alexander Aleksandrov.
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
Managed by UT-Battelle for the Department of Energy SNS Injection and Extraction Systems Issues and Solutions by M. Plum for the SNS team and our BNL collaborators.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
ORNL is managed by UT-Battelle for the US Department of Energy Differential Beam Current and Errant Beam at SNS W. Blokland, C. Peters, N. Luttrell ESS,
WG2 (Proton FFAG) Summary G.H. Rees. Proton Driver Working Group  Participants: M. Yashimoto, S. Ohnuma, C.R. Prior, G.H. Rees, A.G. Ruggiero  Topics:
J-PARC Spin Physics Workshop1 Polarized Proton Acceleration in J-PARC M. Bai Brookhaven National Laboratory.
Y. R. Roblin Hall A beamline and accelerator status.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
PSB ring inhibit in the Linac 4 era A. Blas PSB LIU meeting 07/03/ Summary of discussions involving (mainly): Jose-Luis Sanchez Alvarez Philippe.
F D F November 8, 2006Alessandro G. Ruggiero1 of GeV 10-MWatt Proton Driver Target 200-MeV DTL 1.0-GeV FFAG H – Stripping Foil Injection Energy,
SNS Beam Diagnostics A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Beam losses and collimation at the Oak Ridge Spallation Neutron Source by Mike Plum Beam losses and collimators in transfer lines workshop Lund May 13-14,
Estimates of required MPS reaction time In the merger (at the centers of respective 20deg dipoles and in between 2 lenses) rms R=250 um In the
ORNL is managed by UT-Battelle for the US Department of Energy SNS beam loss and control By M. Plum ICFA mini-workshop on beam commissioning for high intensity.
SNS linac beam commissioning By Michael Plum Spallation Neutron Source Oak Ridge National Laboratory ESS Workshop on beam commissioning April 8-9, 2014.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
Managed by UT-Battelle for the Department of Energy Experience on SNS Beam Instrumentation Collaborations Willem Blokland Beam Instrumentation Group Spallation.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
The Preparation for CSNS Accelerator Commissioning Sheng Wang June 8, 2015, Dongguan.
ORNL is managed by UT-Battelle for the US Department of Energy Commissioning experience of SNS Ring By M. Plum ICFA mini-workshop on beam commissioning.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
Modeling SNS Availability Using BlockSim Geoffrey Milanovich Spallation Neutron Source.
Alexander Aleksandrov Spallation Neutron Source Oak Ridge, USA
1- Short pulse neutron source
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
SNS Timing System EPICS Workshop April 28, 2005 Coles Sibley
EPICS Meeting March 12 – 14, 2008, Shanghai, China
SNS Commissioning Mike Plum
UITF Conduct of Operations Review
Presentation transcript:

Tuning an Accelerator for 1 MW C. Peters WAO 12 August 8 th, 2012

2Managed by UT-Battelle for the U.S. Department of Energy Tuning an Accelerator for 1 MW – WAO12 The Spallation Neutron Source What – A really big microscope (nanoscope?) Produces neutrons by spallation Neutrons are used to study molecular structure and properties of materials – Really powerful and power hungry Most intense pulsed neutron source in the world 20 MW in and 1 MW out

3Managed by UT-Battelle for the U.S. Department of Energy Tuning an Accelerator for 1 MW – WAO12 The Spallation Neutron Source Where – Oak Ridge National Laboratory (ORNL) in Oak Ridge, TN – People LOVE their football (not futbol) – Oil = Awl – It’s hot and humid – Lots of mountains – Lots of really smart people

4Managed by UT-Battelle for the U.S. Department of Energy Tuning an Accelerator for 1 MW – WAO12 The Spallation Neutron Source How – Accelerator H- ion source and Linac (96 accelerating cavities) – 1 millisecond long pulse chopped into 700 nanosecond long slices – Pulsed at 60 Hz HEBT – High Energy Beam Transport Ring – Stacks 700 nanosecond slices into 1 intense pulse RTBT – Ring to Target Beam Transport – Target Mercury…….lots of neutrons

5Managed by UT-Battelle for the U.S. Department of Energy Tuning an Accelerator for 1 MW – WAO12 1 millisecond1 microsecond 2.5 nanoseconds

