Robert L. Moultrie Chairman & CEO

Slides:



Advertisements
Similar presentations
CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Advertisements

Construction Engineering 221
1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Benefits of Construction Management
Organization of Primary Entities
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Effectively Structuring and Managing Design- Build Projects Timothy John Murphy and Jason J. Annibale Wednesday November 25, 2009.
Potential Second Access Currently we are working on approval access to 2 nd Avenue under CP tracks as shown in top left photo. Our entrance would be across.
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Lessons Learned: CM at Risk & Design Build
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
The Minimum Price Contract. Purpose of a Minimum Price Contract Minimum price contracts are one of the marketing tools available to producers to help.
LOS ANGELES UNIFIED SCHOOL DISTRICT JOB ORDER CONTRACTING Copyright © 2004 The Gordian Group, Inc. all rights reserved.
Evolution of Parametric Analysis within Rolls-Royce Purchasing
Design-Build: RISKS OR REWARDS for the Consulting Engineer?
Roadmap for Sourcing Decision Review Board (DRB)
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
Introduction to Operations Management
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
A Match made in Heaven? Connecting you with a builder.
Alternative Project Delivery
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
Rethinking Construction Review of traditional construction models and a comparison of product development processes with other industries School of Architecture.
PROCEDURES FOR SELECTING THE CONTRACTOR
Construction What is “construction” defined as or include?  Building?  Altering ?  Repairing?  Demolishing?  Public Improvements?
KFUPM, Department of Construction Engineering and Management Summary of AN IMPLEMENTATION MODEL FOR DESIGN-BUILD (D-B) PROJECT DELIVERY SYSTEM BY : MOHAMMAD.
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
Honoraria for Design Build Projects Methodology Assessment Matrix.
Hospitality Services Group COOPERATIVE PURCHASING SINCE 1989.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
Expense Reduction: the timing has never been better! Lycia Rettig, Director Expense Reduction Analysts
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
More Construction for the Money “Back to the Future” Jim Porter 2004 Recipient Carroll H. Dunn Award of Excellence.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
Army Directorate of Public Works Support Contractor of the Year Building a government contractor for the 21 st century By Carlos Garcia Owner and CEO KIRA.
Construction Management At Risk Process
Leadership for Project and Program Success How professional Construction Management saves time, saves money and delivers quality projects.
CHANGING PROJECT DELIVERY SYSTEMS
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
Contractor Review and Prequalification
Building a government contractor for the 21st century
Building a Government Contractor for the 21st Century
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
PROJECT DELIVERY METHODS
(Additional materials)
CHANGING PROJECT DELIVERY SYSTEMS
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Project Delivery Systems
The Best Decision by Design: Professional Services Selection
Traditional Steps Leading To A Bid Document
Design-Bid-Build (Ch. 149) vs. Construction Manager at Risk (Ch. 149A)
PROJECT DELIVERY METHODS
Add Engineering Value to your Project through BIM Preconstruction Services Preconstruction Services BIM Engineering U.S., L.L.C. – Best Preconstruction.
MULTISPORTS CENTRE PRESENTATION
Design-Build Acquisition and Contract Incentives May 9, 2019
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

Robert L. Moultrie Chairman & CEO What You Need to Know Before Embarking on a New Building Program: What Really Happens on Bid Day? Presented by: Robert L. Moultrie Chairman & CEO

Discussion Points Trends in the Design and Construction Industry Research Findings Evaluation of Alternative Delivery The Evolution of Project Delivery Systems Factors Leading to Alternative Delivery Methods Critical Success Factors

1st Design-Build Project - Macedonia

Design-Build Timeline

Trends in the Design and Construction Industry A growing number of public and private owners faced with large construction projects and tighter schedules are using outside program managers to deliver projects. (ENR Magazine) A greater acceptance of Alternative/Total Responsibility at Risk All states, with the exception of two, allow alternative delivery “Volume of turn-key projects expected to increase from 40% to 60% over the next two years” (Design-Build Magazine)

Research Findings from the Construction Industry Institute Regardless of delivery method, research showed that cost increases by the contractor were due to: Lack of early planning participation by the contractor (constructibility reviews and value engineering suggestions) Lack of previous working relations of the architect/engineer and the contractor Contractor’s recognition of engineering errors during the bidding process, but there was no intercommunication

Factors Leading to Alternative Delivery Methods Changes in Owner staff makeup A focus on the Owner’s “core business” (and it’s usually not building large capital programs) A need to downsize in-house capabilities The business client and Owners have changed

Design-Bid-Build (aka, Traditional Approach) Your Choices Design-Bid-Build (aka, Traditional Approach) Construction Management at-Risk Design-Build The project delivery method defines the relationships, roles, responsibilities, and risks of all parties involved.

