Campus Kiosk Project Spring, 2006 University Technology Fee Advisory Board & College IT Administrators.

Slides:



Advertisements
Similar presentations
Cloud PIV Authentication and Authorization Demo PIV Card User Workstation Central Security Server In order to use Cloud Authentication and Authorization.
Advertisements

Re-engineering your approach to the beginning college experience should include an acknowledgement of what is working well and only needs to be maintained,
RESEARCH IT Presentation for the Faculty Senate February 2013 Loretta Early, CIO.
Windows DX 66 megahertz (MHz) or faster processor (Pentium central processing unit recommended). 16 megabytes (MB) of memory (24 MB recommended).
Capstone Project Spring 2008
Proposed Athletic Facility Renovations to East Hartford High School Albert Costa-Director/Facilities 1 Expectations Matter Effort Matters Competence Matters.
Novell Server Linux vs. windows server 2008 By: Gabe Miller.
Communications Infrastructure Committee Update for LAN Managers Friday, May 27, 2011.
The Impact of Physical Security on Network Security
Financial Website By: Graham Wright, Cole Clements, Kevin Smith, and Lane Olson.
CIC/VOIP/Construction Update to the IAC 9/7/12 …on behalf of the NOC
Component 4: Introduction to Information and Computer Science Unit 1: Basic Computing Concepts, Including History 1 Health IT Workforce Curriculum Version.
1 “WinSun”: Deploying the Windows Desktop on a Sun Ray Anita Schwartz Carol Jarom.
Stewart Churchill, “Dancin” Dale Hartery, Amy Russell, and Paul Warren.
C O L L E G E O F E N G I N E E R I N G Thin Clients: The Key to Our Success SIGUCCS 2006 Thin Clients: The Key to Our Success Mark R. Ritschard Director,
C O L L E G E O F E N G I N E E R I N G CSU PDI 2010 Thin Clients as Desktop Computers Mark R. Ritschard Director, Engineering Network Services College.
Windows XP Why Implement? Presented By: Amanda Fletcher Phoebe Porter.
Wireless LAN Expansion Proposal Presentation to the UTFAB Monday, March 5, 2007 Scott Baily, Associate Director for Networking,
An Intern’s Guide to basic WMS 2011 setup in just 8 easy steps © 2011 Microsoft Corporation By: Livi Erickson.
Introduction to Information and Computer Science Basic Computing Concepts Including History Lecture c This material (Comp4_Unit1c) was developed by Oregon.
CLASSROOM REVIEW BOARD Proposal Presentation to the UTFAB Tuesday, March 1, 2005, 5 PM, Library Tom Maher, Dir. of OIS,
MOBILITY BILL DEFRAYMENT
Component 4: Introduction to Information and Computer Science Unit 1: Basic Computing Concepts, Including History Lecture 3 This material was developed.
PCaPAC Rome, October 14 th 2002 Paolo Sestini System Engineer Controlling large systems apparatus in an effective manner using the.
Wright Technology Corp. Minh Duong Tina Mendoza Tina Mendoza Mark Rivera.
University Technology Fee Presentation to: Student Fee Review Board November 26, 2007 by Pat Burns.
EGEE is a project funded by the European Union under contract IST HellasGrid Hardware Tender Christos Aposkitis GRNET EGEE 3 rd parties Advanced.
Terminal Servers in Schools A second life for your older computers.
Physical I&IT Infrastructure Proposal Presentation to the UTFAB Monday, February 16, 2003, 4-5 PM, 202 Weber Pat Burns, IAVPIIT,
Classroom Instructional Technology Enhancements Proposal to UTFAB James Lyall Assistant to the Dean – Information and Instructional Technology College.
Cloud Computing is a Nebulous Subject Or how I learned to love VDF on Amazon.
Amagees Tech Corp value added services Data Management and Infrastructure.
SEMDirector Network Proposal Phyllis West Date 07/20/06.
Wireless LAN Expansion Update Presentation to the UTFAB Monday, October 16, 2006 Scott Baily, Associate Director for Networking,
A.O.F. Internal Confidential Communication Project REVIEW PROTOCOL for SMART-HEALTH-COMPUTER STATIONS For Churches.
Board of Trustees Meeting February 25, Strategic Plan Alignment Strategic Priorities from the Strategic Plan 
PRESENTATION TO THE UTFAB PRESENTATION TO THE UTFAB TUESDAY, OCTOBER 11, 2011 TUESDAY, OCTOBER 11, 2011 BY – DOUGLAS SATTERFIELD BY – DOUGLAS SATTERFIELD.
Presentation to the UTFAB Presentation to the UTFAB Monday March, 9 th, 2015 Monday March, 9 th, 2015 By – Douglas Satterfield By – Douglas Satterfield.
Presentation to the UTFAB Presentation to the UTFAB Monday, April 21, 2014 Monday, April 21, 2014 By – Douglas Satterfield By – Douglas Satterfield Classroom.
Thin Client Pilot Project UTFAB : ACNS / LTS Prepared by Jason Huitt February 2, 2010.
Presentation to the UTFAB Presentation to the UTFAB Tuesday, October 23, 2012 Tuesday, October 23, 2012 By – Douglas Satterfield By – Douglas Satterfield.
University Technology Fee Spring Presentation to the SFRB Patrick J. Burns Jason Huitt Pete Winterscheidt Garrett Pichler - Vice President for IT - ACNS.
Lecture Capture Update Rusty Scott, Exec. Associate Director, ACNS March 23, 2015.
Wireless Expansion Update Greg Redder Academic Computing & Networking Services 3/24/14.
Presentation to the UTFAB Presentation to the UTFAB Monday, April 1, 2013 Monday, April 1, 2013 By – Douglas Satterfield By – Douglas Satterfield Classroom.
Presentation to the UTFAB Presentation to the UTFAB December, 1 st, 2014 December, 1 st, 2014 By – Douglas Satterfield By – Douglas Satterfield Classroom.
University Technology Fee Spring Presentation to the SFRB Patrick J. Burns Jason Huitt Pete Winterscheidt Jon Sorkin Tamla Blunt - Vice President for IT.
Campus Kiosk Project Fall, 2009 University Technology Fee Advisory Board & College IT Administrators.
Replacement Proposal Jason Huitt, ACNS November 15, 2011.
Wireless Expansion Update Greg Redder Academic Computing & Networking Services 2/17/09.
Presentation to the UTFAB Presentation to the UTFAB Monday, December 2, 2013 Monday, December 2, 2013 By – Douglas Satterfield By – Douglas Satterfield.
Wireless Expansion Update and Three Year Plan Considerations
Classroom Support FY 2018 UTFAB Proposal
Cornwall Central School District
Classroom Technology Proposal 2009/2010
Classroom Technology Update Nov – FY16 Presentation to UTFAB
Wireless Expansion Update and Three Year Plan Considerations
Wireless Expansion Update and 3 year plan considerations
Wireless Expansion Update
University Technology Fee Fall Presentation to the SFRB
UT Wireless Project Update
Classroom support 2019 Report & request
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
UTFAB Wireless Briefing Spring 2018
UTFAB Funding Proposal RamCard Upgrade for Continuing Students
Classroom Upgrade Update
Lecture Capture Update
Lecture Capture Update & Funding Options
Lecture Capture – Revised FY2018 Request
FY17 Student Fee Review Board Presentation
Presentation transcript:

Campus Kiosk Project Spring, 2006 University Technology Fee Advisory Board & College IT Administrators

Sun Ray System Thin Client 50 Sun Ray 170

Sun Ray System Dual Redundant Servers Dual processor 8GB RAM 150GB disk Gb Ethernet

Kiosk Counters per CSU Facilities

Kiosk Security Barrel & cable with padlock Security plate on back of display

Kiosk Locations

Kiosk Installation Priority (Based purely on traffic & location) Lory Student Center Clark A Wing Engineering (main auditorium foyer) Clark C Wing Engineering (Physics Entrance)* Yates Wagar* Weber Chemistry Natural Resources Education Physiology* Gifford Sheperdson* Natural & Environmental Sciences (NESB)* Visual Arts* * exact location not finalized

Project Timeline

Partnership with Sun Microsystems List Price of Kiosk System: $72,620 Grant from Sun: $47,620 UTFAB cost of Kiosk System: $25,000

Budget Proposed Given Current Locations Sunray 170 (includes monitor)1,049 Keyboard & Mouse3945 Back-End Servers & Licensing Kiosk Networking & Power Security507 2,5482,340 Number of Kiosks50 Total Project127,400117,015 Sun Grant70,30047,620 Proposed to UTFAB57,100 Approved by UTFAB60,000 69,395

Next Steps Resolve Budget Overage Locations in Question Finalize Building Priorities Identifying kiosks as an UTFAB project Kiosk System Policies

Next Steps Resolve Budget Overage Reduce Scope of Project –Eliminate some buildings & re-prioritize –Eliminate some kiosks & re-priorit-ze Increase Budget Allocation –by $10K to cover current costs –by $15K to accommodate potential location changes

Next Steps Locations in Question –Physiology replacing Pathology –Change of location in Wagar –Change of location in Engr (Physics) Have not heard about –NESB –Shepardson –Visual Arts Potential for –change in telecomm & counter costs –delay in installation Decision –bring all changes back to UTFAB –allow the location crew to make final choice (Jason Huitt, Mark Ritschard, Scott Baily, Jim White)

Next Steps Finalize Building Priorities Lory Student Center Clark A Wing Engineering (main auditorium foyer) Clark C Wing Engineering (Physics Entrance)* Wagar* Weber Chemistry Natural Resources Education Physiology* Yates Gifford Sheperdson* Natural & Environmental Sciences (NESB)* Visual Arts*

Next Steps Identifying kiosks as an UTFAB project and a grant from Sun –Banner above the kiosks? –Leetle stickers on ‘em? –Desktop credits?

Next Steps Kiosk System Policies –No authentication (log on) –Home Page (currently CSU) –no USB support (because of no auth) –Kiosk management & LSC –Users agreeing to be nice? (aka agree-to-this-stuff-before-you-get-to-use-this-thing)

Future Possibilities Authentication –Using eID –Local user space (activates USB) –Smart cards useful for all