6Managed by UT-Battelle for the U.S. Department of Energy Tuning an Accelerator for 1 MW – WAO MHz Liquid Hg Target Ion Source 2.5 MeV 1 GeV 87 MeV CCL SRF,  = 0.61 SRF,  = MeV387 MeV DTL RFQ RTBT HEBT Injection Extraction RF Collimators 1ms Current 1 mini-pulse 2 mini-pulses 3 mini-pulses 1060 mini-pulses p+p+ Diamond Stripper Foil e-e- e-e- p+p+ e-e- e-e- H - Beam Proton Beam Liquid Hg Neutrons! Proton Beam Courtesy D. Bartkowski RFQ

7Managed by UT-Battelle for the U.S. Department of Energy Tuning an Accelerator for 1 MW – WAO12 The Spallation Neutron Source Typical numbers lately – Ion source pulse is about 36 to 38 mA for about 850 microseconds 1e14 ppp or about 17 kW per pulse – About 4500 hours of neutron production – About 630 hours of accelerator physics – Machine availability > 92% – Average about 15 short trips per day How did we get there?

8Managed by UT-Battelle for the U.S. Department of Energy Tuning an Accelerator for 1 MW – WAO12 Energy and power on target from October 2006

9Managed by UT-Battelle for the U.S. Department of Energy Tuning an Accelerator for 1 MW – WAO12 AP development then Early on (2006 – 2007) – Low power production beam (< 200 kW) – Accelerator physicists did it all Timed in linac RF cavities Ring set up Corrected orbits Set beam parameters on target at the beginning of each run and at each ion source change – Accelerator physicists tuned the beam in an emergency – Operators in general did not tune……don’t touch! Slowly operators began helping with AP studies – Short pulse, low rep rate, beam orbit tuning AP studies time decreased as neutron production time increased so operators started tuning more

10Managed by UT-Battelle for the U.S. Department of Energy Tuning an Accelerator for 1 MW – WAO12 AP development to operations As power has increased – Neutron production time dominates Operators find trends (got to do something for 12 hours) RF and quadrupole fine tuning at 60 Hz beam rep rate – BE CAREFUL

11Managed by UT-Battelle for the U.S. Department of Energy Tuning an Accelerator for 1 MW – WAO12 How to make sure operators can’t break it Machine Protection System (MPS) Errant beam controls Operation Shift Checklist Errant beam alarms & production documentation

12Managed by UT-Battelle for the U.S. Department of Energy Tuning an Accelerator for 1 MW – WAO12 Machine Protection System MPS does exactly what it states – Turns off the beam really fast (fault to beam off in ~ 20 microseconds) – Turn off RFQ and ion source pulses, and tell chopper to chop away all of the beam – FPAR (Fast Protect Auto Reset) Turns off beam, miss the next pulse, allows beam Holds beam off until operator reset if a fault happens too many times (chatter fault limit) – FPL (Fast Protect Latch) Turns off beam Operators need to know the MPS will turn off the beam – Make a mistake tuning and the MPS turns off the beam fast Gotcha – MPS signals can be bypassed – Rules in place Control Room Shift Supervisor needs expert and manager approval in order to bypass almost all MPS signals in almost all cases Control Room Shift Supervisor can bypass BLMs at 1 Hz beam repetition rate

13Managed by UT-Battelle for the U.S. Department of Energy Tuning an Accelerator for 1 MW – WAO12 Machine Protection System All signals in MPS are important, BUT – Beam Loss Monitors (BLMs) are the last line of defense About 340 ion chambers – Beginning and end of each cavity, at quads, and moveables Hardware trip for single pulse loss Software trip for monitoring activation Ion source or RF faults may not be detected by internal protection hardware – Ion source power supply malfunction not detected until BLMs in the SCL

14Managed by UT-Battelle for the U.S. Department of Energy Tuning an Accelerator for 1 MW – WAO12 Machine Protection System Problems in 2009 – SCL cavity damage possibly due to linac errant beam Ion source HV, DTL, CCL RF malfunctions – MPS delay measurements performed When a fault occurred in some instances 300 microseconds or more of beam was accelerated before MPS turned beam off Long delays found throughout MPS A few more things BLMs had chatter fault setting for 2 bad pulses in 60 cycles BLM trip limits were set too high above operating levels All fixed and looking good! – But linac errant beam continues……..

