Next generation of ν beams Challenges Ahead I. Efthymiopoulos - CERN LAGUNA Workshp Aussois, France, September 8,2010 what it takes to design and construct.

Slides:



Advertisements
Similar presentations
WP2: Targets Proposed Outline Work Programme Chris Densham.
Advertisements

European Involvement in T2K Neuchatel June 21, 2004 Dave Wark Imperial College /RAL.
Neutrinos from Stored Muons STORM Target Station Conceptual Design 15-April-2013 Kris Anderson Fermilab/Accelerator Division/Mechanical Support Department.
Ottone Caretta & Chris Densham Technology Business Unit Rutherford Appleton Laboratory A new idea for NuFact targets and beam dumps BENE Nov 06 – Frascati,
Fluidised powder target research A potential target technology for both a Superbeam and a neutrino factory CJ Densham, O Caretta, P Loveridge STFC Rutherford.
K. McDonald LEMC Workshop 22 Apr 2008 From MERIT to a Muon Collider (Front End) K.T. McDonald Princeton U. Low Emittance Muon Collider Workshop Fermilab,
Managed by UT-Battelle for the Department of Energy Neutrino Factory Mercury Containment Concepts V.B. Graves 2 nd Oxford-Princeton High- Powered Target.
Neutrino Factory Target Cryostat Review Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
Neutrino Factory Mercury Flow Loop V. Graves C. Caldwell IDS-NF Videoconference March 9, 2010.
Target & Capture for PRISM Koji Yoshimura On behalf of PRISM Target Group Institute of Particle and Nuclear Science High Energy Accelerator Research Organization.
1Managed by UT-Battelle for the U.S. Department of Energy MERIT Videoconference 11 Mar 2009 Neutrino Factory Cryostat 1 Concept V.B. Graves MERIT Videoconference.
K. McDonald 2 nd Oxford-Princeton Targetry Workshop 6 Nov 2008 High-Power Targets for Superbeams and Neutrino Factories (and Muon Colliders) K.T. McDonald.
Harold G. Kirk Brookhaven National Laboratory High-Power Targets H.G. Kirk Applications of High-Intensity Proton Accelerators FNAL October 20, 2009.
Harold G. Kirk Brookhaven National Laboratory The MERIT High-Power Target Experiment Muon Collider Design Workshop BNL December 3-7, 2007.
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August Targetry R&D in the 5-Year Plan Harold G. Kirk Brookhaven National Lab.
Primary Target Systems for a Muon Collider / Neutrino Factory. What has the experimental effort taught us thus far. N. Simos, H. Kirk, S. Kahn, P. Thieberger,
KT McDonald Muon Collider 2011 June 28, The Target System Baseline K. McDonald Princeton U. (June 28, 2011) Muon Collider 2011 Telluride, CO More.
Above: Energy deposition in the superconducting magnet and the tungsten-carbide shield inside them. Approximately 2.4 MW must be dissipated in the shield.
May 17-19, 2000 Catalina Island, CA Neutrino Factory and Muon Collider Collaboration Meeting 1 Target Support Facility for a Solid Target Neutrino Production.
Harold G. Kirk Brookhaven National Laboratory Target System Update IDS-NF Plenary Meeting Arlington, VA October 18, 2011.
K. McDonald EURO Meeting 26 Mar 2009 High-PowerTargets for Neutrino Beams and Muon Colliders K.T. McDonald Princeton U. EURO Meeting CERN, March 26, 2009.
Harold G. Kirk Brookhaven National Laboratory Target Baseline IDS-NF Plenary CERN March 23-24, 2009.
1Managed by UT-Battelle for the U.S. Department of Energy NMFCC Friday Meeting 10 Apr 2009 Neutrino Factory Nozzle Layouts V.B. Graves NFMCC Friday Meeting.
IDS-NF Target Studies H. Kirk (BNL) July 8, 2009.
K. McDonald Muon Collaboration Meeting 19 Mar 2008 Future Target System R&D Analysis (and simulation) of MERIT data is ongoing, but the success of the.
Above: Power deposition in the superconducting magnets and the tungsten-carbide + water shield inside them, according to a FLUKA simulation Approximately.
Harold G. Kirk Brookhaven National Laboratory Recent Results from MERIT NUFACT09 Illinois Institute of Technology July 22, 2009.
The MERIT experiment at the CERN PS Leo Jenner MOPC087 WEPP169 WEPP170.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
The Front End MAP Review Fermi National Accelerator Lab August 24-26, 2010 Harold G. Kirk Brookhaven National Laboratory.
Front End Technologies Harold Kirk Brookhaven National Laboratory February 19, 2014.
IDS-NF Mercury System Overview Van Graves IDS-NF 5 th Plenary Meeting April 9, 2010.
Target and Absorbers L2 Manager: K McDonald, Princeton U March xx, 2013 Presenter’s Name | DOE Mini-Review of MAP (FNAL, March 4-6, 2013)1 Mission Target:
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
Harold G. Kirk Brookhaven National Laboratory A MW Class Target System for Muon Beam Production AAC 2014 San Jose, Ca July 14-18, 2014.
Ajit Kurup, Imperial College London. Neil Bliss, Norbert Collomb, Alan Grant, STFC/DL, Daresbury. Costing Methodology and Status of the Neutrino Factory.
A powder jet target for a Neutrino Factory Ottone Caretta, Chris Densham (RAL), Tom Davies (Exeter University), Richard Woods (Gericke Ltd)
Harold G. Kirk Brookhaven National Laboratory Targetry Concept for a Neutrino Factory EMCOG Meeting CERN November 18, 2003.
KT McDonald MAP Spring Meeting May 30, Target System Concept for a Muon Collider/Neutrino Factory K.T. McDonald Princeton University (May 28, 2014)
Fermilab Neutrino Beamline to DUSEL Mike Martens Fermilab PAC November 3, 2009.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Target & Capture for PRISM Koji Yoshimura Institute of Particle and Nuclear Science High Energy Accelerator Research Organization (KEK)
T2K Secondary Beamline – Status of RAL Contributions Chris Densham, Mike Fitton, Vishal Francis, Matt Rooney, Mike Woodward, Martin Baldwin, Dave Wark.
KT McDonald MAP Winter Meeting (SLAC) December 5, Solid Target Options for an Intense Muon Source K. McDonald Princeton U. (December 5, 2014) MAP.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
Harold G. Kirk Brookhaven National Laboratory Targetry Concept for a Neutrino Factory Muon Meeting BNL January 26, 2004.
KT McDonald MAP Tech Board Meeting Oct 20, The MAP Targetry Program in FY11 and FY12 K. McDonald Princeton U. (Oct 20, 2011) MAP Technical Board.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
CNGS Operation Summary Edda Gschwendtner, CERN. Outline Introduction CNGS Performance Highlights since last NBI 2010 in Japan Issues Summary 2E. Gschwendtner,
Neutrino Factory Target Cryostat Review (Update Aug 12) Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
Engineering studies for CN2PY secondary beam. LAGUNA-LBNO General Helsinki, 26/08/20141 F. Sanchez Galan (CERN) on behalf of the CERN Secondary.
Engineering studies for the Conceptual design of the LBNO Facility 1 F. Sanchez Galan (CERN) on behalf of the CERN Secondary Beam Working Group, With contributions.
Thanks to all members of organisation committee for the preparation of this event Thanks to all participants for their interest R.Schmidt Introduction.
Harold G. Kirk Brookhaven National Laboratory Muon Production and Capture for a Neutrino Factory European Strategy for Future Neutrino Physics CERN October.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Horn and Solenoid options in Neutrino Factory M. Yoshida, Osaka Univ. NuFact08, Valencia June 30th, A brief review of pion capture scheme in NuFact,
UK Neutrino Factory Conceptual Design
Tungsten Powder Test at HiRadMat Scientific Motivation
News and brief overview of Beamline plans for the next few months
Target and Horn status report
Accelerator R&D for Future Neutrino Projects
Presentation transcript:

Next generation of ν beams Challenges Ahead I. Efthymiopoulos - CERN LAGUNA Workshp Aussois, France, September 8,2010 what it takes to design and construct a MW class Super-beam or Neutrino Factory First  event from OPERA/CNGS EDMS Id:

Neutrino beams I.Efthymiopoulos-CERN, Sep 8,2010  Three “conventional” ν beams operational today Overview CNGS - 0.3MW sustained operation 0.5MW if in dedicated mode CN2?? MW “ultimate”, requires SPS and injector upgrade HP-CN2?? - 4MW operation requires if HP-SPL + HP-PS’ NUMI/MINOS - 0.3MW sustained operation NUMI/NOVA MW upgrade (~2013) LBNE/DUSEL - 2MW operation requires Project-X T2K - 0.1MW operation so far T2K MW gradually ~2011 T2K MW designed operation after some years CERN FNAL JPARC 2

Neutrino beams I.Efthymiopoulos-CERN, Sep 8,2010  Conventional neutrino beam  Super-beam if proton beam power >1MW Super beams 43.4m 100m 1095m18m5m 67m 2.7m TBID p + C  (interactions)  π +, K +  (decay)  μ + + ν μ 3

Neutrino beams I.Efthymiopoulos-CERN, Sep 8,2010  IDS-NF baseline Neutrino factory p + C (interactions)  μ ± (capture, accelerate, store, decay) )  ν μ, ν e  Typically a MMW system for the target and front-end 4

Neutrino beams I.Efthymiopoulos-CERN, Sep 8,2010  Experience shows that DESIGNING and OPERATING a high- power neutrino beam facility is rather challenging  Key issues where present R&D effort is concentrated:  Target and Target chamber designs  SB: Secondary beam elements – NF: Front-end system SB: horns – NF: cooling channel, RF & absorbers  SB: Hadron stop – NF: Beam dump  SB: Decay tunnel – NF: Storage ring  Neutrino beam monitoring & Near detector Challenges 5

