Introduction to Construction General Permit Inspections Pre-Inspection Preparation.

Slides:



Advertisements
Similar presentations
Jamie Petersen Administrative Assistant - Stormwater Front Desk: (402) Michael Crisco Program Specialist – Storm.
Advertisements

GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
A State’s Perspective of the EPA’s Effluent Limitations Guidelines 40 CFR Part 450 Jeffrey B. Shaver, PE, CPESC AASHTO Subcommittee On Design July 27,
Implementing Committee Meeting May 15 th, 2014 New Braunfels MS4 program and the HCP 1.
What is NPDES? “National Pollutant Discharge Elimination System”
Stormwater 101: How to stay out of trouble with TDEC.
Ferguson Township Municipal Separate Storm Sewer System (MS4) Stormwater Management Program (Our MS4 Story) April 6, 2015 Board of Supervisors Meeting.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
GEORGIA ENVIRONMENTAL PROTECTION DIVISION SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Env 247 Overview of Stormwater Management March 1, 2011.
Overview of RIPDES Construction General Permit Requirements Developed by: Greg Goblick, Laura Stephenson RI Department of Environmental Management RIPDES.
1 Common Issues on Plans Recertification Training For Level II Introduction to Design Certified Plan Reviewers and Certified Design Professionals Issued.
SMARTS Training definitions CGP transition plan Pilot project discussion SMARTS Manual review 1.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN DESIGN APPROACH- THE BASICS Issued May 2009.
AZPDES and Construction Sites Greg Wise Environmental Program Specialist Arizona Department of Environmental Quality (602)
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Module 7: Construction Phase
Expedited Settlement Offer Worksheet Deficiencies Form
Introduction to Construction General Permit Inspections.
Stormwater Permitting at Airports Julianne Rantala MPCA, Industrial Division.
1 The Plan and Plan Review Issued May 2009 Level IB: Advanced Fundamentals Seminar Education and Training Certification Requirements for Persons Involved.
NYS Department of Environmental Conservation DRAFT SPDES General Permit for Stormwater Discharges from Separate Storm Sewer Systems (MS4s) (GP )
Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.
Environmental Viewer and KPDES Permit Maintenance Managers April 2007.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
MS4/sMS4 Annual Report Development Thea Lomax Presenter Storm Water Enforcement Thea Lomax Presenter Storm Water Enforcement Prepared 07/04/2011.
Creation of MS4 Regulations Green / Tradewater River Basin Team Henderson, Kentucky Prepared by Henderson Water Utility April 22, 2008.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Non-Storm Water Discharge (NSD) (Dry Condition) Observation Inspection and Reporting.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
State Water Resources Control Board Division of Water Quality Industrial/Construction Storm Water Unit.
Construction Stormwater Rules-2012 Rodney Hendrick, Ph. D. Louisiana Urban Stormwater Coalition.
Erosion & Sediment Control. Wind Erosion Water Erosion.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Phase II National Storm Water Regulations What’s in it for you?
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
Erosion and Sediment Control Programs at the Cities of Colleyville, Keller, Grapevine, Southlake, and Trophy Club Jimmy Brock, City of Colleyville Keith.
MS4 APPLICATION PROCESS Mark Fife Water Bureau Water Bureau Permits Section Permits Section.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
SW101 Large and Small Construction Denise Hamilton, EPA Region 6 8 th Annual Region 6 MS4 Operators Conference June 26, 2006.
San Rafael, California November 12, 2015
Part 5 - Good Housekeeping
Bud Amorfini – R6SLT Paul Keiran – R1 Compliance Inspection Reports and Data Reporting Course Overview Introduction and Inspector Qualifications Pre-Inspection.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Pollution Control: For Field Office Construction Sites.
Expectations for Construction Activities The City of Hendersonville Department of Public Works Erosion Control Inspection Review Process Power Point Presentation.
City of Clarksville Storm Water Management Manual Revisions 2014.
MS4 & Construction Storm Water Permits
Municipal Separate Storm Sewer System (MS4) Permit
Supervisor, RIDEM RIPDES Permitting Program
SWPPP Basics.
Storm Water Pollution Prevention Plan Development
Presentation to the Livingston City Council on the Phase II MS4 Permit
TPDES Construction Management at the City of Laredo
John Tinger U.S. EPA Region IX
Stormwater Pollution Prevention Plans
“How To Ace an Inspection” Russell McLaren – Entergy ARES Water Lead
Flow chart to determine whether coverage is required
Stormwater Construction General Pemit (CGP) TXR150000
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

