Protective Regulations Ohio Lake Erie Commission Best Local Land Use Practices January, 2007 Kirby Date, Countryside Program Coordinator.

Slides:



Advertisements
Similar presentations
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Advertisements

Ohio Balanced Growth Program Zoning and Planning for Natural Areas Management Kirby Date, AICP, Cleveland State University.
Ohios Lake Erie Balanced Growth Program Chris Riddle – Ohio Lake Erie Commission Kirby Date – Cleveland State University.
Implementing Committee Meeting May 15 th, 2014 New Braunfels MS4 program and the HCP 1.
What is NPDES? “National Pollutant Discharge Elimination System”
Regulatory Context Natural Environment Chapter Tukwila Comprehensive Plan.
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Brian Wolyniak Urban Forester Penn State Extension ORDINANCES TO PROTECT AND ENHANCE TREE POPULATIONS.
Proposed Stormwater Regulations Public Forum Richland County Government September 2009.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Best Local Land Use Practices A Project of the Ohio Lake Erie Commission The Countryside Program, Levin College of Urban Affairs Kirby Date, AICP Coordinator.
Best Local Land Use Practices A Project of the Ohio Lake Erie Commission The Countryside Program, Levin College of Urban Affairs Kirby Date, AICP Coordinator.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Chapter 102 Changes and Highlights Municipal Update Coordinating Permits.
Indiana 6217 Coastal Nonpoint Source Pollution Control Program – What it is, and What it Means!
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Env 247 Overview of Stormwater Management March 1, 2011.
Storm Water Management and Erosion/Sediment Control Storm water management reduces quantity, and improves quality, of runoff in the watershed Site based.
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
Lakeshore Development Guidelines A Primer Charlie Lake Conservation Society September 2007.
May 2009 Kirby Date, AICP The Ohio Lake Erie Commission ’ s Balanced Growth Program: Best Local Land Use Practices.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Integrating LID Into the Development Planning Process.
Balancedgrowth.ohio.gov Best Local Land Use Practices Kirby Date, AICP Cleveland State University.
Ohio Balanced Growth Program Best Local Land Use Practices Development Incentives Kirby Date, AICP, Cleveland State University.
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
Balancedgrowth.ohio.gov Ohio Balanced Growth Program Kirby Date, AICP, Cleveland State University Chris Riddle, Ohio Lake Erie Commission.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Creation of MS4 Regulations Green / Tradewater River Basin Team Henderson, Kentucky Prepared by Henderson Water Utility April 22, 2008.
Ohio Balanced Growth Program Progress and New Projects Kirby Date, AICP, Cleveland State University Sandra Kosek-Sills, Ohio Lake Erie Commission.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
Applying Stream Buffer Science to the Lake George Watershed Lake George Stream Corridor Management Stakeholder Meeting May 28, 2008.
Post Construction Stakeholder Involvement Charles Brown Town of Cary.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
February 20, 2007 Macon County Planning Board. Structure Height Ordinance Allows construction to 4 stories or 48 feet, whichever is greater Measured from.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
VI. Developing a VSMP Program General Stormwater Training Workshop.
MDOT Storm Water Management Plan Module 2: Best Management Practices
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
From the Beginning Design Standards and Other Post-Construction Program Elements.
Best Local Land Use Practices A Project of the Ohio Lake Erie Commission The Countryside Program, Levin College of Urban Affairs Kirby Date, AICP Coordinator.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Bureau of Watershed Management Regulatory Proposal Chapter 102 [Erosion and Sediment Control] Erosion, Sediment and Stormwater Management February 21,
Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008.
Ohio Balanced Growth Program Codes and Ordinances Workshop: Recommendations for Development and Site Layout Kirby Date, AICP, Cleveland State University.
Bureau of Watershed Management Preliminary Regulatory Proposal Chapter 102 Erosion, Sediment and Stormwater Management December 19, 2007.
Draft Generic Environmental Impact Statement for Adoption of Stream Corridor Management Regulations for the Lake George Park.
Putting It All Together: Selection and Application of Low-Impact Development BMPs.
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
County-Wide Act 167 Plan “County-wide Act 167 Stormwater Management Plan for Chester County, PA” was prepared by: Chester County Water Resources Authority.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Pollution Control: For Field Office Construction Sites.
Williamsburg’s Local Strategies to meet the ChesBay TMDL March 2012 Chesapeake Bay Watershed Virginia Maryland Pennsylvania New York Delaware West Virginia.
OPEN SPACE/ CONSERVATION
Supervisor, RIDEM RIPDES Permitting Program
Storm Water Pollution Prevention Plan Development
Hudson Wetlands Protection Bylaw
Water Quality Protection Zones
Overview of US EPA & State Manure Management Regulations
STORMWATER MANAGEMENT
MS4 OVERVIEW 2015.
Agricultural Order 4.0 Discussion
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