Neutrino beams - Targetry  Targets are key elements in the production of neutrino beams I.Efthymiopoulos-CERN, Sep 8,2010 Overview High-power primary beam (protons) Target Secondaries π (for Super ν beams) μ (for Neutrino Factory or Muon Collider)  High-power targetry challenges  Thermal management : target melting (solid targets) – Target vaporization (liquid)  Radiation Radiation protection - induced radiation - remote handling  Thermal shock Beam induced pressure waves  Choice of materials  Material Choices  Solid targets Fixed Moving Particle beds  Liquid  Hybrid  Particle beds in liquids  Pneumatic driven particles Where is the limit for solid targets? 6

Target systems I.Efthymiopoulos-CERN, Sep 8,2010 Present facilities CNGS : graphite rods 4(5)mm ∅, air cooled T2K: graphite, forced He cooling NUMI: graphite, water cooling 7

Target systems – future facilities I.Efthymiopoulos-CERN, Sep 8,2010 Neutrino Factory – MMW target station Iron Plug Proton Beam Nozzle Tube SC-1 SC-2 SC-3SC-4 SC-5 Window Mercury Drains Mercury Pool Water-cooled Tungsten Shield Mercury Jet Resistive Magnets Neutrino Factory Study 2 Target Concept ORNL/VG Mar2009 Splash Mitigator V.Graves - ORNL 8

The MERIT experiment I.Efthymiopoulos-CERN, Sep 8,2010 MMW target concept – proof-of-principle experiment Syringe Pump Secondary Containment Jet Chamber Proton Beam Solenoid 9

The MERIT Experiment I.Efthymiopoulos-CERN, Sep 8,2010  Jet surface smoothens out with the increased magnetic field Setup Experimental CERN Hg-jet stabilization by magnetic field 0T Jet velocity: 15m/s 10T 10

The MERIT Experiment I.Efthymiopoulos-CERN, Sep 8,2010  Hg-jet disruption mitigated by magnetic field  20 m/s jet operation allows up to 70Hz operation with beam Key results Hg-jet 4×10 12 p, 10T fied  Disruption threshold: >4×10 12 GeV, 10T field  115kJ pulse containment demonstrated  8 MW capability demonstrated 11

The MERIT Experiment I.Efthymiopoulos-CERN, Sep 8,2010  The MERIT experiment successfully demonstrated the target concept of a liquid target (Hg-jet) for a Neutrino Factory/Muon Collider setup HOWEVER….  Going from the proof-of-principle to a real implementation of a target station for a 4MW beam operation requires additional R&D and engineering design  Key issues:  Radiation : to materials, shielding, access conditions, environment  Remote handling : maintenance and early repair operations  Ventilation, access  Dismantling Summary 12

Target station – Future facilities I.Efthymiopoulos-CERN, Sep 8,2010 Neutrino Factory – MMW target station P. Spampinato - ORNL 13

Target station – Future facilities I.Efthymiopoulos-CERN, Sep 8,2010 LBNE – super beam design P.Hurh - FNAL 14

Target station – Future facilities  Designed for Mega-W proton beam power  Massive shielding to acceess the beam elements I.Efthymiopoulos-CERN, Sep 8, T2K target station Beam elements Shielding (movable)

Target station - Remote handling I.Efthymiopoulos-CERN, Sep 8,2010 LBNE – target station hot cell P.Hurh - FNAL 16

Target station - Remote handling I.Efthymiopoulos-CERN, Sep 8,2010  Remote handling operations for target exchange T2K facility C.Densham - RAL 17

Focusing elements I.Efthymiopoulos-CERN, Sep 8,2010  Material  Few materials to avoid galvanic corrosion  Al typically he best choice  Radiation  Electrical issues  Cooling (water)  Mechanical stresses – pulsing  Alignment precision  Exchange and maintenance procedures Design issues - horns CNGS horn 18

Decay pipe I.Efthymiopoulos-CERN, Sep 8,2010  Shielding & cooling(?) along the decay pipe  T2K: He container 19 T2K decay pipe

Hadron stop – Beam dump I.Efthymiopoulos-CERN, Sep 8,  They both take substantial amount of the beam power  non trivial to design !!!  Cooling and RP issues the main worries T2K Hadron Stop T. Ishida – JPARC T. Davonne - RAL Hg-Jet/Beam dump impact

Technical challenges I.Efthymiopoulos-CERN, Sep 8,  Civil engineering – big slopes, depth for near detector  Installation/maintenance of equipment  Beam instrumentation  Beam collimators (around target area)  Alignment (installation & beam-based methods)  Ventilation  Air activation, tritium  Access  Cranes – remote handling  Decommissioning  … and think of early repairs !!! To complete the picture

Summary I.Efthymiopoulos-CERN, Sep 8,  The design of neutrino beams from Mega-Watt proton beam sources is very challenging pushing materials and components to the limits  Experience exists from the design and operation of conventional neutrino beams over the last years at CERN (CNGS), NUMI(FNAL), JPARC(T2K) which could easily operate at 0.75MW of proton beam power  The T2K facility designed to accept up to 4-MW of primary beam power will hopefully grow up in intensity reaching the Mega-W region in few years, thus would provide useful information for the design of other neutrino superbeams presently under consideration