Traditional Approach: Design-Bid-Build Architecture / Engineering General Contractor Owner Owner General Contractor BIDS OUT TO HIRES HIRES Architecture / Engineering S

Traditional Approach: Design-Bid-Build Owner holds separate A/E & Construction contracts Potential for adversarial relationships Qualifications are rarely considered in contractor selection on public work projects No assurance that design is within budget No benefit of contractor input during design No ability to accelerate project delivery Owner has no input in subcontractor selection Increased change orders Owner does not share in savings: Contractor awarded Lump Sum Architecture / Engineering General Contractor Owner Key: Contract Responsibility Communication

Bidding Timeline Nothing happening, WHY? 1 Month Before Bid: (In Today’s Market) Nothing happening, WHY? Too busy on other bids Plenty of time Casual sub contact All you are accomplishing is getting on the bid schedule Manufacturers check specs to see if they are protected 2 Weeks Before Bid: Sub contact begins in earnest Good contractors begin quantity survey or take-off Bad contractors rely on subs for this and change order owner if quantities are wrong

Bidding Timeline Week of The Bid Implications? Project execution planning and general conditions formulation Alliances may be formed between subs and GC’s Subs begin to look at the job and decide to bid or pass Final Addenda is issued – subs begin take-off Calls to subs from the GC get frantic Manufacturers begin to look at the job Bid packages are broken down Implications? GC’s & subs are trolling for the right circumstances: Holes in drawings Weak / little competition Good subs interest from their cadre Where are the Owner’s interests in this process?

Bidding Timeline Bid Day – Bid Time is 2:00pm Why? A good contractor will have a “box run” total price Sub budgets + pricing + self-pricing + SWAGS Before computers, this is where the cut & add sheet began General Conditions & fees are set Sub & supplier quotes start to trickle in By lunch, should have a quote for each bid package except for mech. elect. & other specialties Why? Subs “shop” prices

Bidding Timeline 1:30pm – CHAOS! Bid Day 1:30pm – CHAOS! ½ price number is out that contains an alternate material Should we carry it and hope we get it approved? We only have 1 elect & 1 mech number out of 20 subs in each trade Where are the sub quotations? The low mason only has 85% of the block & brick in our take-off -- and he can’t bond the job!

Bidding Timeline 1:45pm – PANDAMONIUM!! Bid Day 1:45pm – PANDAMONIUM!! All the mech and elect numbers have come in – including the 10 you have never heard of You can not carry the low number – you can only shop it to someone you know Do you have enough phone lines and people to get all the numbers? We won’t use him again, unless he’s low!

Bidding Timeline How much do we “discount” the project? Bid Day 1:55pm – DECISION TIME How much do we “discount” the project? Getting all the sub quote numbers & tabulating them Adding up all the numbers and addressing all the alternates and proposal technicalities 1/3 Skill It is difficult to win against “cheaters” / “shoppers” How can we get unspec’d materials approved? How will you buy-out your discount? 1/3 Ethics Did you get most of the right numbers? Did you discount enough? How “hungry” was the competition? 1/3 Luck

What Really Happens on Bid Day? Traditional Approach with GC Bid What the Owner does NOT see. **Indicates lowest bid General Conditions, Site Supervision, Insurance, Fee and Bond costs are in addition to the above bids and included in the overall Lump Sum.

