CONTROLLING TIME. ”Remember that time is money” Benjamin Franklin 1748.

Slides:



Advertisements
Similar presentations
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
Advertisements

IX- CONSTRUCTION PLANNING
Complaints An Overview for Staff Prepared by MSM Compliance Services Pty Ltd.
LECTURE 7 CLAIMS RELATED TO SUB-CONTRACTORS
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
Critical Path and Gantt
Chapter 14 Schedule Risk Management Dr. Ayham Jaaron Second Semester 2010/2011.
Systems Analysis and Design 9th Edition
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
© The McGraw-Hill Companies, Software Project Management 4th Edition Monitoring and control Chapter 9.
Project management A whistle-stop tour Toot!. Places to see Overview Project design in detail Task analysis example Design documentation examples Terminus.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 2 Key CPM Scheduling Terms.
Importance of Project Schedules
SWE Introduction to Software Engineering
4.0 CRITICAL CHANGE IN PROJECT MANAGEMENT 4.1 Why should there be need other methods for Project Management to replace or change? Given the level of project.
Development and Quality Plans
Project Planning Day 2 An Old Adage: Fail to Plan... and You Plan to Fail!
Chapter 10 Project Monitoring and Control
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Insurance provisions under JCT 1998 and JCT Standard Building Contract 2005 Brian Lewis – QBE CAR.
Project Monitoring and Control. Monitoring – collecting, recording, and reporting information concerning project performance that project manger and others.
HIT241 - TIME MANAGEMENT Introduction
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
Lesson №2. is the unique activity that has a beginning and an end time, aimed at achieving a predetermined result/goal, the creation of a specific, unique.
CRAFTMAN Builder Lic c CRAFTMAN Builder Lic c New Homes, Extensions & Renovations Who is Craftman? CRAFTMAN is an established construction.
Project ManagementDay 1 in the pm Project Management (PM) Structures.
Appendix A Project Management: Process, Techniques, and Tools.
BUSINESS PLUG-IN B15 Project Management.
Chapter 6 : Software Metrics
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Managing Project Through Information System.  Monitoring is collecting, recording, and reporting information concerning any and all aspects of project.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
1. Introduction Time is of essence in basically every construction project Yet, delays of some sort are general rule, rather than the exception Consequence:
Quick Recap.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
1 Chapter 5 Project management. 2 Project management : Is Organizing, planning and scheduling software projects.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Chapter 15 Construction Scheduling. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Project management Lecture 10. Topics covered Management activities Project planning Project scheduling Risk management.
Project Time Con trol. Control = Monitor + Compare + Analysis + Action  Definition: Controlling  Controlling involves making sure that the results achieved.
Project monitoring and Control
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
T.L. Martin & Associates Copyright © 2008 Chapter 1 Fundamentals of Scheduling T.L. Martin & Associates, Inc Office Park Drive Gaithersburg, Maryland.
LECTURE 4 FORMULATION & PRESENTATION OF MONETARY CLAIMS  Recovery of Loss / Expenses / Damages  Notice of intention to claim  Particular and further.
FORMULATION & PRESENTATION OF EOT CLAIMS
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Collecting requirements – Different methods Defining scope – Estimates for all resources Creating the WBS – Different approaches Verifying scope – Formal.
11/9/2015 9:42 AM 1 Project Time Control. 11/9/2015 9:42 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
PROGRAMMING Frank Ellis B.Sc. ARSM Thursday 26th March 2015
Project Management.
Project Management Inspections and Reviews 1 February.
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Path and MS Project 2003 Tuesday, February.
1 PROJECT MONITORING & CONTROL. 2 Project Monitoring and Control Why do we monitor? What do we monitor? When to we monitor? How do we monitor?
CLAIMS MANAGEMENT. PRESENTATION OUTLINE INTRODUCTION TYPICAL CLAIMS AGAINST OWNER TYPICAL CLAIMS AGAINST CONTRACTOR CRITICAL PATH METHODS UTILIZATION.
3.0 DESIGN PROCESS FOR THE PROPOSED PROJECT 3.1 TIME PLANNING Now, having understanding the Project Management in general and its strategy in the project.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
Project Management ISE 5101 Karl Smith Project Monitoring & Control I Project Meetings.
PROJECT CONCEPTION AND MONITORING PRESENTED BY: OLOJEDE SAMSON OLUSOLA DEPUTY BURSAR UNIVERSITY OF IBADAN 5 TH APRIL, 2016.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
SCHEDULE MANAGEMENT MODULE 8. Required by Specification City/Caltrans Level 1 schedule – simple Less than $1 million, less than 100 working days Advanced.
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Extension of time and how it is granted to a contractor (Referencing JCT 2005)
Chapter 6: Project Time Management
Monitoring and Information Systems
Project management Learning Unit 5.
Project Planning By Phaik San Liew.
Lecture 7 PROJECT SCHEDULING Ferdinand Fassa.
Importance of Project Schedules
Presentation transcript:

CONTROLLING TIME

”Remember that time is money” Benjamin Franklin 1748

Tunnel project Hallandsås Construction started in 1989 and the expected finish was then 1997 Today the new estimated time for completion is set to years delay!!! The total cost for the construction was planned to be around €100 M The new updated total project cost is planned to be €1050 M

Controlling time is all about managing project and delays as effective as possible and to plan for every possible risk to avoid delays and disruptions which will lead to increased construction costs.

