TRANSMISSION PLANNING IN EUROPE: FROM CURRENT METHODOLOGIES TO A NEW SYSTEMIC APPROACH Angelo L’Abbate, Gianluigi Migliavacca, ERSE (former CESI RICERCA)

Slides:



Advertisements
Similar presentations
Integrated Resource Planning: An overview Mark Howells & Bruno Merven Energy Research Centre Energy Research Centre University of Cape Town.
Advertisements

A Technology Ranking Methodology for the Cost-Benefit Analysis of Transmission Investments in Europe A Technology Ranking Methodology for the Cost-Benefit.
The future Role of VPPs in Europe Pan European Balancing Market: EU-FP7-Project eBadge Workshop on DSM Potentials, Implementations and Experiences 20 th.
New market instruments for RES-E to meet the 20/20/20 targets Sophie Dourlens-Quaranta, Technofi (Market4RES WP4 leader) Market4RES public kick-off Brussels,
Development and Operation of Active Distribution Networks: Results of CIGRE C6.11 Working Group (Paper 0311) Dr Samuel Jupe (Parsons Brinckerhoff) UK Member.
Framework for comparing power system reliability criteria Evelyn Heylen Prof. Geert Deconinck Prof. Dirk Van Hertem Durham Risk and Reliability modelling.
Click to edit title Click to edit sub-title The European Network of Transmission System Operators Stockholm 14th of September 2009 Teun van Biert - Convener.
Planning challenges for RE Deployment North African perspective Addressing Variable Renewables in Long-Term Energy Planning (AVRIL) : 2-3 March 2015 Rim.
EBADGE EU wide inteligent balancing market Peter Nemček.
P.Labra – EWEA March 2012 ENTSO-E’s & TYNDP’s vision on adapting European Transmission Grid to large amounts of wind power.
Frankfurt (Germany), 6-9 June 2011 Coordination between TSOs and DSOs – a necessity for system planning and operation Dr. Ralph Pfeiffer Amprion GmbH 1.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Towards Regional Independent Operators – a main driver for successful market integration.
Evaluating Security of Energy Supply in the EU Nicola Pochettino European Investment Bank European Economic Congress, Financing of investments related.
GreenNet-EU27 Results on WP5: Case studies on RES-E grid integration 1 RES-E Case Study Analyses and Synthesis of Results Dr.-Ing. Derk J. Swider Institute.
1 March 2-3, 2015, Bonn Expert workshop Addressing Variable Renewables In Long‐Term Energy Planning (AVRIL) Renewables Energy Integration In Long‐Term.
Amount and cost of losses June 11 th Florence School of Regulation Jose Luis Mata.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Review of eStorage’s first year results WP3 Benefits of Storage and Regulatory Framework & Market Design 30 October 2013 Wim van der Veen - DNV KEMA.
Update on transit compensation mechanism application in Baltics Arnis Staltmanis Head of International Project Department 16 September 2009, Vilnius.
Valeria Termini Member of the CEER GA FTS-CEER bilateral meeting, Florence 06 th February 2012 Investment planning rules in Europe.
REALISEGRID: a FP7 project for assessing the benefits provided by infrastructure development in a pan-European power system Gianluigi Migliavacca ERSE.
Microgeneration and new end-use technologies in ADDRESS, INCA and SEESGEN-ICT Jussi Ikäheimo (VTT) (& Regine Belhomme, Giovanni Valtorta) IEA DSM 17 workshop.
Andrea Ricci - ISIS Brussels, 12 April 2012 Smart Grids: Overview of the study and main challenges 1.
Smart Grid - Developments and Implementations Prof. Gady Golan – HIT, Israel Dr. Yuval Beck – HIT, Israel , Electricity 2012, Eilat.
© OECD/IEA 2010 Energy Policies of the Czech Republic 2010 In-depth Review Energy Policies of the Czech Republic 2010 In-depth Review Prague, 7 October.
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
Generation and transmission interconnections 4 July, 2013 Virgilijus Poderys CEO of LITGRID AB.
Power System Economics Daniel Kirschen. Money © 2012 D. Kirschen & University of Washington1.
The TIDE impact assessment methodology TIDE Final Conference Barcelona, September 2015 Wuppertal Institute for Climate, Environment and Energy Oliver.
Guidelines of Good Practice on customer cost surveys as an input for infrastructure development and its regulation Riccardo Vailati Co-chair CEER/ERGEG.
Energy Agency of the Republic of Serbia
Challenges for the electricity sector from a TSO perspective Zbyněk Boldiš Member of the Board ČEPS, a.s. ASD Annual Convention – Knowledge Café 24 April.
Civil Societies Expectations on the Energy Union Providing Secure and Affordable Energy to EU Citizens EESC Hearing May S Nies Susanne Nies Corporate.
Jeroen de Joode (ECN/Delft University of Technology) Michiel van Werven (ECN) An analysis of potential bottlenecks Optimal Design of Future Electricity.
Brussels Workshop Use case 3 11/09/2015 Mario Sisinni.
XIV th Florence Forum 24/25 September 2007 Tahir Kapetanovic / Nicolas Bonnesoeur Chairmen of the CEER Electricity Security of Supply TF C07-SOS-03-03a.
Capacity mechanisms in Europe The fundamental issues behind the ongoing sector enquiry Session 2 - If a capacity mechanism, which design is most appropriate?
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
DISTRIBUTED GENERATION, RENEWABLE ENERGY AND SUSTAINABILITY. IMPACT ON POWER QUALITY AND NETWORK PLANNING “Inauguration of the 6th Framework Programme”
20th Century Electric Transmission Grid
THE TRES AMIGAS SUPERSTATION ABB Western Utility Executive Conference September 28, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
1 This project is co-financed by the European Union STATUS OF RENEWABLE ENERGY IN THE MEDITERRANEAN AND CURRENT CHALLENGES; MedReg Perspective By Prof.
European Commission views on intra-day and balancing markets
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
Enterprise Risk Management An Introduction Frank Reynolds, Reynolds, Thorvardson, Ltd.
Smart Grid Schneider Electric Javier Orellana
A Nordic vision for 2025 Nordic TSO Cooperation – more focused and effective.
1 The Tres Amigas SuperStation Low Carbon Summit October 22, 2011.
2009 IEW Conference - Venice Transmission Network Unbundling and Grid Investments: Evidence from the UCTE Countries Paolo Nardi CERTeT – Università Bocconi.
Eric Peirano, Ph.D., TECHNOFI, COO
Future Power System Control Architecture
ETIP SNET WG4 : Digital Energy
Eric Peirano, Ph.D., TECHNOFI, COO
A new platform for testing TSO-DSO coordination schemes
Matthew Wittenstein Electricity Analyst, International Energy Agency
Ben Voorhorst, President, ENTSO-E
WG1: RELIABLE, ECONOMIC AND EFFICIENT SMART GRID SYSTEM
TYNDP: Ten-Year Network Development Plan 2016
Closed Loop Wind Farm Control
Presented by Prof. dr. Nermin Suljanović Elektroinštitut Milan Vidmar
Europe’s emerging energy and environment policy
Incentives for electricity infrastructure – ERGEG view
Presentation transcript:

TRANSMISSION PLANNING IN EUROPE: FROM CURRENT METHODOLOGIES TO A NEW SYSTEMIC APPROACH Angelo L’Abbate, Gianluigi Migliavacca, ERSE (former CESI RICERCA) Gianluca Fulli, JRC - European Commission Madeleine Gibescu, Ana R. Ciupuliga, TU Delft Vienna, 8 September 2009, 10th IAEE European Conference

TREN/FP7/EN/219123/REALISEGRID CHALLENGES FOR GRID PLANNING PLANNING PRACTICES AND NEEDS PLANNING METHODS: THEORY FOCUS ON COST-BENEFIT ANALYSES NEW METHODOLOGY AND TOOL CONCLUSIONS Outline

TREN/FP7/EN/219123/REALISEGRID Recent trends on power grids Source: ENTSO Vertically integrated utilities replaced by unbundled companies competing in power markets Liberalisation process leading to increasing & shifting inter-area exchanges and congestion Escalating onshore (and offshore) wind deployment Security of supply and environmental concerns

TREN/FP7/EN/219123/REALISEGRID Network planning and generation connection are two separate yet intrinsically interlinked processes Wind connection and grid planning  Power production (rather than demand) tends to exert the greatest influence in terms of new transmission requirements  Wind electricity has not simply to be connected to the closest busbar of the grid but has to be effectively integrated into the system through targeted network development and optimization actions Source: TERNA

TREN/FP7/EN/219123/REALISEGRID Network planning objectives & tasks Network planning before/after liberalisation:  Before: the integrated utilities minimised generation and transmission costs, subject to technical constraints  After: Transmission System Operators (TSOs) minimise transmission costs and pursue maximum social welfare, while meeting technical constraints Basic tasks of TSO planners (iterative process):  forecast power and energy flows on the network  check the system compliance against a set of criteria  devise a set of solutions to overcome the criticalities  select the solutions with better cost/benefit performances

TREN/FP7/EN/219123/REALISEGRID Existing planning methods commonly make use of worst-case scenario(s) approach  power flow analysis is performed for a small number of cases selected by experienced network planners Despite stochastic elements are pervading the power systems, probabilistic approaches are not yet fully employed  in some cases, they mainly aim to complement deterministic analyses, upon which the planning decisions are primarily made Existing planning practices

