CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.

Slides:



Advertisements
Similar presentations
AMSAT-NA FOX Satellite Program Review, Status, and Future JERRY BUXTON, NØJY AMSAT VP-ENGINEERING.
Advertisements

LightSail.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) GSE Timothy Quinn.
STEREO IMPACT Preliminary Design Review 2001-September 11,12 David Curtis1 IMPACT Project Overview.
Yongho Kim Aug 2, : My Job TLM_ReceiverRS decoderGSEOS Nothing.. Interface - Serial line - TCP/IP connection with MPS Functions - CCSDS frame,
TRIO-CINEMA 1 UCB, 2/08/2010 MAGIC Patrick Brown Imperial College London.
Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
Telecom 1 9/17/2012 SPP/FIELDS Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
Continuing Embry- Riddle’s CubeSat Satellite Development Program Presented by Clayton G. Jacobs Embry-Riddle Aeronautical University, Prescott EagleSat.
08/09/2015PSC 2009 Christmas Reception1 AMSAT-UK’s first satellite.
TRIO-CINEMA 1 UCB, 2/08/2010 STEIN Intro Davin Larson Space Sciences Laboratory University of California, Berkeley.
IMPRS June Space Research, in praxis, illustrated by a ground-based example The „Ozonometer“ as a student project.
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
CINEMA Mission Readiness Review
August 11, 2009 Small Satellites Conference A New Particle Detection Instrument for Space Weather Research with CubeSats David Glaser Space Physics.
DINO PDR 23 October 2015 DINO Systems Team Jeff Parker Anthony Lowrey.
TRIO-CINEMA 1 UCB, 2/08/2010 Instrument Interface Board Dorothy Gordon CINEMA - EE Team Space Sciences Laboratory University of California, Berkeley.
CINEMA (CubeSat for Ions, Neutrals, Electrons & MAgnetic fields) Jerry Kim * David Glaser † Thomas Immel ‡ * Systems Engineer, †
Solar Probe Plus FIELDS Team Meeting Management Items 08/05/2014.
TRIO-CINEMA Meeting at KHU 1 October 19-23, 2009 CINEMA Operations Manfred Bester.
2 nd Design Update Presentation March 17, Overview Ground Segment Space Segment OBCTNCTransceiverAntenna PCTNCTransceiverAntenna Rx Tx Rx Tx Rx.
Taeyeon Kim. Page  2 1.Vibration test plan for KHU 2.Harnessing 3.STEIN Housing 4.Future work.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
TRIO-CINEMA 1 KHU, 08/10/2010 TRIO-CINEMA Activity in Korea Jongho Seon 10 Aug 2010.
NASA Operational Simulator for Small Satellites (NOS 3 ) NASA IV&V Independent Test Capability (ITC) Team Mr. Scott Zemerick
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
LiteBIRD US Team Meeting 10/13/2015 Team Meeting at UCB SSL1 Intro to SSL.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL System Engineer David Curtis, SSL STEIN.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL System Engineer David Curtis, SSL STEIN.
TRIO-CINEMA 1 UCB, 8/10/2010 CINEMA Project Update Thomas Immel UCB/SSL Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA 1 UCB, 2/08/2010 CINEMA Mechanical Systems David Glaser Mechanical Engineering Space Sciences Laboratory University of California, Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
TRIO-CINEMA FSW- 1 SSL, 8/10/2010 Flight Software Seyoung Yoon and Sameet Ramakrishnan Space Sciences Laboratory Kyung Hee University University of California,
Introduction: The on-board measurements available for control are a dual-slit sensor to find the elevation of the sun and a magnetometer to measure the.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
TRIO-CINEMA 1 KHU, 10/08/2010 Ground Support Software Yong-ho Kim 22 Feb 2011 School of Space Research Kyung Hee University.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Chris Pasma, SSL Mechanical.
TRIO-CINEMA 1 UCB, 2/08/2010 Integration and Test Program Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA 1 UCB, 10/8/2010 Chassis & Avionics Stack Design Jerry Kim Mechanical Engineering Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA 1 UCB, 2/08/2010 Mission Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
THEMIS CDR 1 UCB, June 16, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 20, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
TRIO-CINEMA C&DH- 1 KHU, 10/19/2009 Command & Data Handling System (C&DH) Peter Harvey David Curtis David McGrogan Space Sciences Laboratory University.
TRIO-CINEMA 1 UCB, 2/08/2010 ACS Dave Auslander, Dave Pankow, Han Chen, Yao-Ting Mao, UC Berkeley Space Sciences Laboratory University of California, Berkeley.
CFS Use at Goddard The Johns Hopkins University Applied Physics Laboratory core Flight Software System Workshop October 26, 2015 Alan Cudmore – NASA Goddard.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 647 Ground Support Equipment Will Rachelson University of.
TRIO-CINEMA 1 UCB, 2/08/2010 System Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA 1 UCB, 2/08/2010 FSW & Operations Winter Summary Seyoung Yoon KHU EE Team.
USNA Standard CubeSat Bus USNA-P1 CubeSat (USNA-14)
GLAST Large Area Telescope:
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
Command & Data Handling
Seyoung Yoon and Sameet Ramakrishnan
CINEMA System Engineering
Solar Probe Plus FIELDS V5 Mechanical Pre-Ship Review April 10, 2017
THEMIS INSTRUMENT SUITE
Command & Data Handling
Instrument Interface FPGA
ACS UC Berkeley Space Sciences Laboratory
University of Colorado at Boulder January 21, 2004 Boulder, Colorado
On-Board Computer Subsystem David Stockhouse
HA1L High Altitude 1U Laboratory
Mark Suder
CONTOUR NGIMS Electronics Test History
Presentation transcript:

CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical Engineer David Glaser, SSL STEIN Scientist John Sample, UCB MAGIC Scientist Tim Horbury, ICL Imperial College London CINEMA French Alternative Energies and Atomic Energy Commission Lawrence Berkeley National Laboratory

September 15, 2011 CINEMA Status

GENERAL NOTES 6 UCB students, 4 recent UCB grads currently on CINEMA team, 1 Engineer from IAUPR, Collaborating Institutions Imperial College London (ICL) Kyung Hee University, South Korea (KHU) Interamerican University of Puerto Rico (IAUPR) Puerto Rico Space Grant Consortium Lawrence Berkeley National Laboratory CEA Saclay (France) CINEMA manifested on ELaNa 6 (OUTSat/L36) Spacecraft Integration Sept 2011 Environmental Testing Oct 2011 Payload Readiness Review late Dec 2011 S/C Delivery Jan Atlas 5 Launch at Vandenberg June 2012

STATUS Preparing flight unit minus STEIN instrument for ACS test next week. ACS test is wireless, using Helium 100 radio for CINEMA RX, X-Bee for serial CINEMA TX. ICL/UCB currently building identical ETU stations, UCB/KHU interface board successfully reading Imperial magnetometer. !!! Flight Sensor and board to be shipped from Imperial before end Sept. Weekly assembly practice now with FLIGHT: chassis, torque coils, sun sensors, solar panels, dsPIC board, EPS, UHF radio, ETU: Battery, harnesses, IIB, MAGIC and STEIN parts. Flight spares of all major vendor parts ordered or RFQ out. UHF ground station waiting TACO antenna, all other parts here. Next Steps Scheduling vibe and TV bakeout to ELaNa 6 specs Cubesat Acceptance Checklist with Cal Poly early October – receive P-POD for vibe. STEIN instrument detector testing with radioactive sources October, ion sources in vacuum November. Replacing sun sensor glass with radiation tolerant glass. ACS test to become day-in-the-life test, fully testing deployables and radios, autonomous behavior driven by FSW.

STEIN (SupraThermal Electrons, Ions and Neutrals) Particle Detector Progress Flight Mechanical Parts ~80% Complete All boards have arrived and are being tested Collaboration with LBL on FPGA, ASIC & detectors ongoing ICD spec has been completed and up-to-date FPGA coding & communication in progress STEIN FSW module completed STEIN module on IIB has started & being tested with FSW I2C communication between FSW & STEIN module on IIB works Issues ASIC trigger issue needs to be sorted Need to test SPI and CDI interface on STEIN Housing for STEIN needs to be redesigned Next Steps Test STEIN FSW module Test GSE  FSW  IIB  STEIN chain down and back Flight Mechanical Assembly Test the detectors

ISSUES Harnessing Immediate need to procure or build connector savers TX header on He-100 Radio may need to be removed Determine how to captivate harnesses C & DH Flight Software Tasks expected to grow with first commanding/ACS tests. Very harsh environment test for ELaNa 6 Vibe: 32 Grms Qual !!! CINEMA design to NASA GEVS proto levels invalid. Heritage instrument experience indicates STEIN instrument unlikely to pass vibe.

C & DH Progress FSW can sample the magnetometer fast enough for ACS MAG data can be downlinked and parsed at GSE ACS integrated into FSW Foreground structure defined (different states and modes) Issues Telemetry not going through the IIB Do not know the sampling times for different modes regarding MAG Need to determine how to upload large chunks of data to CINEMA SPI interface on FSW isn’t generating a clock Need to test SPI interface on IIF Next Steps Finalize CTM AX25 and CDI parser for commands Upload ephemeris and STEIN data Error handling Memory load and memory dump Define 50 byte overflow command Test telemetry module