深圳创至博发实业有限公司 shenzhen opcsun industry co.,ltd Patch cord’s Production Flow
First step : fiber strip and kits assembling (Thread some of the connector components) 2
Second step : Thread the ferrule and inject 353nd adhesive) 3
Third step : curing and Solidify 4
Forth step : end-face cleaning 5
Fifth step : Polishing 6
Sixth step : ultrasonic cleaning 7
Seventh step : end-face checking 8
Eighth step : Circle crimping and finished assembling 8
Ninth step : Test IL and RL 10
Tenth step : Finished end-face checking 8
Last step : Package 12