Protective Regulations Ohio Lake Erie Commission Best Local Land Use Practices January, 2007 Kirby Date, Countryside Program Coordinator

Riparian/Wetland Setbacks: Basic definition Setback vs. “buffer” Apply to new construction only: existing improvements grandfathered Apply to reconstruction/reuse after a period of abandonment

Riparian/Wetland Setbacks: Applicability Location/applicability of setbacks - drainage area > ½ mile: all streams -drainage area < ½ mile: streams with defined bed and bank Usually class 2 and 3 wetlands Some models define as identified on certain maps Should apply to agricultural ditches Some models exempt agriculture, mining

Riparian/Wetland Setbacks: Width Width determined by watershed drainage area, or class of wetland Riparian: 25 to 300 feet from top of established ordinary high water mark is typical – some variation among models Wetlands: Class 2 – 75 feet; Class 3 – 120 feet. Flexibility and Buildability: control location of development while allowing it to occur Riparian: Should include 100 year floodplain, and riparian wetlands class 2 and 3 Role of the Guide Map

Riparian and Wetland Setbacks: Permitted, Conditional Uses Permitted Uses - recreation -removal of damaged trees -revegetation with advice Conditional Uses (often with approved plan) -(landscaping) -stream crossing -stream bank restoration -(trails) -(fencing) -(selective harvesting) -stormwater detention

Riparian/Wetland Setbacks: Prohibited Uses Prohibited Uses -structures or expansion of existing structures -vegetation removal -(landscaping expansion) -(fencing) -septic/wastewater disposal -roads/drives/parking -motorized vehicles

Riparian Setbacks: Administrative Issues Meets Ohio EPA Phase II requirement for Post- Construction practices Wetland, riparian setback regulations can be combined or separate Need strong purpose statement Zoning and/or building permit contingent on compliance Variance flexibility is provided Conditions for variances vary Timing of setback identification, review of plans Monitoring during construction Enforcement based on complaint, or annual monitoring Penalties: typically a misdemeanor

Stormwater Management Regulations: Two Types Construction Runoff Control (AKA Erosion/Sediment Control): Water Quality – Requires SWPPP Post-Construction Control: Water Quality AND Quantity – managed through SWPPP and SWMP

Erosion/Sediment Control: How it works Requires preparation of a storm water pollution prevention plan (SWP3), or Abbreviated SWP3 Establishes standards and preferred methods for control of sediment

Erosion/Sed Control: Methods Nonstructural : site design and avoidance of disturbance in the first place Stabilization: Covering/seeding disturbed areas Runoff control: Diverting runoff from disturbed areas (swales, dikes, berms, etc.) Sediment control measures: collecting sediment and keeping it on site (silt fences, settling ponds, storm sewer inlet protection)

Post-Construction Stormwater Management : How It Works Requires Comprehensive Stormwater Management Plan for activities disturbing soil Sets standards for volume, rate and quality of runoff from completed project Sets standards for preferred methods and facilities

Post-Construction Stormwater Management: Methods Structural practices acceptable to Ohio EPA: wet retention, dry retention, etc. Nonstructural: site design, conservation development, minimizing disturbance, riparian/wetland setbacks Low impact development practices: rain gardens, grassy swales, etc.

