1 Introduction Faculty of Applied Engineering and Urban Planning Civil Engineering Department Week 1 2 nd Semester 2008/2009 UP Copyrights 2008 Construction.

Slides:



Advertisements
Similar presentations
1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Advertisements

Construction Contracting
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
OUTSOURCING INDUSTRIAL WASTEWATER TREATMENT Jerzy Kołłajtis – Magda Trybuch –
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
CE-332 CONSTRUCTION ENGINEERING AND MANAGEMENT
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
I-THE OWNER’S PERSPECTIVE
PROJECT DELIVERY SYSTEMS
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
PROCEDURES FOR SELECTING THE CONTRACTOR
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
APPLICATION OF CONTROLS CHAPTER 8 Presenting by : Mustafa Al tayeb Date 21/11/2005.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Chistyakova Nataly O.. Project stakeholders The client is the principal party interested in the carrying out of a project and in its successful outcome.
Chapter 2 A Strategy for the Appraisal of Public Sector Investments.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
Accounting Specialist Basic Functions : To provide essential data by computing and distributing collections to their respective allocations. Knowing the.
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
Chapter 1 Professional Architectural Careers, Office Practices, and Opportunities.
Project Planning & Control 1 ECCS5209 Project Planning & Control Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lect. 2+3.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Construction Management: At Risk. PROJECT MANAGEMENT STRUCTURE: Contractual Relationships Owner Architect/Engineer General Contractor Sub Construction.
Dr. Hany Abd Elshakour 9/7/ :22 PM1. Dr. Hany Abd Elshakour 9/7/ :22 PM2 Engineering Project: Participants and Life Cycle.
Construction Project Management
FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.
Industrial Engineering Roles In Industry
CONSTFUNDAMENTALSCONSTFUNDAMENTALS Overview of the Construction Industry, Chapter 2.
Technical Manager; Bechtel Oil, Gas & Chemicals.
Construction Contracts and Project Delivery Methods
TOPIC-9- PROJECT ORGANIZATION
PLANNING AND SCHEDULING
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Construction Why Construction The Construction Which are closely related to swimmingly project completion Which Mean: every thing related to Project participants.
Construction Engineering and Management 1 Cost Benefits Structural Safety Architect Feasibility Assessment of architects Functional Aesthetic constructability.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
ECCS5209 Project Planning & Control Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lect. 1 2 nd Semester 2008/2009 UP Copyrights.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Preparing the Bid Package (A Developers Perspective)
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Ch 91 IT-390Cost Analysis. 2 Project Estimating (Design) l A Project Estimate is one of a kind n Custom design, only one will be manufactured n Capital.
Chapter 13 Project Management. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Define and give.
Marketing & Tendering. Budget Forecasting Profit is the key to Business Success – Profit is amount of money after all expenses Materials Labour Insurances.
Agency Construction Management :CM NOT AT-RISK
Information System Project Management Lecture three Chapter one
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
TOPIC-9- PROJECT ORGANIZATION
FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING SPRING SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
PROJECT CONCEPTION AND MONITORING PRESENTED BY: OLOJEDE SAMSON OLUSOLA DEPUTY BURSAR UNIVERSITY OF IBADAN 5 TH APRIL, 2016.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
Constructing Recreation Facilities 8 chapter. Groundbreaking Before the construction begins, a groundbreaking ceremony is often held in recognition of.
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
Subtitle Statement of Capabilities.
Systems Analysis and Design in a Changing World, 4th Edition
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
PROJECT MANAGEMENT (ARCH 484) DEPARTMENT OF ARCHITECTURE & BUILDING SCIENCE.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
ELECTRICAL ESTIMATING SOLUTIONS, PROVIDING BEST SERVICES IN AUSTRALIA.
Introduction DEFINATION :-
The emphasis of Construction Management and Preconstruction Services in the AEC industry Preconstruction Services Construction Management.
Presentation transcript:

1 Introduction Faculty of Applied Engineering and Urban Planning Civil Engineering Department Week 1 2 nd Semester 2008/2009 UP Copyrights 2008 Construction Project Management Eng: Eyad Haddad

2 Chapter 1: Introduction 1.1 The Construction Project A construction project, or any project, is defined by the following - A defined goal or objective. - Specific tasks to be performed. - A defined beginning and end. - Resources being consumed (manpower+ materials). The goal of construction project is to build something. The differentiation between construction industry and other industries is that its projects are large, built on-site, and generally unique. Time, money, labor, equipment, and, materials are all examples of the kinds of resources that are consumed by the project.

3 1.2 The Need for Project Management ( for many Reasons )  The construction industry is the largest industry in the world. Growth in this industry in fact is an indicator of the economic conditions of a country. This is because the construction industry consumes a wide employment circle of labor  The manufacturing industry exhibit high-quality products, timelines of service delivery, reasonable cost of service, and low failure rates, the construction industry, on the other hand, is generally the opposite.  Most projects exhibit cost overruns, time extensions, and conflicts among parties.

4 Example of a complicated project

5 Construction industry challenging In general, the construction industry is more challenging than other industries due to:  its unique nature;  every project is one-of a kind;  many conflicting parties are involved;  projects are constrained by time,  money and quality;  and high risk.

6 1.3 The Project Life Cycle  The acquisition of a constructed facility usually represents a major capital investment, whether its owner happens to be an individual, a private corporation or a public agency.  The commitment of resources for such an investment is motivated by  market demands.  or perceived needs.  The project life cycle for a constructed facility may be illustrated schematically in Figure 1.2.  A project is expected to meet market demands or needs in a timely fashion.