Time planning is a key function in the construction management process. Constructions seldom follows the plan exactly and the original time plan often has to be reviewed many times before completion. It is therefore crucial that the original planning process includes the possibility to follow-up and adjust the progress accordingly.

This is executed through the Contract Master Programme which is were the contractor and client can monitor the on-going progress of the project. The contract master programme is in practice a schedule or chart which is a living constantly updated document which is distributed to all involved parties is the project.

A detailed time planning process can help you avoid many of the possible risks in a construction project. The planning can also help to solve who is responsible for the potential delay. There are always risks that is impossible to plan for, weather delays and accidents for example. If the delay or disruption occurs there is almost certain that there will be a dispute in who did what and why. It is therefore very important with a carefully developed contract written between all parties

Gantt (bar) chart with no logic links Linked bar chart showing program logic Precedence network Critical path analysis (arrow) diagram Line of balance Time-chain age diagram A combination of above Contractor's master program In every project you need to do a contractor's master program and that can be for example:

Milestones are symbols shown on the contractor's program - normally shown by using a small diamond shape (♦) - that are especially useful in programming and delay analysis. Milestones have duration of zero but can still be linked to the program logic in the usual way. Milestones

Progress and Delay 1.The contractor notifies the contract administrator that the works have been or are likely to be delayed beyond the contract completion date 2.The contract administrator then has a set amount of time to consider the situation. 3.If the delay is the employer's fault: The contract administrator will make a decision to grant the contractor an extension of time 4.If the delay is the contractor's fault: The contract administrator will remind the contractor of the contract completion date and his contractual obligation to proceed regularly and diligently with the works 5.In either case, the contractor’s master program will be an important reference point to assist the contract administrator in coming to a decision. Regular updates

Progress recording Procedure for recording progress.

Progress recording procedures in practice. Progress recording on the bar chart.

Progress recording by color coding. Progress recorded by computer. The monthly site progress report.

It's rather common in construction projects with delays and disruptions. There is lots of reasons why you might get delays/disruptions. Around 40% of all projects are finished late, so it’s a big problem for the construction industry not following their time-schedule. Most commonly the projects are delayed by a few weeks or months. Some examples of reasons why delay may occur: Over-optimistic programming, contractual disputes or unusual procurements methods. Delay

Extensions of time for specific events beyond the contractor’s control Procedures for the contractor to follow when making an application for an extension of time Procedures for the contract administrator to follow when giving consideration to the contractor’s application “Delay and disruption is a phrase which is commonly used in construction just like loss and expense or health and safety” Delays are dealt with in standard construction contracts through specific clauses dealing with:

ICE and JCT contracts have different clauses who provide reasons why extension of time will be granted. The architect or contract administrator decides that a “relevant event” has occurred which will delay the completion date. Example: JCT 05 Standard building contract (JCT= The joint contract tribunal) Exceptionally adverse weather conditions Compliance with architect’s instructions Omission or default of the architect (which could be implied to mean failure to comply with an information release schedule) Deferment of the possession date by the employer

The questions are simple. “What was the cause of the delay and who bears the time and money risk”? Each of the parties will want the best settlement and will of course argue. For analysis there is various of methods: Theoretical methods -A model of what was planned is produced ignoring how the project was actually constructed and actual events are imposed on the model to see how they may have influenced the end date -The “but-for” methods - Create models of either planned intentions or the as-built project and seek to address causation on the basis of assumption Update methodologies - Which relive the project in incremental stages, consider events at the time they arose and offer the most extensive analysis Delay analysis

What can you as manager do to minimize your risks of delay? Meetings Avoid meetings where each person in the room gives a status update. Use the time of the meetings to find risks and issues, which the team easy can discuss and find a solution for. As we done on our projects, use an Agenda that you stick to. To-do list fixation is a modern-day problem that can distract you from doing the tasks you need or plan to. Create a daily to-do list who will keep you focused on achieving your objectives. Don’t do the Work Many project managers make the mistake of getting involved in doing the work. Avoid this at all costs. Managing projects is a full-time job and taking your eye off the ball can lead to problems.