E-mail Technical Coordinators Meeting Chris Bongaarts Steve Siirila April 12, 2006.

Slides:



Advertisements
Similar presentations
MoFo and Disaster Recovery August 24, 2004 Bruce Friedman Infrastructure Manager
Advertisements

Managing Incoming Chapter 3 Bit Literacy. Terminology client – program which retrieves s from a mail server, lets you read the mails,
Technical Coordinators Meeting Jeff Williams November 12, 2009.
© 2008 Waterford Technologies, Inc. All Rights Reserved & File Archiver Benefits Understand Primary Storage Usage Optimise Primary Storage Control.
Technical Coordinators Meeting Chris Bongaarts Steve Siirila September 7, 2005.
1 Resolving Host Selector Issues. 2 Table of Contents Page 3 - 6: User unable to connect to an account. Page 7: Host Selector crashing. Page 8 - 9: Saving.
MCSE Guide to Microsoft Exchange Server 2003 Administration Chapter 14 Upgrading to Exchange Server 2003.
Iron Mountain’s Continuity Service ©2006 Iron Mountain Incorporated. All rights reserved. Iron Mountain and the design of the mountain are registered.
Technical Coordinators Meeting Kevin O’Rourke Steve Siirila Jan 9, 2008.
Technical Coordinators Meeting Steve Siirila Chris Bongaarts Feb 13, 2008.
Staff Computer Training Exchange 2003: More User Friendly Vicki Hecht Cherry Delaney ITaP Luncheon October 14, 2003.
Technical Coordinators Meeting Chris Bongaarts Steve Siirila February 9, 2005.
Technical Coordinators Meeting Chris Bongaarts Steve Siirila January 12, 2005.
Technical Coordinators Meeting Steve Siirila Chris Bongaarts May 7, 2008.
Technical Coordinators Meeting Chris Bongaarts Steve Siirila March 8, 2006.
Technical Coordinators Meeting Chris Bongaarts Steve Siirila October 13, 2004.
Technical Coordinators Meeting Chris Bongaarts Steve Siirila June 8, 2005.
Pro Exchange SPAM Filter An Exchange 2000 based spam filtering solution.
Module 8 Implementing Backup and Recovery. Module Overview Planning Backup and Recovery Backing Up Exchange Server 2010 Restoring Exchange Server 2010.
1. Preventing Disasters Chapter 11 covers the processes to take to prevent a disaster. The most prudent actions include Implement redundant hardware Implement.
Technical Coordinators Meeting Chris Bongaarts Steve Siirila January 11, 2006.
Norman SecureTide Powerful cloud solution to stop spam and threats before it reaches your network.
November 2009 Network Disaster Recovery October 2014.
IT:Network:Applications Fall  Running one “machine” inside another “machine”  OS in Virtual machines sees ◦ CPU(s) ◦ Memory ◦ Disk ◦ USB ◦ etc.
Brown University Exchange 2003 Molly Baird Manager, Windows-Novell Services.
Please click here to proceed... Microsoft XP Migration for the Desktop.
MIGRATING FROM MICROSOFT EXCHANGE SERVER AND OTHER MAIL SYSTEMS Appendix B.
INSTALLING MICROSOFT EXCHANGE SERVER 2003 CLUSTERS AND FRONT-END AND BACK ‑ END SERVERS Chapter 4.
Technical Coordinators Meeting Chris Bongaarts Steve Siirila November 9, 2005.
Technical Coordinators Meeting Chris Bongaarts Steve Siirila January 10, 2007.
1 Microsoft Exchange 2000 Server Maintenance and Troubleshooting System Maintenance and Monitoring Database Operation and Maintenance Backup, Restore,
Technical Coordinators Meeting Chris Bongaarts Steve Siirila February 8, 2006.
Archiving s. How to Manage Auto-Archive in Outlook Your Microsoft Outlook mailbox grows as you create and receive items. To manage the space.
Electronic Records Management: A Checklist for Success Jesse Wilkins April 15, 2009.
Technical Coordinators Meeting Chris Bongaarts Steve Siirila December 7, 2005.
Portal User Group Meeting June 13, Agenda I. Welcome II. Updates on the following: –Migration Status –New Templates –DB Breakup –Keywords –Streaming.
Mail Attender for Exchange Technical Overview Presentation Introduction Sherpa Software Group Narrated by Thomas Hand Approximate Time 15 minutes.
Technical Coordinators Meeting Chris Bongaarts July 9, 2008.
SPAM Settings. The ExchangeDefender Admin Site is a powerful tool that gives you access to all of the benefits ExchangeDefender has to offer, from the.
Technical Coordinators Meeting Steve Siirila Chris Bongaarts April 9, 2008.
Technical Coordinators Meeting Chris Bongaarts Steve Siirila July 13, 2005.
Module 3 Planning and Deploying Mailbox Services.
Technical Coordinators Meeting Jeff Williams October 8, 2009.
Technical Coordinators Meeting Steve Siirila May 11, 2005.
Technical Coordinators Meeting Chris Bongaarts Steve Siirila September 13, 2006.
Technical Coordinators Meeting Chris Bongaarts Steve Siirila March 9, 2005.
Technical Coordinators Meeting Chris Bongaarts September 10, 2008.
MCSE Guide to Microsoft Exchange Server 2003 Administration Chapter One Introduction to Exchange Server 2003.
Technical Coordinators Meeting Jeff Williams August 13, 2009.
Carnegie Mellon Computing Services 2/15/2001 v1.2DRAFT1 Systems Development Joseph Jackson Walter Wong.
Technical Coordinators Meeting Steve Siirila August 9, 2006.
Technical Coordinators Meeting Chris Bongaarts Steve Siirila Jeff Williams November 12, 2008.
Technical Coordinators Meeting Steve Siirila Chris Bongaarts February 12, 2008.
Technical Coordinators Meeting Steve Siirila Jeff Williams July 9, 2009.
Technical Coordinators Meeting Steve Siirila Brian Hayden Jeff Williams June 11, 2008.
Technical Coordinators Meeting Chris Bongaarts Steve Siirila Oct 10, 2007.
OCLC ILLiad hosted service March 18 th, 2010 The who, what, why, when and how of ILLiad hosting.
Technical Coordinators Meeting Jeff Williams September 10, 2009.
Exchange and Anti-Virus Teresa Downey SLAC.
A leap ahead... Darren Kearney Don Miller Ilya Pinchuk.
FNAL Central Systems Jack Schmidt, Al Lilianstrom, Ray Pasetes, and Kevin Hill (Fermi National Accelerator Laboratory) Introduction The FNAL .
Technical Coordinators Meeting
Mark Norman and Ray Miller Sysdev Team
Technical Coordinators Meeting
Technical Coordinators Meeting
Technical Coordinators Meeting
Technical Coordinators Meeting
What is it? Why do I keep getting from Barracuda? SPAM.
Technical Coordinators Meeting
Managing Private and Public Folders
Presentation transcript:

Technical Coordinators Meeting Chris Bongaarts Steve Siirila April 12, 2006

Server Upgrades Clustering preparations Clustering preparations –User management changes –Shared filesystem testing (QFS) Dovecot IMAP/POP server Dovecot IMAP/POP server –Indexes mailboxes for faster performance –Rebuilds missing/corrupted indexes on- the-fly

Server Upgrades Evaluating new Sun hardware (T2000) Evaluating new Sun hardware (T2000) –Claim: same performance as V890 for 15% of physical space 15% of physical space 10% of power 10% of power 20% of price 20% of price –We shall see… –Requires Solaris 10

Storage Policies Nightly backups of inbox & home (e.g. IMAP folders, web-docs) Nightly backups of inbox & home (e.g. IMAP folders, web-docs) Retained for 2 weeks Retained for 2 weeks Intended for disaster recovery Intended for disaster recovery Legal issues re: backup retention Legal issues re: backup retention Deleted users Deleted users –Backups retained 90 days –Restored upon account reactivation

Aphelion Directory 3 LDAP servers fully populated and actively updated 3 LDAP servers fully populated and actively updated Awaiting physical space for 4 th server Awaiting physical space for 4 th server Rolling out production use first as additional ldap.umn.edu servers Rolling out production use first as additional ldap.umn.edu servers Required for new version of messaging software Required for new version of messaging software

GopherMail Rollout page includes GopherMail link as of 3/27 page includes GopherMail link as of 3/27 HTTP connection limit artificially caused performance issues until 3/29 HTTP connection limit artificially caused performance issues until 3/29 Excellent response time resumed after connection limit increased Excellent response time resumed after connection limit increased

IMAP Usage for Mon 4/10

MTA Rate Limiting Proposal Unclassified MTAs: Unclassified MTAs: –0 to 8 hours old: 1 message/hour –8 to 36 hours old: 10 messages/hour –Listed on block list: 1 message/day MTAs classified as bulk or protected: MTAs classified as bulk or protected: –No rate limiting

How Spam Reports Help Current spam reports are tallied by IP Current spam reports are tallied by IP Summaries of spam reports are generated at least once daily Summaries of spam reports are generated at least once daily Offending sites are re-greylisted or blocked as appropriate Offending sites are re-greylisted or blocked as appropriate Researching ways to automate the above Researching ways to automate the above Please report spam: it benefits all of U! Please report spam: it benefits all of U!

Phase-out of unauthenticated SMTP Relaying thru smtp-gw.tc.umn.edu turned off 3/29 Relaying thru smtp-gw.tc.umn.edu turned off 3/29 4/10: 696 IP addresses registered for relay.tc.umn.edu service 4/10: 696 IP addresses registered for relay.tc.umn.edu service

Bits ‘N Bytes Planning to transition to central e- mail? Contact for assistance. Planning to transition to central e- mail? Contact for

‘Till next month… Steve Siirila Steve Siirila Chris Bongaarts Chris Bongaarts