Ladder assembly steps HFT PIXEL 1/04/2009 ladder fixture.SLDASM.

Slides:



Advertisements
Similar presentations
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
Advertisements

Instructions for making plunger fork tool. Drawing for the trigger assembly.
Sanders and Sanding Safety
How to carry out experiments using MPMS March 2012 Takeshi NAKAGAWA.
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
Goodson Tools and Supplies for Engine Builders
2G BBULBE PASS Instructions-4 Replacement of bubble generator.
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Nov. 19, 2007 Rev. B.
1 Ladder assembly steps HFT PIXEL updated for ultimate chip ladders 2/12/2012 ladder fixture u.SLDASM.
Naming Convention HFT PIXEL 12-June pixel identification sector – ladder – chip - row - column 1-10in out1 out2 out Alternative.
LBNL Michal Szelezniak, Eric Anderssen, Leo Greiner, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Chinh Vu, Howard Wieman UTA Jerry Hoffman, Jo Schambach.
HFT PXL Mechanical July 2010 Howard Wieman LBNL 1.
1 CARRIER BUS LAYOUT(a) ± 193 mm ladder1ladder mm mm Pixel chip Michel Morel EP/ED 09/ x 425µ 256 x 50µ Decoupling capacitors
Hydronic Mechanical Controls
Naming Convention HFT PIXEL 12-June-2009 Updated 03/08/2013 By LG to include row and column information for Ultimate sensors.
HFT & PXL geometry F.Videbæk Brookhaven National Laboratory 13/9/12.
1 CARRIER BUS LAYOUT(a) ± 193 mm ladder1ladder mm mm Pixel chip Michel Morel EP/ED 09/ x 425µ 256 x 50µ Decoupling capacitors
Vacuum chuck for probe station contacts: Howard Wieman work: cell: Eric Anderssen
Better pointing with HFT PIXELS a focus on the mechanics 15-Jan-2009 Wieman.
Setting up the Ricoh C305 Press F5 to start the Presentation
Receive processed un-thinned wafers from E2V. Processed for bump bonding (dice, bump and attach read out chip)
ILC Vertex Tracker Ladder Studies At LBNL M Battaglia, D Contarato, L Greiner, D Shuman LBNL, Berkeley.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Camera Pieces in Box TV Battery Battery Charger Camera Sun shade.
Design Progress Allen Ellis 18-September
1 ladder to sector out2 bond fixture HFT PIXEL 11/16/2008 ladder to out2 bond fixture.SLDASM.
BIX In-Building Cross Connect system BIX Installation Guide ELCM 254 Updated December 2013 gmail.com 1 Most of the images and some text for.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
HFT PIXEL Mechanics HFT Review 25-Mar-2009 Wieman.
BTeV Pixel Substrate C. M. Lei November Design Spec. Exposed to >10 Mrad Radiation Exposed to Operational Temp about –15C Under Ultra-high Vacuum,
WeldFit Push-in Fittings
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
1 STAR HFT Pixel Detector Howard Wieman Lawrence Berkeley National Lab.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
Compressor Replacement – ODU
F.Videbaek PXL geometry update. PXL ladder For realistic simulation it is essential to get the proper layout of ladders. Starting point 1.SW model 2.Material.
Port Throttle Solution Does your port throttle drop back when you remove your hand. Here is the fix….and it costs nothing! me with any questions:
NEDM Collaboration Meeting 5/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Bonding of Flex Cable to Stave 11/10/2010 Thomas Johnson.
1. Take HV harnesses with label (IHV2) and transfer on the Stacking table. 1.1 Inspect HV harnesses visually. 2.1 Insulate HV Flex with 3M™ VHB™ Tape.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Shreveport Assembly 14 MAY, 2008.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Basic Slide Show Under Tile Spooled Heating Installation Guide.
1 ladder to sector in bond fixture HFT PIXEL 2/18/2009.
PostBase Automatic Feeder Component Removal Service Training
CANTY QUICKPORTS™ “How they work”
ATLAS pixel module assembly flow
MODEL: WC SWEEPER SCRUBBER DOCUMENTED BY: Brett Sprietler PAGE NUMBER: 1 DATE: 11/20/ Place (1) HOSE IMPELLER TO TANK ( )
For SMCM01, SMBM01 & SMZM01 Models
FIGURE 33-1 A typical fuel tank installation.
2.2 Gallon TourTank Installation
BIX In-Building Cross Connect system
Simple Way to Install Auto Lock Door in Car
Radiation Laboratory Meeting
007DCDA 2½”-3”.
Valve Manifold Assembly/Disassembly
HYBRID COOKTOP.
007DCDA 2”.
3000B 2”.
007DCDA 2½”-3”.
007DCDA 2”.
3000B 2”.
450DA 4”-10”.
709 3/4”-2”.
Presentation transcript:

Ladder assembly steps HFT PIXEL 1/04/2009 ladder fixture.SLDASM

ladder assembly with frame assembly frame full flex cable before cutting off ends

ladder exploded view cable bundle drivers kapton flex cable pixel chips adhesive composite backer adhesive wire bonds capacitors

order of assembly cable bundle drivers 7 kapton flex cable 1 pixel chips adhesive composite backer 6 adhesive 4 2 5 1 3

details of ladder sandwich, end view wire bonds Carbon composite recessed to give room for vacuum chuck backing of kapton and silicon while wire bonding capacitors adhesive extends past bonded element to avoid bulge due to adhesive pucker pixel chips soft acrylic adhesive flex kapton cable soft acrylic adhesive carbon composite ladder backing backer to sector beam adhesive

ladder assembly fixture 3/8 OD tube connection to vacuum vacuum distribution manifold vacuum release valve for hold down of the vacuum chucks ¾ ID tube connection to 1 gallon vacuum ballast tank

fixture parts (SLA) for bonding silicon chips v chuck chip.SLDPRT chip adhesive stop.SLDPRT chip stop.SLDPRT end drop chip.SLDPRT

fixture parts for bonding composite backer v chuck backer.SLDPRT backer adhesive stop.SLDPRT backer stop.SLDPRT end drop backer.SLDPRT

install chip vacuum chuck install chip vacuum chuck against stops (arrow toward arrow) open valve to vacuum lock down line.

attach chip adhesive to kapton cable install “adhesive stop” and lock down if necessary with vacuum position paper backed adhesive and pull down with 10 vacuum lines strip top backing paper position ladder and lock down with vacuum position “end pull down” and lock with vacuum work kapton down on adhesive release adhesive hold down vacuum release ladder and “end pull down” vacuum remove ladder and maybe seat adhesive with vacuum bag

install backer vacuum chuck release and remove chip vacuum chuck note: since this is an O ring seal it may be necessary to use vacuum release valve (see page 6) install backer vacuum chuck against stops (arrow toward arrow) open valve to vacuum lock down

backer adhesive to kapton cable install “adhesive stop” and lock down if necessary with vacuum position paper backed adhesive and pull down with vacuum (chp 1) strip top backing paper position ladder and lock down with vacuum position “end pull down” and lock with vacuum work kapton down on adhesive release adhesive hold down vacuum release ladder and “end pull down” vacuum remove ladder and maybe seat adhesive with vacuum bag

attach backer to kapton cable position and lock down backer stop lock down backer on vacuum chuck, may require backing tape on composite if porous strip adhesive backing paper position ladder on reference pins and pull down with vacuum position “end pull down” and lock with vacuum work kapton down on backer, must push down on chips release backer hold down vacuum release ladder and “end pull down” vacuum remove ladder and seat chips and backer with vacuum bag

attach chips to kapton cable switch to chip vacuum chuck position and lock down chip stop butt chips one at time against chip stop and neighbor chip and lock down with vacuum. strip adhesive backing paper position ladder on reference pins and pull down with vacuum position “chip end pull down” and lock with vacuum work kapton down on chips release chip hold down vacuum release ladder and “end pull down” vacuum remove ladder and seat chips and backer with vacuum bag