Introduction to Construction General Permit Inspections Pre-Inspection Preparation

Review of Permit Required Documents Assessment of Compliance History Communications and Logistics

Permit Required Documents Notice of Intent (NOI) Risk Assessment Site Map Storm Water Pollution Prevention Plan Annual Fee Signed Certification Statement Post-Construction Water Balance Calculator Results Complete Active Treatment System Plan Certification of Proof that ATS design was completed by a Certified/Licensed Professional Particle Size Analysis

Notice of Intent The following should be included in an NOI: – WDID - The facility identification number or WDID number is the number the SWRCB gives each permittee when they apply for an NOI. – Risk Level – Property Owner Information including name Address contact information. – Contractor/Developer Information including name Address contact information.

Notice of Intent (cont.) The following should be included in an NOI: – Construction Site Information Address site contact information Coordinates construction area size Schedule type of construction site QSD information. – Certification Information Name of certificate holder Title of certificate holder

Risk Assessment 1.Determine Sediment Risk 2.Determine Receiving Water Risk 3.Determine Combined Risk Level

Risk Assessment – Sediment Risk Determine Sediment Risk using one of the methods listed: – GIS Map Method using EPA Rainfall Erosivity Calculator and GIS Maps provided in SMARTS – Individual Method using EPA Rainfall Erosivity Calculation and Site Specific Data

Risk Assessment – Receiving Water Risk Determine Receiving Water Risk using one of the methods listed: – GIS map of Sediment Sensitive Watersheds provided SMARTS – Site Specific analysis based on Regional Board Basin Plans and the State Water Board 303d list of impaired waterbodies

Site Map A site map should include the following: – The project’s surrounding area (vicinity) – Site layout – Construction site boundaries – Drainage areas – Discharge locations – Sampling locations – Areas of soil disturbance (temporary or permanent) – Active areas of soil disturbance (cut or fill) – Locations of all runoff BMPs

Site Map (cont.) A site map should include the following: – Locations of all erosion control BMPs – Locations of all sediment control BMPs – ATS location (if applicable) – Locations of sensitive habitats, watercourses, or other features which are not to be disturbed – Locations of all post-construction BMPs – Locations of storage areas for waste, vehicles, service, loading/unloading of materials, access (entrance/exits) points to construction site, fueling, and water storage, water transfer for dust control and compaction practices

Storm Water Pollution Prevention Plan The SWPPP should be project specific and should be developed by a Qualified SWPPP Developer (QSD) The amount of detail included in the SWPPP is dependent upon the project risk level The inspector should compare the PRDs to the information included in the SWPPP document

Storm Water Pollution Prevention Plan SWPPPs should address the following: – All pollutants and their sources – All non-storm water discharges not already permitted – All site BMPs addressing storm water discharges and authorized non-storm water discharges – Any calculations and design details – All stabilization BMPs

Annual Fee In order to obtain permit coverage, an annual fee must be submitted to the SWRCB The inspector can verify that the discharger paid the necessary fee on SMARTS

Signed Certification Statement The signed certification statement is a signed document stating that the PRDs were: – Prepared under the direction or supervision of the Legally Responsible Person (LRP), and – The information submitted is true, accurate, and complete.