7

8 A) Preconstruction Phase B) Procurement Phase (bidding & award) C) Construction Phase D) Closeout Phase A-1 Conceptual Design A-2 Schematic Design A-3 Design Development A-4 Contract Documents The Project Life Cycle

9 The project phases can be summarized as follows: Preconstruction phase The preconstruction phase of a project can be broken into conceptual planning, schematic design, design development, and contract document Conceptual design: - Very important for the owner. - During this stage the owner hires key consultants including the designer and project manager, selects the project site, and establish a conceptual estimate, schedule, and program. -The owner must gather as much reliable information as possible about the project. - The most important decision is to proceed with the project or not.

10 Schematic design: - During this phase, the project team investigates alternate design solutions, materials and systems. -Completion of this stage represents about 30% of the design completion for the project. Design development: - Designing the main systems and components of the project. - Good communication between owner, designer, and construction manager is critical during this stage because selections during this design stage affect project appearance, construction and cost. - This stage takes the project from 30% design to 60% design. Contract documents: - Final preparation of the documents necessary for the bid package such as the drawings, specifications, general conditions, and bill of quantities. - All documents need to be closely reviewed by the construction manager and appropriate owner personnel to decrease conflicts, and changes. - With the contract documents are almost complete; a detailed and complete cost estimate for the project can be done

Procurement phase (Bidding and award phase) - The project formally transits from design into construction. - This stage begins with a public advertisement for all interested bidders. - In fast-track projects, this phase overlaps with the design phase. - If the project is phased, each work package will be advertised and bid out individually. - It is very important stage to select highly qualified contractors Construction phase - The actual physical construction of the project stage. - This stage takes the project from procurement through the final completion. - It is the time where the bulk of the owner ’ s funds will be spent. - It is the outcome of all previous stages (i.e., good preparation means smooth construction). - The consultant will be deployed for contract administration and construction supervision. - Changes during construction may hinder the progress of the project.

Closeout phase - Transition from design and construction to the actual use of the constructed facility. - The management team must provide documentation, shop drawings, as built drawings, and operation manuals to the owner organization. - Assessment of the project team ’ s performance is crucial in this stage for avoiding mistakes in the future. - Actual activity costs and durations should be recorded and compared with that was planned.

13

Major Types of Construction Projects Residential Housing Construction: Residential housing construction includes houses and high-rise apartments Institutional and Commercial Building Construction such as schools and universities, medical centers and hospitals, sports facilities, shopping centers, warehouses and light manufacturing plants, and skyscrapers for offices and hotels Specialized Industrial Construction: Specialized industrial construction usually involves very large scale projects with a high degree of technological complexity, such as oil refineries, steel mills, chemical processing plants and coal-fired or nuclear power plants Infrastructure and Heavy Construction: such as highways, tunnels, bridges, pipelines, drainage systems and sewage treatment plants.

15 Job Supervisors Subs Owners Corporate Managemen t Field Labor Design Center Sales & Marketing Accounting Scheduling Purchasing Estimating Local Municipalitie s Banks & Mortgage Lendors Manufacturers Suppliers RE Agents Too Many Participants 1.5 Construction Project Participants

Construction Project Participants The Owner (The Client) He is the individual or organization for whom a project is to be built under a contract. He owns and finances the project. Depending on the owners ’ capabilities, they may handle all or portions of planning, project management, design, engineering, procurement, and construction. Public owners Private owners The Design Professionals Architects, engineers, and design consultants. The major role of the design professional is to interpret or assist the owner in developing the project ’ s scope, budget, and schedule and to prepare construction documents. Depending on the size and sophistication of the owner.

The Construction Professionals The constructions Professional are the parties that responsible for constructing the project. In traditional management where the owner, design professional, and contractors are separate companies, the contractor would be termed a prime contractor. The prime contractor is responsible for delivering a complete project in accordance with the contract documents. In most cases, the prime contractor divides the work among many specialty contractors called subcontractors as shown in Figure 1.4.

The Project Manager Is the individual charged with the overall coordination of the entire construction program for the owner. These include planning, design, procurement, and construction. Among his/her duties: - Clear definitions of the goals of the project. - Investigate alternative solutions for the problems. - Develop a detailed plan to make the selected program reality. -Implement the plan and control the project. Construction Manager : is a specialized firm or organization which administrates the on-site erection activities and the consulting services required by the owner from planning through design and construction to commissioning. The construction manager is responsible for design coordination, proper selection of materials and methods of construction, contracts preparation for award, cost and scheduling information and control.

19 CONSTRUCTION INDUSTRY

20 The Construction Team The principal participants/key players in any construction project include: The Owner The Design Professional (Architect & Engineers) The Contractor

21 The Construction Team ARCHITECT CONTRACTOR CONTRACT

22 Exercise 1 Submit a report of 3 to 5 pages about one of the mega projects that has been constructed in Caza strip or any where in the world. In your submittal, please state clearly the following information: 1. Summary about the project 2. Stages of the project 3. Type of the project 4. Type of the contract 5. Planned construction duration 6. Budgeted construction cost 7. Actual duration 8. Actual cost 9. Main obstacles that faced the construction 10. Methods of construction used 11. Any other information that you might find it is necessary Students may use the World Wide Web, Magazines, Journals, Newspapers, Books, Etc. Examples include: - Civil Engineering Magazine (American Society of Civil Engineers) - Canadian Civil Engineering magazine (Canadian Society of Civil Engineers) - Engineering News Record (ENR) مجلة نقابة المهندسين الفلسطينية - مجلة عالم البناء المصرية - مجلة قطر للإنشاء - - Any other sources you might find Please make sure that you don ’ t copy your colleagues work.