ILC CFS / CLIC CES Studies for the Interaction Region : - An action was given at the Geneva Linear Collider Meeting for CFS to develop a more in-depth.

Slides:



Advertisements
Similar presentations
Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
Advertisements

CFS challenges for a linear collider J.Osborne CERN ILC-GDE Dubna - 4 June 2008 OUTLINE : Introduction Civil Engineering -Geology (water, stability issues.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Ian Bird WLCG Management Board CERN, 17 th February 2015.
Construction and Installation of the CLIC Experimental Area
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Geotechnical & Civil Engineering Studies Future Circular Colliders (FCC)
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
ARUP Studies Update ILC Interaction Region Design Requirements John Osborne CERN, Yung Loo & Matt Sykes (ARUP) CFS-ADI Joint Meeting - University of Tokyo.
1. Civil Engineering works for Linear Colliders* : -Brief introduction on the overall machine layout (just for CLIC at this stage) -Experimental Area.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Interaction Region Studies for a Linear Collider at CERN - Detector ‘push-pull’ slab design - Cavern assessment Matt Sykes.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
The ILC IR John Amann ILC Mechanical Engineering 09/12/06.
1 J.Osborne (CERN)
CLIC Experimental Area Layout Design Considerations & ARUP Study A. Gaddi, H. Gerwig, M. Herdzina, H. Hervé, N. Siegrist, F. D. Ramos.
FALC Was “Funding agencies for linear collider” Now “funding agencies for large colliders” WHY ??
A. Hervé - 17 Oct CLIC-Workshop CLIC Workshop: 17 Oct. 07 Interaction Region Engineering at ILC Push-Pull Option A. Hervé/CERN.
Global Design Effort - CFS 1 DRAFT CFS Global Meeting 29 July 2009 CONVENTIONAL FACILITIES AND SITING GROUP : Safety documents Safety documents 3d modeling.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Introdcution to Workpackage/Activity Reflection D. Schulte.
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
Conventional Facilities and Siting Global Group Global Design Effort CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, CFS EDR FNAL Kick-Off Planning.
ILC J.Osborne / A.Kosmicki / B.List – March 22 th 2012 CFS update for Europe.
1 The next steps – focusing points Define the scope, strategy and cost of the project implementation. Main input: The evolution of the physics findings.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
CES Studies at CERN for the Interaction Region : -Summary of Linear Collider IR meeting at CERN held on 16 February Design Brief for external design.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
Signalling Programme External Stakeholder Meeting on September 17, 2009.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Task 9.4 Beam Delivery System CERN, 27-Mar /3/2009
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Marco Oriunno (SLAC), March 12, 2014 MDI WG
FCC Civil Engineering John Osborne & Jo Stanyard (SMB - Site Engineering - FAS Section) FCC week outline 10th May 2017.
CLIC / ILC Collaboration for CFS works
Interaction Region Alternative Layouts
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
CLIC Civil Engineering Update
Tom Lackowski Revised 10/12/2011
Copyright © Simon Wallace
RDR Baseline Layouts for Interaction Region
Presentation transcript:

ILC CFS / CLIC CES Studies for the Interaction Region : - An action was given at the Geneva Linear Collider Meeting for CFS to develop a more in-depth civil engineering study of the IR - Linear Collider IR meeting at CERN held on 16 February Design Brief for external design specialists -Kick-off meeting with ARUP is today -Next steps J.Osborne (CERN) for ILC CFS/ CLIC CES 1

2

3 CLIC CDR Baseline Layouts for Interaction Region

ILC RDR Baseline Layouts for Interaction Region Several ‘concerns’ have been raised with the ILC RDR layout New ILC baseline needs to be agreed

5 ARUP’s matrix analysis strategy

6 ARUP’s were asked to tender for 4 distinct tasks

7 Air pads v Rollers for concrete platform movement will be further analysed

8

9 2d and 3d models will be developed for CLIC to do a “Time-dependant” state analysis. Possible 2 nd phase use of these models for ILC layouts/geology.

10 Removed form ARUP scope

11 To get this study going, ARUP have prepared a list of questions including a ‘brainstorming’ proposal for the IR layout. To be discussed this afternoon For example, ARUP have made a ‘brainstorming’ proposal for the IR layout : To be discussed this afternoon......

Budget for this Linear Collider IR study : FNAL (Task 1) CERN (Task 2) Some key decisions for ILC were resolved at Eugene meeting : Are both detectors using the “concrete” platform strategy : Yes Are the level of the platforms the same ? For the overall layout : – Gantry crane capacity in the experimental hall ? – Should shafts be directly over the cavern or offset ? – Self shielding detectors : Yes for ILC 12

Next Steps ARUP’s now ready to proceed with : – Task 1 - funded by FNAL – Task 2 - funded by CERN This study will be of benefit to both ILC and CLIC projects Design Criteria to be established at this meeting 13 J.Osborne (CERN) for CES

14 Today’s agenda