Module Review 1 & 2. According to the CWA, by what year where all pollutant discharges to navigable waters to cease? Module 1 Review 2.

Slides:



Advertisements
Similar presentations
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Advertisements

Alaska Association of Harbormasters and Port Administrators Wrangell, Alaska October 26, 2010 Shane Serrano ADEC.
SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.
Informational Meeting for the Proposed Final Permit May 10, 2011.
Storm Water Permit Compliance Susan Murphy. Storm Water: To See or Not To See… We submit a Notice of Intent for Coverage (NOI) Prepare and Implement a.
Module 6 Effluent Monitoring and Receiving Water Monitoring.
Collecting a Stormwater Sample Annual CMTA Marine Trades Exposition October 5, 2010.
U.S. Pretrial Services and Probation Office Northern District of Ohio.
Module 4B Grinder & Waste Conveyance Inspections/Sampling.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Waste Ban Compliance Training Program Administrative Compliance Requirements April and May 2006 Administrative Compliance Requirements April and May 2006.
25th Annual U.S. EPA Region VI Pretreatment Association Workshop Liquid Waste Transporter Enforcement Stories August 5, 2009 Ms. Erin La Rue Pretreatment.
Module 6A QAPP for In House and Offsite Testing. Chris Foley Compliance Program Manager Module 6A – QAPP for In House and Offsite Testing 2.
GEORGIA ENVIRONMENTAL PROTECTION DIVISION SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM.
Module 4A Permitting Requirement for GP Post Authorization or IP Issuance.
Module 2 History of the Seafood Processing Waste Permitting Program.
1 MASSACHUSETTS UNDERGROUND STORAGE TANK (UST) PROGRAM Baseline Compliance Assessment 1 MassDEP 8/2/2011.
1 Module 1 Overview of the APDES Permitting Program Seattle, Washington April 24-25, 2012.
Coping with Electronic Records Setting Standards for Private Sector E-records Retention.
NPDES Primer for Executive Officers of Wastewater Facilities Indiana Department of Environmental Management Office of Water Quality Compliance Branch.
Module 7 Compliance Inspections and Other Issues.
Module 3A Permitting the APDES Seafood Processing Sector.
Sustained Compliance Workshop - Anchorage, AK September 23-24, 2010 Eric Burg Kenai Peninsula & Southeast Alaska – Compliance & Monitoring Section DEC.
May 14th, New Permit Tasks SMARTS LRP Recertification Visual observations Monthly And when sampling Sampling Events.
Quality Assurance/Quality Control Policy
Inspection Records and Reports NC DWR, Raleigh Regional Office 3800 Barrett Drive Raleigh NC (919)
1 Module 6 Effluent Monitoring and Receiving Water Monitoring Seattle, Washington April 24-25, 2012.
CENTRALIZED WASTE TREATMENT 40 CFR 437 Lessons Learned.
North American Emission Control Area
NPDES Electronic Reporting: Notices of Intent and Discharge Monitoring Reports Moderator: Andy Battin, U.S. EPA Presented by: John Dombrowski, U.S. EPA.
WWLC Standard Operating Procedures Presented by Frank Hall, Laboratory Certification Coordinator.
Module 3C How to Apply for Coverage Under an APDES General Permit.
Clean Water Act (CWA) (1977, 1981, 1987). Description and Affects This Act was put into place in order to regulate the amount of pollutants that were.
EDMR Electronic data submittal system Jeffrey A. Ewick, Section Chief Data and Information Services Section Electronic Discharge Monitoring Report.
Mississippi State Department of Health
February 2007 Commercial Vehicle Drivers Hours of Service Module 24: Daily Log Audits.
Where to find Information About Facilities. Overview of Title V Permits.
Module 3B How to Apply for an Individual APDES Permit.
Overview of the Final EPA Concentrated Animal Feeding Operations (CAFO) Regulations April 1, 2003.
REGULATORY REQUIREMENTS FOR STORMWATER MANAGEMENT Coastal Stormwater Supplement Training.
Module 4C Sea Surface and Shoreline Monitoring. Module 4C – Sea Surface & Shoreline Monitoring Stephanie Mann Environmental Program Specialist III 2.
State Water Resources Control Board Division of Water Quality Industrial/Construction Storm Water Unit.
Title V Operating Permit Program 1 Section 1: Intro to Title V Laura McKelvey U.S. EPA.
MRWS GROUND WATER RULE (GWR) PREPARED BY JOHN CAMDEN MRWS GROUND WATER TECH
© 2013 The McGraw-Hill Companies, Inc. All rights reserved. Ch 8 Privacy Law and HIPAA.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
What Documentation Needs to be Submitted With an Approval Application?
Phase II National Storm Water Regulations What’s in it for you?
National Pollutant Discharge Elimination System (NPDES) Permitting and Pesticides Jeff Fischer Permits Section Water Resources Division
Test Your Storm Water Knowledge!
ISAT 422: Environmental Management Water Regulations n "Clean Water Act (CWA)" = Water Pollution Control Act of 1972 n Amended by Clean Water Act of 1977.
February 11, 2011 Industrial Stormwater Permit and Annual Report Preparation Instructor: George Caamano.
EPA Groundwater Rule 40 CFR Parts and 142. Reasons for the Groundwater Rule  To protect public health due to viruses and other bacterial exposure.
1 Industrial Waste Data Tracking: Surveys & Other Information Collection Presented by: Melissa Reboul LDEQ Pretreatment MODULE 3.
August 1 st Draft of Offshore Aquaculture Amendment Gulf Council Meeting August 11-15, 2008 Key Largo, FL Tab J, No. 6.
Legislative Overview  This quick module outlines in more detail the background of the legal requirements.
Anticipated Changes to Oklahoma’s Multi-Sector Industrial Permit for Stormwater Discharges (OKR05)
Advanced Environmental Management (AEM) Training Phase I
Sample Siting Plans under the Revised Total Coliform Rule
Residential Placement Application 2011
Single Event Violations
Permitting Requirements for Lagoons
John Tinger U.S. EPA Region IX
“How To Ace an Inspection” Russell McLaren – Entergy ARES Water Lead
MS4 OVERVIEW 2015.
North American Emission Control Area
Multi-Sector General Permit: MSGP
OSU Controlled Substances Training Module for Researchers
Presentation transcript:

Module Review 1 & 2

According to the CWA, by what year where all pollutant discharges to navigable waters to cease? Module 1 Review 2

1985 As part of the CWA national goals and policies the EPA aimed to eliminate the discharge of pollutants to navigable waters by Module 1 Review

Alaska became the ## state to receive authority to administer the NPDES program? 4 Module 1 Review

Alaska became the 46th state to receive authority to administer the NPDES program? 5 Module 1 Review

What is EPA’s role after authority for a sector has been transferred to Alaska? 6 Module 1 Review

What is EPA’s role after authority for a sector has been transferred to Alaska? Inspect facilities Object to permits that don’t meet CWA requirements Enforce APDES permits Bonus Answer-Audit the APDES program 7 Module 1 Review

Name the 5 conventional pollutants: 8 Module 2 Review

Name the 5 conventional pollutants: 9 Module 2 Review pH BOD TSS Oil and Grease Fecal Coliform

What does the acronym BPT mean? 10 Module 2 Review

What does the acronym BPT mean? 11 Module 2 Review Best Practicable Control Technology Currently Available

What part of the Code of Federal Regulations is the ELG for the Seafood Processing Point Category? 12 Module 2 Review

What part of the Code of Federal Regulations is the ELG for the Seafood Processing Point Category? 13 Module 2 Review 40 CFR Part 408

What will happen next regarding the 2 Petitions from 1980? 14 Module 2 Review

What will happen next regarding the 2 Petitions from 1980? 15 Module 2 Review EPA HQ will post a Notice of Data Availability (NODA) in the Federal Register.

Module Review 3A & 3B

Name the 4 categories of facilities covered by the AKG52000 permit: Module 3A Review

Name the 4 categories of facilities covered by the AKG52000 permit: Module 3A Review Offshore Nearshore Shorebased At-Sea

What is a baseline?

Module 3A Review What is a baseline? Generally, the baseline consists of the mainland low-water line and any offshore islands and additional features that are applicable to the U.S. coast, such as river mouths, bays, and enclosed harbors from which the breadth of the territorial sea is measured.

Module 3A Review What Act regulates the dumping of material into the ocean?

Module 3A Review What Act regulates the dumping of material into the ocean? The Marine Protection, Research, and Sanctuaries Act (MPRSA) or the Ocean Dumping Act.

Module 3A Review How many criteria must be satisfied in order to degrade existing water quality?

Module 3A Review 5 1.Necessary to accommodate important economic or social development in the area 2.Reducing water quality will not violate water quality criteria 3.Water quality will be adequate to protect existing uses 4.The methods of pollution prevention, control and treatment be the most effective and reasonable and will be applied to all wastes and substances discharged 5.All wastes will be treated and controlled to the highest statutory and regulatory requirements

Module 3A Review Who is eligible for an IP?

