Www.dot.state.pa.us 1of 27 GUSSET PLATE EVALUATION Tom Macioce, P.E. Chief Bridge Engineer April 2009 PennDOT Load Rating of Gusset Plates.

Slides:



Advertisements
Similar presentations
HELP !!!!!! International border bridge located over the Rainy River on the Minnesota Trunk Highway 72 and Ontario Provincial Highway 11 This route provides.
Advertisements

Idaho Load Rating Program
PHMSA Perspectives Construction Process & Standards
District 8-0 QA Review Trends Summary Documentation and Certification Project certifications for materials should be reviewed as they.
Office of Research and Engineering Gusset Plate Inadequacy Carl R. Schultheisz.
National Bridge Inspection Standards (NBIS)
Design and Rating for Curved Steel I- and box-girder Bridge Structures
Thomas Saad, P.E. Senior Structural Engineer Federal Highway Administration Phone: (708)
CIVL3310 STRUCTURAL ANALYSIS
2015 Winter School Structures Heidi A. Mertz, P.E. District 8-0 Structure Control Engineer.
Virtis/Opis Technical Update Virtis Opis Bridgeware User Group 2011 Conference Helena, Montana 1.
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Office of Highway Safety Bridge Load Rating Dan Walsh.
Office of Research and Engineering Finite Element Analysis Carl R. Schultheisz.
Office of Highway Safety Bridge Inspections Dan Walsh.
Driving Indiana’s Economic Growth. Management and Preservation of Indiana's Historic Bridges: A Programmatic Approach Thanks to Mead & Hunt & FHWA-IN.
The Waddell A-Truss Bridge
Presenter: CIWQS – eSMR Redesign Presenter: Amy Tong, Darrin Polhemus and Akin Babatola 1.
Office of Highway Safety Gusset Plate Inspection Issues Mark Bagnard.
May 15-16, 2012 Orange Beach, AL James F Boyer, P.E. Assistant State County Transportation Engineer - Maintenance.
LRFR vs. LFR Virtis Opis User Group Meeting, August 2, 2011
I. Truss Bridge Gussets Background
PA Non-composite Adjacent Box Beam Bridges PennDOT June 2006 A presentation adapted from the AASHTO T-18 Bridge Inspection Technical Committee Meeting.
“Reaching across Arizona to provide comprehensive quality health care for those in need” Our first care is your health care Arizona Health Care Cost Containment.
NBIS – National Bridge Inspection Standards National standards for the proper safety inspection and evaluation of all hwy bridges NBI – National Bridge.
Webinar on Load Rating of Gusset Plates in Steel Truss Bridges by the LFR Method September 24, :00 p.m. to 3:30 p.m. Sponsored by FHWA in Cooperation.
ANALYSIS OF STATICALLY DETERMINATE TRUSSES
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
Structural Engineering Design and Drafting
Design and Rating for Curved Steel I- and box-girder Bridge Structures
National Bridge Inventory Coding Guide Update Pontis Users’ Group Meeting September 5-6, 2007 Portland, Maine.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
A Load Rating of a 3 Span Continuous Deck-to- Through Truss Bridge in Br|R AASHTOWare BrDR 2013 User Group Meeting A Load Rating of a 3 Span Continuous.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
International Speedway Boulevard Stakeholders Task Force (STF) Meeting 1 Wednesday, May 19, 2010.
Laboratory Field Services Regulations 2015
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Payer User Group Webinar – 7/31/2014. Agenda Welcome (5 minutes) ◦Opening Comments/ Review ◦Meeting Goals Chapter 243 Changes (25 minutes) ◦Clarification.
Strategic Planning Deanna Herwald Vice President-Quality Management Systems.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
1 PennDOT Truss Gusset Plate Analysis and Ratings Spreadsheet Overview Karim Naji Assistant Structural Engineer FHWA PA Division
A Paper from the Transportation Research Record
US Army Corps of Engineers BUILDING STRONG ® FIMS Annual Comprehensive Training Bridge File Content and Management May 2016.
Investigation of the Effects of End Region Deterioration in Precast, Prestressed Concrete Bridge Girders Royce Floyd, Cameron Murray, Darion Mayhorn DONALD.
Introduction Signing for Interchanges Naming Convention
Guidance on completion of Isoniazid Preventive Therapy register
Inspector's Role and Responsibilities
Inspector's Role and Responsibilities
Traceability of Gas Pipeline Materials Research & Materials Manager
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
TIMELINES PHOTOS This is an example text
TIMELINES PHOTOS This is an example text
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Bridge Construction This is the week 5 PowerPoint presentation.
Tracking new discoveries using file history
2017/18 Payment Calendar Due Date Cut-off Day 1st of every month
McDonald’s Kalender 2009.
2300 (11PM) September 21 Blue line is meridian..
McDonald’s calendar 2007.
What’s new in Bridges ABCD March 2019
Proud As A Peacock! We are very proud of__________________
McDonald’s calendar 2007.
POC: ASAP Prevention Branch Chief (706)
Production Month Sun Hours K Monthly Kwh Tou Peak Value After Kwh
2015 January February March April May June July August September
Presentation transcript:

1of 27 GUSSET PLATE EVALUATION Tom Macioce, P.E. Chief Bridge Engineer April 2009 PennDOT Load Rating of Gusset Plates

of 272 PennDOT Load Rating of Gusset Plates Overview PennDOT Gusset Plate Evaluations PennDOT Inspection Requirements PennDOT Rating Spreadsheet Target Dates Summary

of 273 PennDOT Truss Gusset Plate Evaluation Inventory steel trusses identified (174 state-owned, 146 locally-owned) PennDOT required all deck trusses (54) be re- inspected by August 30, 2007, and all non-SD deck truss bridges by November 30, 2007 Cost - $2M for the re-inspection of deck trusses Cost - $2M for rating of gusset plates

of 274 PennDOT Truss Gusset Plate Evaluation PennDOT began development of gusset plate analysis spreadsheet in February 2008 Permit load analysis approach –Heavy hauling permits evaluated using Bar 7 –Assume reduced capacity of truss members framing into gusset plates –Reduced member capacity approach will be used until the gusset plate analysis option is incorporated into BAR7

of 275 PennDOT Truss Gusset Plate Evaluation Spreadsheet development completed in accordance with FHWA technical advisories- October 2008 Both LFD and ASD analysis methods supported BAR 7 output file load data used in spreadsheet Evaluates O.R. only 3 man-days to analyze and check a truss bridge 1.5 Hours per joint for a standard truss 2.5 hour per joint for a complex truss Additional hours required for field inspections

of 276 PennDOT Truss Gusset Plate Evaluation Administration –Strike Off Letter ( ) issued February 11, 2009 Updates to Publication 238 Chapters 3 and 6 addressing gusset plate analysis. Developed Deck Truss Geometry Field Inspection Sheet

of 277 PennDOT Inspection Requirements Revised inspection training September 2008 Issued policy February 2009 Strike-Off Letter

of 278 PennDOT Inspection Requirements Emphasis on- Distortion or bowing Corrosion documentation Tack weld documentation Slippage of connections Repairs/retrofits (condition and performance) NDE follow-up Capture necessary field data to properly load rate the gusset plate

of 279 Annotated data extraction from BAR 7 Inspection –Forms –Digital Photo Measurements PennDOT Rating Spreadsheet BAR 7 or STAAD Shop Drawings Field Data Analysis

of 2710 PennDOT Rating Spreadsheet Several months to develop Tested on 7 bridges, primarily Interstate bridges 5 engineers involved in verification

of 2711 Target Dates Important Milestones - Strike Off Letter ( ) issued March 10, 2009 –State owned bridges analyzed by December 31, 2009 –Local owned bridges analyzed by December 31, Revise BAR7 to include gusset plate analysis December 2009

of 2712 Status of Analysis Districts to provide monthly status reports for tracking progress State –Completed 54 –Under Analysis 98 –Future Work Orders 31 Local –Completed 52 –Under Analysis 11 –Future Work Orders 86

Issues Continuous chord members through gusset plate Welded connections –Plates are analyzed for shear –Weld strengths analyzed by supplemental hand calculations QA reviews of analysis is required 1 bridge has required posting due to gusset plate rating –Deck Truss –Bearing location –Section loss along top chord Leaking deck joint of 2713

of 2714 Summary Evaluation will provide additional level of bridge safety FHWA Technical Guidance is appropriate Elected to perform rating as opposed to a screening process Revise BAR7 to include gusset plate analysis December 2009