Construction Management At-Risk Owner holds separate A/E and construction contracts Higher degree of teamwork between architect and contractor Qualifications based selection; negotiated fees Pre-construction services during design to verify budget and constructability Project acceleration may be implemented Subcontractors may be competitively bid Open reporting to owner GMP late in design Owner may share in savings Owner Architecture / Engineering Construction Manager S Key: Contract Responsibility Communication

What Really Happens on Bid Day? CM At-Risk Pricing What the Owner Does See

Design-Build: General Contractor Led Team Owner holds single contract for total Design-Build delivery Architect is subcontracted to CM because CM provides the bond Contractor (costs) driven approach Bid or Qualifications based on selection Pre-Construction Services during Design to control budget and constructability Subcontractors may be competitively bid Enables “Fast-track” construction scheduling Well defined program is essential to define scope Owner may participate in savings Owner HIRES Contractor S STAFF or HIRES Architecture Engineering BUILDING PHASE DESIGN PHASE

Design-Build: Integrated Firm Owner holds single contract for Program Management, A/E & Construction Highest Degree of Teamwork Qualifications Based Selection; negotiated fees Integrated design and pre-construction from the start Subcontractors typically are competitively bid Enables fast-track construction GMP early in the design process 100% savings returned to Owner

What Really Happens on Bid Day? Design-Build Approach What the Owner Does See D/B * Value Engineering suggestions can discount bids by 5%

Traditional vs. Alternative Design-Bid-Build Lump sum amount established Planning Architecture / Engineering Bid Construction CM at Risk 80% Complete documents; GMP established Planning Architecture / Engineering Bid individual trade packages Construction 13.3% Faster OneSource Integrated 60% complete documents; GMP established Contractor Led 80% complete documents; GMP established Planning Architecture / Engineering “Faster Fast-Track” Bid individual trade packages Realistic budget or confirmation of cost limitation Construction 33.5% Faster

Delivery Method Matrix Project Delivery Options (with basis for selection) # of CONTRACTS Designer & Contractor (2 separate contracts) Design/Builder (1 combined contract) SELECTION TYPES Competitive Sealed Bid (Low Bid) Total Construction Cost is sole criteria for final selection Design-Bid-Build Design-Build Competitive Sealed Bid Competitive Cost Proposal (Best Value) Total Construction Cost and other criteria are weighted factors in the final selection CM/GC Competitive Cost Proposal Design-Build Competitive Cost Proposal Competitive Qualifications Proposal (Qualifications Based Selection) Total Construction Cost are not a factor in the final selection criteria CM / GC Competitive Qualifications Proposal OneSource Competitive Qualifications Proposal

Delivery Method Comparison Comparisons OneSource vs. Design-Bid-Build CM@Risk vs. Design-Bid-Build OneSource vs. CM@Risk 6.1% lower 1.6% lower 4.5% lower Unit Cost Construction Speed 12% faster 5.8% faster 7% faster Delivery Speed 33.5% faster 13.3% faster 23.5% faster Cost Growth 5.2% less 7.8% more 12.6% less Schedule Growth 11.4% less 9.2% less 2.2% less Table shows average differences between project delivery systems

Making the Right Choice No one method is perfect for every project! Selecting a delivery method depends on factors such as level of quality desired, budget, and schedule Regardless of delivery method there are other tools that can help you meet your quality, cost and schedule goals.

The use of Building Information Modeling (BIM) Industry Tools A well-defined plan The use of Building Information Modeling (BIM) Early Cost, Schedule & Constructability Input

Critical Success Factors Two critical success factors for any project, regardless of delivery method, are: 1. A well thought out, comprehensive facility plan that addresses all of the client’s objectives and all of the necessary requirements of the project, and 2. A competent and skilled manager, knowledgeable in the project’s niche market, to manage the program and implement the plan - from start to finish

Manage Move-In & Commissioning Approach Planning Implementation DECISIONS BOND APPROVAL Ed Specs Guide Specs Manage Architects Master Plan Manage Bid Process Master Schedule Manage Construction Cost Planning Manage Cash Flow PUBLIC Program Manage Information Master Budget Re-Allocate Savings Enrollment Projections Manage Move-In & Commissioning Concept Design COSTS Time

Building Information Modeling PLANNING New approach to building design, construction, and management Virtual three dimensional model that offers continuous and immediate information Parametric building modeling technology Dynamic … uses a relational database together with a behavior model to capture and present building cost and schedule information. CONTINUOUS IMPROVEMENT DESIGN Parametric Change Engine Views Annotations Components IMPLEMENTATION ANALYSIS

South Paulding High School Dallas, GA Part of an overall Program Management At-Risk program, which includes construction of a new 100,000 SF elementary school as well. 240,000 SF, 1,600 students Auxiliary facilities: gymnasium, dining hall, 500-seat auditorium Athletic facilities: 3,000-seat football stadium, practice fields, eight-lane synthetic track, and baseball/softball complex