School Building ready for Slab casting.. View of the Children's Home.

Slides:



Advertisements
Similar presentations
A project established by Dignity Foundation Senior Citizens Life Enrichment Services.
Advertisements

Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
St. Mary’s Hospital For Children New Patient Pavilion Progress, March – June 2011 A CAMPAIGN FOR ST. MARY’S HEALTHCARE SYSTEM FOR CHILDREN.
Select New Project from Project menu to create a new project File.
Structural System Overview
Architectural Drawing
EDT Foundation Plan Design1 Weekend Cabin Retreat Project Foundations Sacramento City College EDT 300.
EventFlat Earnest Money Deposit10 Completion of Plinth10 Completion of slab 13 Completion of slab 23 Completion of slab 33 Completion.
The line sketch with modified height for the plinth floor is displayed.
NEW TOWN HEIGHTS DLF – KAKKANAD WORK PROGRESS REPORT FOR THE MONTH OF MAY 2011 Click to proceed……..
Glenn Murcutt SRT 251 Construction and Structures Warehouse and Office complex scenario Stacy Ambelas
Design and drawing of RC Structures CV61
CAMPAN VALLEY RESIDENTIAL LAYOUT PROJECT PHOTOS-FEBRUARY 15 th 2015.
Types of Concrete Foundations. Concrete Piers Foundation This type of foundation is mostly used on buildings with post & beam style construction. It is.
SAFETY RULES ON THE ROAD
Females - 50 YO - 75 Adult Male – 375 Convicted / Remand – STP / LTP CRU All vehicular access into the establishment will come off the ASCO road. Current.
Chapter 2b Foundations Shallow & Deep Foundations.
Building the Houses Sri Lanka Tsunami Reconstruction Project in
1 University Name Brigade Report Name of Community Brigade Date Photo from Brigade.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Copyright © Texas Education Agency, All rights reserved. Architectural Design The Foundation Plan.
1 MICE PM Report Completion of Infrastructure Target, solenoids Phase Two planning & schedule Non-MICE costs Staffing & visitors Don’t have time for a.
بســـــــــــم الله الرحمن الرحيم Graduation Project 2 Presentation New Design of a Multipurpose Building Prepared By : Amjad Zidan Osama Rashad Ashraf.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Congratulations on a Great 2007 Summer Here is an update on work at the MIT Campus and an outline of urgent needs.
Homes. What is this type of home called? A bungalow. A bungalow has one floor. It does not have any stairs.
An-Najah National University Faculty of Engineering Civil Engineering Department Construction Project Management “Medical Center In Al-Daheria” Prepared.
Foundation Systems Unit 11. Types of Foundations Pilings Continuous Grade Beam.
UNT in partnership with TEA. Copyright © . All rights reserved.
Framing the House. Platform Framing Platform framing.
BCM 210 Foundation Issues- Fall 2000 refer to Allen Text
DEVIKULUM Community Hall Project Progress to Date 2-May-2011.
Remember Have a working smoke alarm Part 4. James, Jessica, Big Dragon and Tiny Dragon are playing in the bedroom.
BASICS OF UK DETAILING. BS Codes : 1) Design code: BS8110 2) Detailing codes: BS8666 BS4449.
Caretakers House Demolition Decking to STEM and ARTS.
TYPE OF STAIRS STRAIGHT-RUN STAIRSQUARTER-TURN STAIR HALF-TURN STAIR SPIRAL STAIRS WINDING STAIR CIRCULAR STAIR Building construction illustraded 4 th.
Work Progress Photos From 15 TH To 30 TH NOV 2015.
FOR APRIL 2013 THE REHABILITATION AND EXPANSION OF CENTRAL OGBIA WATER PROJECT,AT BAYELSA STATE SITE REPORT FOR NOVEMBER 2013.
UNIVERSAL M. ENTP. www. affordablehousing. ug AFFORDABLE HOUSING & MUCH MORE JAN 01 – JAN 15.
AFFORDABLE HOUSING & MUCH MORE
Tuesday 9 th January Project Status Report Project Achievements Project Schedule Issues Finance Summary Risk Register Photos.
Presentation on Eco-Tourism Development Plan at Sagar Island a part of Integrated Coastal Zone Management Project, West Bengal 20 TH MAY,2016 THE WORLD.
$200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200.
A HOUSE.
An-Najah National University
To do your best you must…
Introduction Used for covering spaces in the form of roof or floor
Table (3.1)- the averages of the 10 models costs
AARNA Progress Report-January 2017
CE # 498 بســــم الله الرحمن الرحيـــم
“Building Better for the People of the World”
CEN 180: Civil Engineering Drawing II
Graduation Project 2 Redesigning a Villa
Progress Charts.
AARNA Progress Report-June 2017
نتعارف لنتألف في التعارف تألف (( الأرواح جنود مجندة , ماتعارف منها أئتلف , وماتنافر منها اختلف )) نماذج من العبارات الايجابية.
Section and Details Vocabulary and Basic Information
Minuteman Vocational Technical Regional High School Progress
Framing the House                                                                                                                   
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Pier Foundations Piers Suspended floor Ground beam Next slide.
Homes.
Children’s Hospital Update
Concrete A structural material made by combining cement, sand, aggregate, and water.
When we make our roofs, they will need an overhang to protect people from rain and they also look cool. The overhang hangs off 1 meter long on each side.
An Najah National University
Join Us “SPRING BREAK” FRYDAY FISH DINNERS FOR
When we make our roofs, they will need an overhang to protect people from rain and they also look cool. The overhang hangs off 1 meter long on each side.
Pole Position Student Points Time
A B C D.
Presentation transcript:

School Building ready for Slab casting.

View of the Children's Home

View of the Adults Home

Staff Qtrs completed up to plinth Level, Filling in progress.

View of the Admin, Hospital Blocks

Slab Reinforcement work in progress at School Building

View of the Internal Stair Case – School; Building.

Plinth Beam Completed - Staff Qtrs

Compound Wall Footings Completed – Main Road Side

Compound Wall work in progress

Plinth Filling at Staff Qtrs.

Work progress at Hospital Block

Status of the Guest House building –

Status of the Admin Block –

Electrical Pole Crossing Staff Qtrs to be shifted,

View of the Adults Home – Columns Completed

Dining Hall work in progress

Children's Home pcc completed, ready for slab casting.