Module 3A Review Who is eligible for an IP? Those that cannot be covered by a General Permit.

Module 3A Review Who has a duty to apply for an IP?

Module 3A Review Who has a duty to apply for an IP? The facility operator.

Module 3A Review What is the form associated with a mixing zone application?

Module 3A Review What is the form associated with a mixing zone application? Form 2M

Module 3A Review Which Tables in Form 2C must be completed separately for each outfall?

Module 3A Review Which Tables in Form 2C must be completed separately for each outfall? Table 6A, 6B and 6C

Module 3A Review True or False, Form 2C has a separate signature and certification that must be signed by the responsible party.

Module 3A Review True or False, Form 2C has a separate signature and certification that must be signed by the responsible party.

Module Review 3C & 4A

What is myAlaska? 36 Module 3C Review

What is myAlaska? 37 Module 3C Review myAlaska is an authentication and electronic signature system allowing citizens to interact with multiple State of Alaska services through a single username and password.

How may attachments can be uploaded to an eNOI? 38 Module 3C Review

How may attachments can be uploaded to an eNOI? 39 Module 3C Review No limit, but each attachment must be smaller than 20 mb

Can you make additional edits to an eNOI after you have clicked the signature options? 40 Module 3C Review

Can you make additional edits to an eNOI after you have clicked the signature options? 41 Module 3C Review No. Once you click Sign this Application Using e-Signature or Print, Sign and Submit a Hard-Copy Signature Page the eNOI is locked.

True or False. The permit expiration date changes when a permit is modified. 42 Module 3C Review

True or False. The permit expiration date changes when a permit is modified. 43 Module 3C Review False. Only the permit part that was proposed to be modified changes. No other parts, including the expiration date, are changed when a permit is modified.

When do complete renewal applications have to be received in order to automatically receive an administrative extension of the permit? 44 Module 4A Review

When do complete renewal applications have to be received in order to automatically receive an administrative extension of the permit? 45 Module 4A Review A complete application has to be received 180 days before expiration of the permit for an automatic extension.

True or False: Some information required to be submitted in an Annual Report can be considered business confidential by stamping business confidential on each page of the Annual Report. 46 Module 4A Review

True or False: Some information required to be submitted in an Annual Report can be considered business confidential by stamping business confidential on each page of the Annual Report. 47 Module 4A Review False. Information required to be submitted in an annual report can’t be considered confidential.

True or False: DEC is required to post all permit authorizations on-line. 48 Module 4A Review

True or False: DEC is required to post all permit authorizations on-line. 49 Module 4A Review True. DEC is required to post all authorizations on-line per statute (d)

What is the purpose of effluent/receiving water monitoring? 50 Module 4A Review

What is the purpose of effluent/receiving water monitoring? 51 Module 4A Review To better understand the characteristics of the wastewater discharge.

Module Review 4B 4C & 5

How often does the waste conveyance system need to be visually inspected? 53 Module 4B Review

How often does the waste conveyance system need to be visually inspected? 54 Module 4B Review

Is a sampling port on the seafood processing waste discharge line required? 55 Module 4B Review

Is a sampling port on the seafood processing waste discharge line required? 56 Module 4B Review Yes

What inspection information must be submitted with the Annual Report? 57 Module 4B Review

What inspection information must be submitted with the Annual Report? 58 Module 4B Review Summary Report Daily Logs of inspections Photographs of inspections (1 per month minimum)

Name three objectives of a Sea Surface Monitoring Program. 59 Module 4C Review

Name three objectives of a Sea Surface Monitoring Program. 60 Module 4C Review Determine compliance with Water Quality Standards Compliance with permit conditions Observations/incidences of threatened/endangered species

What are three minimum photo requirements? 61 Module 4C Review

What are three minimum photo requirements? 62 Module 4C Review Taken at least once per month while processing Sufficient clarity and detail to support the observations on the log form Include a digital date and time stamp

What is the distance from the seafood processing outfall point that foam has to be reduced to a trace? 63 Module 4C Review

What is the distance from the seafood processing outfall point that foam has to be reduced to a trace? 64 Module 4C Review 100 feet

Name three types of survey methods acceptable to DEC: 65 Module 5 Review

Name three types of survey methods acceptable to DEC: 66 Module 5 Review Dive survey methods Video survey methods Grab sampling

Name 4 key survey requirements: 67 Module 5 Review

Name 4 key survey requirements: 68 Module 5 Review Qualified individuals performing the surveys Repeatability of the survey Accuracy of the survey Safety of the individuals performing the survey

Bonus Question: What is the purpose of the Seafloor Monitoring Program? 69 Module 5 Review

Bonus Question: What is the purpose of the Seafloor Monitoring Program? 70 Module 5 Review The purpose of a seafloor survey is to determine compliance with water quality criteria for residues in marine waters and document the boundaries of continuous and discontinuous coverage of seafood processing waste on the bottom (seafloor).