Both Types: Administrative Issues Both types must be addressed – together or separate Standards and practices must meet minimum OEPA standards Should require compliance with State/Federal Regulations Must require provisions for maintenance of facilities during and after construction

Administrative Issues continued Who will have responsibility for plan review and inspection? Who will have responsibility for long-term maintenance of facilities? How will long term monitoring be handled? Erosion/Sed Control - Must have authority to stop work immediately Must have provisions for enforcement Penalties – most are a misdemeanor

Recommended Review Process 1)Conceptual Plan Stage (“Sketch Plan”) -Pre-application meeting -Sketch Plan Submitted -Review on-site: riparian/wetland delineation 2)Preliminary Plan Stage -Preliminary Plan -determine applicability of state/federal regulations 3)Preliminary Improvement Plan Stage -Construction drawings -submit crossing, riparian setback, slope stabilization, stormwater etc plans (as required by regulation) -all permits/approvals in process (required) for final approval 4)Final Plat -record all easements, setbacks, agreements as required by regulation

Steep Slope Protection Regulations: How They Work Often are naturally included in riparian protection Permit based regulation types require conditional use for construction on slopes steeper than a designated slope (15- 30%)

Steep Slope Regulations: Works ctd. Riparian setback expansion types require normal riparian setback to be expanded to include slopes over a certain % Another approach is to expand riparian setback based on more detailed engineering analysis including soils, vegetation, etc as well as slope

Steep Slope Protection Regulations: Issues In theory, “any slope can be developed” – but there are health and safety considerations Engineering analysis helps to justify slope level cutoff point Other provisions of riparian setbacks can be applied (lot flexibility, variances, grandfathering, etc.)

Steep Slope Regulations: Decision Points Engineering analysis: what are professional recommendations, based on analysis? Determine best of three approaches Establish slope limits for regulation Establish uses and restrictions within steep slope area Establish procedures for review, inspection, monitoring, enforcement, and variance

Meadow Protection Regulations: How they work Recommended for communities with mowing ordinances that would prevent natural area management Permit Laws require an approved management plan; require review and monitoring Exclusion Laws exempt native grass areas from mowing ordinance; initiated upon complaint Proactive Laws require native grass areas in new landscapes; require review and monitoring

Meadow Protection: Works ctd. All are based on recommendations of identified “expert” Some regulations are set up as setback regulations

Meadow Protection Regulations: Issues Relationship with meadow “expert” must be established (SWCD?) Invasive and noxious weeds must be prohibited Permit and Proactive type laws require professional plan preparation, establishment of review procedures and long-term monitoring Public/neighbor education is critical Inspection and enforcement are important

Meadow Protection: Decision Points Is a protection law needed? Choose between Permit, Exclusion, and Proactive approach Identify best “expert” Establish review, inspection and enforcement procedures Identify responsibilities for education and technical assistance of public

Woodland Protection Regulations: How They Work Focused on new development sites Requires arborist review prior to design Incorporates design criteria into project review

Tree Protection Regulations: works ctd. Establishes standards for tree protection during and after construction Establishes procedures for review, inspection, monitoring, and enforcement

Woodland Protection: Issues Initial site review and construction protection plan must be prepared by qualified professional Size alone does not determine priority for preservation: should be based on species, health, sensitivity to disturbance, as well as size True long-term tree protection requires avoidance of site compaction, hydrology alteration, and alteration of sunlight conditions for a large area around tree (up to 3 times width of drip line) Monitoring and enforcement are critical – once a tree is gone or severely injured nothing can be done Relationship to forest management requirements Relationship to riparian setbacks

Woodland Protection: Decision Points Identify likely high priorities for preservation in comprehensive planning process Identify procedures and responsibilities for review, inspection, monitoring, and enforcement Identify experts who can provide technical assistance/recommendations to community

Questions?