Post Construction Water Balance Calculator The Post Construction Water Balance Calculator must be completed by dischargers in unincorporated areas of the State – areas not already subject to post-construction standards of an active Phase I or II municipal separate storm sewer system (MS4) permit that has an approved Storm Water Management Plan There are two parts of the Post Construction Water Balance Calculator – Map portion – Worksheet portion

Post Construction Water Balance Calculator (cont.) The map portion should show a topographic map of the site with pre- and post-construction information The map should be easily readable with an appropriate scale Note the locations where the construction project will result in slope increases from existing slope – Results should be consistent with the areas reported in the spreadsheet section of the calculator Note the locations where impervious surfaces are added to the site – Results should be consistent with the areas reported in the spreadsheet section of the calculator.

Post Construction Water Balance Calculator (cont.) The worksheet section of the calculator is meant to show the projected increase of runoff from the site and determine methods to mitigate the increase in runoff The worksheet allows credits for the following: – Runoff Volume Reduction Credit – Runoff Volume Reduction Each of these credits has its own tab which should be checked for accuracy by the inspector A majority of the tabs contain yes/no questions which can be easily confirmed by reviewing the site plan Some tabs (such as pervious pavement) require an area calculation.

Post Construction Water Balance Calculator (cont.) Runoff Volume Reduction Credit – Porous Pavement – Tree Planting – Downspout Disconnection – Impervious Area Disconnection – Green Roof – Stream Buffer – Vegetated Swales Runoff Volume Reduction – Rain Barrels/Cisterns – Landscape Soil Quality

Active Treatment System Plan An Active Treatment System Plan is required for all projects implementing ATS All plans should include (Page 2 of Appendix F of CGP): – ATS Operation and Maintenance Manual for All Equipment – ATS Monitoring, Sampling & Reporting Plan, including Quality Assurance/Quality Control (QA/QC) – ATS Health and Safety Plan – ATS Spill Prevention Plan – Active Treatment Systems shall include the following treatment processes (Appendix F of the CGP): – Treatment - Coagulation and Flocculation – Filtration

Active Treatment System Plan Appendix F provides the permit requirements to which Active Treatment Systems should conform The ATS will be based on design storm assumptions – The inspector should verify whether the assumptions are reasonable the compliance storm event is the 10 year, 24 hour storm determined by maps provided in Appendix F of the CGP

Active Treatment System Plan The inspector should pay particular attention to the ATS Operation and Maintenance Plan and ATS monitoring proposed by the Discharger – ATS require continuous monitoring During site inspections, the inspector should confirm that the Operation and Maintenance plan and monitoring are being conducted properly.

Active Treatment System Plan The inspector should verify that any ATS system is designed and approved by: – Certified Professional in Erosion and Sediment Control(CPESC) – Certified Professional in Storm Water Quality (CPSWQ) – California registered civil engineer – any other registered engineer” The certification of proof should indicate the qualifications of the designer. The inspector should verify that personnel operating any ATS system have completed training consistent with the minimum requirements in Attachment F, page 7 of the CGP – Upon request, operators should provide certificate copies.

Particle Size Analysis Dischargers who are proposing an Alternate Risk Justification are also required to submit a Particle Size Analysis as part of the PRD submittal.

Assessment of Site Compliance History Review previous inspections conducted on the construction site Review the compliance actions taken in response to a previous visit Note any issues with the site that may have been noted but did not require a compliance action The inspector should consider what actions were taken by the Discharger to correct the historical issues.

Communications and Logistics Inspectors may conduct announced or unannounced inspections of construction sites Unannounced inspections are preferred, but if an Inspector chooses to conduct an announced inspection, 24 hours of notice is appropriate Inspectors can communicate with the Discharger to ask for clarification of permit required documentation. If some of the permit required documentation is lacking, the inspector may request submittal of additional information.

Coordination with Other Agencies Inspectors are encouraged to coordinate with other oversight agencies to avoid duplicate inspections Possible Agencies include: – Regional Water Quality Control Board(s) – State Water Resources Control Board – U.S. Environmental Protection Agency – Authorized representative of the municipal operator of the MS4 storm system receiving discharge