Module Review 6 & 6A

To meet the requirements of the sampling and analysis needed to support an APDES permit, what three activities are required prior to collecting samples? 72 Module 6 Review

To meet the requirements of the sampling and analysis needed to support an APDES permit, what three activities are required prior to collecting samples? 73 Module 6 Review Planning, Training and Standard Operating Procedure Development

After collecting samples and obtaining test results, what is the next critical step in the process? 74 Module 6 Review

After collecting samples and obtaining test results, what is the next critical step in the process? 75 Module 6 Review Data evaluation to ensure quality assurance goals are met.

Some data did not meet the QA requirements. Must this data be reported to DEC? 76 Module 6 Review

Some data did not meet the QA requirements. Must this data be reported to DEC? 77 Module 6 Review Yes. All data collected is reported and flagged if it does not meet the QA goals.

Who’s responsibility is it to report permit violations due to exceedances? 78 Module 6 Review

Who’s responsibility is it to report permit violations due to exceedances? 79 Module 6 Review The Permittee

List 3 elements for a QAPP: 80 Module 6A Review

List 3 elements for a QAPP: 81 Module 6A Review 1.Title and Approval Sheet 2.Table of Contents 3.Distribution List 4.Organization Chart and Responsibilities Narrative 5.Project Objectives and Description 6.Sampling and Analysis Processes 7.Criteria for Measurement Data 8.Training and Certifications 9.Documents and Records

What is a DQO? 82 Module 6A Review

What is a DQO? 83 Module 6A Review Data quality objective

Module Review 6B & 6C

What is special about the Coliform sample bottles? 85 Module 6B Review

What is special about the Coliform sample bottles? 86 Module 6B Review They are sterile.

What preservative is used for Oil and Grease Samples? 87 Module 6B Review

What preservative is used for Oil and Grease Samples? 88 Module 6B Review HCl acid

Are all sample bottles rinsed before filling? 89 Module 6B Review

Are all sample bottles rinsed before filling? 90 Module 6B Review No, some sample bottles contain a preservative.

What is the name of the document used to legally transfer samples to the offsite lab? 91 Module 6B Review

What is the name of the document used to legally transfer samples to the offsite lab? 92 Module 6B Review Chain of Custody

Why is the Chain of Custody placed in a Ziploc bag? 93 Module 6B Review

Why is the Chain of Custody placed in a Ziploc bag? 94 Module 6B Review To keep it dry and protected inside the cooler.

What is the holding time for BOD? 95 Module 6C Review

What is the holding time for BOD? 96 Module 6C Review 48 hours

What is the holding time for Fecal and Enterococci Coliform bacteria? 97 Module 6C Review

What is the holding time for Fecal and Enterococci Coliform bacteria? 98 Module 6C Review 6 hours

What is a common reason a laboratory will reject samples? 99 Module 6C Review

What is a common reason a laboratory will reject samples? 100 Module 6C Review Not properly preserved between not frozen and 6C.

101 Module 6C Review What type of Personal Protective Equipment should be worn to sample?

102 Module 6C Review Protective lenses impervious latex or nitrile gloves

What does the MCL acronym mean? 103 Module 6C Review

What does the MCL acronym mean? 104 Module 6C Review Maximum Contaminant Level

Module Review 7

Is there an approved generic Seafood Processing QAPP at this time? 106 Module 7 Review

Is there an approved generic Seafood Processing QAPP at this time? 107 Module 7 Review No

Where do Standard Operating Procedures fit into pollution prevention? 108 Module 7 Review

Where do Standard Operating Procedures fit into pollution prevention? 109 Module 7 Review Part of the Best Management Practices Plan (BMP)

What do you do if the BMP is not adequate to prevent pollution? 110 Module 7 Review

What do you do if the BMP is not adequate to prevent pollution? 111 Module 7 Review Modify the BMP as needed to address the deficiency.

What records need to be kept at the facility? 112 Module 7 Review

What records need to be kept at the facility? 113 Module 7 Review 1.Copy of Permit 2.ADEC authorization 3.BMP Plan 4.Monitoring Logs 5.Lab QAPP 6.Effluent sample analysis results 7.MSD US Coast Guard certification 8.A copy of the most recent NOI