15Managed by UT-Battelle for the U.S. Department of Energy Tuning an Accelerator for 1 MW – WAO12 Linac errant beam is going to happen Differential BCM diagnostic – BCMs in CCL and HEBT showed beam is lost in the SCL (15 to 30 turns) – Most instances caused by DTL and CCL RF Undetected by RF protection module Plan for future – Differential BCM system connected to MPS for faster turn off to protect SCL Beam turn off time of 5 microseconds – Ion source beam pulse history Turn off beam if source pulse differs from previous

16Managed by UT-Battelle for the U.S. Department of Energy Tuning an Accelerator for 1 MW – WAO12 How to make sure operators can’t break it Machine Protection System (MPS) RTBT errant beam controls Operation Shift Checklist RTBT errant beam alarms & production documentation

17Managed by UT-Battelle for the U.S. Department of Energy Tuning an Accelerator for 1 MW – WAO12 RTBT errant beam controls Protect the target – RTBT BLM limits set tighter in case of kicker misfire – Ring and RTBT magnets have current windows If a power supply readback goes outside of a set window then the MPS turns off the beam – All RTBT power supplies (quads, correctors, extraction septum, DH13) » Power supply windows set based on Operations Envelope – Injection kicker power supplies waveform and extraction kicker power supplies waveform mask monitoring » Scopes running Windows XP operating system – All set prior to beam power on target exceeds 100 kW

18Managed by UT-Battelle for the U.S. Department of Energy Tuning an Accelerator for 1 MW – WAO12 How to make sure operators can’t break it Machine Protection System (MPS) RTBT errant beam controls Operation Shift Checklist RTBT errant beam alarms & production documentation

19Managed by UT-Battelle for the U.S. Department of Energy Tuning an Accelerator for 1 MW – WAO12 Operations Shift Checklist Once per shift check operating parameters – Verify important systems are working – Verify errant beam controls are engaged and working properly – If something is not correct then fix it – Elog completed checklist Operators have created an OS checklist script – Verify parameters are within spec, run script, and the script elogs the checklist

20Managed by UT-Battelle for the U.S. Department of Energy Tuning an Accelerator for 1 MW – WAO12 How to make sure operators can’t break it Machine Protection System (MPS) RTBT errant beam controls Operation Shift Checklist RTBT errant beam alarms & production documentation

21Managed by UT-Battelle for the U.S. Department of Energy Tuning an Accelerator for 1 MW – WAO12 Production documentation At beginning of run and at each ion source change – Document beam parameters Beam positions in the injection dump Beam size on target Beam peak density on target Beam position on target – Wiki-ized list of parameters to save

22Managed by UT-Battelle for the U.S. Department of Energy Tuning an Accelerator for 1 MW – WAO12 Errant beam alarms Alarms set based on the production documentation and errant beam controls – Monitoring errant beam controls always – Monitoring beam parameters always +/- 10% in harp beam size +/- 6 mm by +/- 4 mm target position +/- 10% in beam peak density on target (measured at the harp) +5% in beam power on target +20% in beam power on injection dump – Values are set using Control System Studio (CSS) CSS records information in the elog

23Managed by UT-Battelle for the U.S. Department of Energy Tuning an Accelerator for 1 MW – WAO12 Errant beam alarms Alarms are very important for tuning – Systems are tied together Change position at the foil to reduce beam loss and beam size on target changes – EDM page displays documented parameters from tune up Don’t have to search through elog or notebook to find what the parameters should be

24Managed by UT-Battelle for the U.S. Department of Energy Tuning an Accelerator for 1 MW – WAO12 AP development to operations now How things have run recently – Accelerator physicists and operators together set up Linac RF and Ring for 5 month run Time in linac RF cavities (1-2 shifts) Ring set up (1-2 shifts) AP studies begin (the interesting stuff) – When physicists are done playing Machine specialist and operators – Correct orbits – Set beam parameters on target – Production documentation at the beginning of the run and at each ion source change for the remaining run – Operators own production

25Managed by UT-Battelle for the U.S. Department of Energy Tuning an Accelerator for 1 MW – WAO12 AP development and operations future Eliminate time consuming tasks – Target Imaging System Use this system to determine target parameters instead of prediction based on RTBT beam sizes – RID Imaging System Add imaging system to the Ring injection dump Move machine setup to operators (Guns, germs, and steel) – Automate and speed up repetitive tasks Now have an automated SCL RF cavity phasing and scaling (warm linac a different story) Production documentation – Create thorough beam tuning recipes Creates more time for AP studies and new ideas!!!