TREN/FP7/EN/219123/REALISEGRID With the increased uncertainty and the many assumptions necessary for the analysis, more combinations of load, (renewable) generation and international exchange shall be captured for a robust planning under a variety of scenarios  probabilistic analyses should be further developed Transmission planning shall change and be even more focused on  better coordination between national TSOs (promising initiatives are being set up)  revised and expanded planning criteria and tools to design flexible, coordinated and secure transmission networks including innovative technologies Emerging needs for grid planning

TREN/FP7/EN/219123/REALISEGRID Literature review of planning methods Classified by approach  deterministic, non- deterministic Classified by timeframe horizon  static, dynamic, pseudo- dynamic Classified by power system structure  regulated systems, restructured systems Classified by technique  classic optimisation, heuristic, meta-heuristic

TREN/FP7/EN/219123/REALISEGRID Need for improved cost-benefit analyses A cost-benefit analysis should take into account the improvements in terms of both reliability and market competitiveness, as well as the interests of consumers and other market players Unlike what happened in old vertical integrated markets, grid expansions may be controversial as they can advantage:  some stakeholder on others, enhancing or reducing producers’ possibility to exercise market power  a zone on another (especially for cross-border investments) and provide diversified incentives to new generation

TREN/FP7/EN/219123/REALISEGRID New systemic approach A valuable cost-benefit analysis should evaluate the advantages of new investments both system-wide and locally, considering the viewpoint of consumers, producers and TSOs (systemic approach) New technologies (WAMS, FACTS, HVDC,…) to better exploit the grid are also assessed The new approach proposed by REALISEGRID, will consider the different benefits (economic, environmental and SmartGrid,...) and weigh them together by carrying out a multi-criteria analysis  A scoring number is calculated to rank possible reinforcements and select the most promising ones in the society's perspective

TREN/FP7/EN/219123/REALISEGRID Benefits from transmission expansion System reliability, quality and security increase System congestions reduction Market competitiveness increase System losses reduction Avoidance/postponement of investments More efficient reserve management Exploitation of energy mix (also in presence of RES) Emission savings (in presence of RES) Power flows controllability increase (via FACTS/HVDC) External and internal costs reduction (in presence of RES) Improved coordination of transmission and distribution grids

TREN/FP7/EN/219123/REALISEGRID How to gauge the reliability benefits 1.Criteria-based approach:  EENS (Expected Energy Not Supplied)  LOLP (Loss Of Load Probability)  LOLE (Loss Of Load Expectation)  SAIDI (System Average Interruption Duration Index)  CAIDI (Customer Average Interruption Duration Index)  SAIFI (System Average Interruption Frequency Index) 2.Value-based approach:  VOLL (Value Of Lost Load)  IEAR (Interruption Energy Assessment Rate)  WTP (Willingness To Pay)  ECOST (Expected Customer Outage CoST)

TREN/FP7/EN/219123/REALISEGRID Market related benefits Increased market competitiveness leading to market price reduction (‘strategic effect’) and network congestions reduction allowing the unlock of more efficient power generation (‘substitution effect’) can be measured by the Social Welfare (SW)

TREN/FP7/EN/219123/REALISEGRID Other benefits Sustainability benefits (in presence of variable RES)  Better exploitation of RES (wind) in the generation mix  Emissions savings (CO 2, NO x, SO 2 )  Reduction of conventional generation external costs  Internal (fossil-fuel) costs reduction SmartGrids development benefits  Improved interaction of transmission and distribution grids

TREN/FP7/EN/219123/REALISEGRID New methodology and tool REALISEGRID is developing a systemic approach to transmission planning, to quantify the benefits of grid expansion in a liberalised environment REALISEGRID is developing a new tool able to calculate the economic benefits resulting from a transmission system enhancement for the different players and for the society as a whole The new simulation tool, among others, has to:  be suitable for power system and market studies  carry out reliability studies (probabilistic criteria)  incorporate emission amount and cost calculations

TREN/FP7/EN/219123/REALISEGRID Conclusions Transmission planning will have to adapt to new situations and uncertainties (mostly represented by market opening and renewable integration)  Transmission planning criteria should be expanded to consider probabilistic approaches  Improved cost-benefit analyses need to systematically and quantitatively assess grid expansion advantages REALISEGRID is developing a new systemic approach and tool for transmission planning, to better evaluate the benefits of grid expansion  This will be tested on the projects belonging to the Trans-European Network priority axis "EL.2. Borders of Italy with France, Austria, Slovenia and Switzerland"

TREN/FP7/EN/219123/REALISEGRID Thanks for your attention Gianluca Fulli EC - Joint Research Centre - Institute for Energy