2009 The Physical Environment

Slides:



Advertisements
Similar presentations
ILSMs Eugene A. Cable, P.E. Life Safety Consultants NEHES NFPA Liaison
Advertisements

NOTICE SUBMISSIONS Requirements and Procedures 1.
Life Safety and You. Life Safety is comprised of: Codes Standards Regulations Documentation LIFE-SAFETY-Refers to the joint consideration of both the.
UNIVERSITY of NORTHERN COLORADO HOT WORK PROGRAM.
WAYNE DALTON OF SYRACUSE PRESENTS:
Biggest Pitfalls and Best Practices: Life Safety
BSA Health System, May 2009 Next Slide Previous Slide BSA HEALTH SYSTEM Infection Control during Construction, Renovation, Repairs, and Maintenance All.
Fire-Resistive Construction (2nd part)
Summary of NFPA 101 Interior Finish Requirements
FIRE DOOR INSPECTIONS NFPA 80 STANDARDS THIS STANDARD REGULATES THE INSTALLATION AND MAINTENANCE OF ASSEMBLIES AND DEVICES USED TO PROTECT OPENINGS IN.
EOC: Semi-Annual Review of DOH Survey Citations, The Top 10!
DEPARTMENT OF DEVELOPMENT SERVICES BUILDING DIVISION Ronald L. Lynn, Director/Building Official Gregory J. Franklin, Assistant Director Neil Burning, Manager.
Fire Protection Design for Healthcare Facilities: Beyond Building Code Compliance Scott Voelkerding, PE, CFPS Fire Protection Engineer September 16, 2010.
 Please mute your line to reduce background noise  Do not put us on hold if you have background music on your hold line.  At the end of the presentation.
Interim Life Safety Measures Eleven Administration Actions of Interim Life Safety Measures ÷Ensure free and unobstructed exits. Personnel receive additional.
CODE REVIEW: DOH Article 28 Compliance Establishing a Feasibility process that is focused on compliance with New York State Department of Health rules.
Michigan Department of Licensing and Regulatory Affairs Bureau of Construction Codes.
N.F.P.A. 13R Justin Bohlmann FIR-204.
Doug Hohbein Chief Plans Examiner Nebraska Fire Marshal Agency
The Life Safety Surveyor Facility Tour
January 16, 2014 Brad Keyes, CHSP Changes to the 2014 Acute Care & Critical Access Hospital Manuals on Life Safety Compliance.
How Should I Prepare for the Facility Tour?
Texas Department of Insurance State Fire Marshall’s Office Sixth Report on State University Fire Safety January 2002.
Won’t count Won’t count Another quiz, in two weeks Another quiz, in two weeks The Quiz.
FIRE DESIGN OF BUILDINGS VULNERABLE GROUPS. COMPONENTS OF FIRE building materials unattended stoves Loose electrical connections overloaded electrical.
Chapter 4: Air Leakage Control: Materials and Techniques
Presented by Edgar Furtado & David Vella FIREPLACE & FLUE REPLACEMENTS 1359 WHITE OAKS BLVD., OAKVILLE.
Child Care Fire Safety Program North Carolina Fire Prevention Code 2000 International Fire Code with NC amendments. North Carolina Building Code Council.
FPF190: Fire Protection Fundamentals FPF190 Fire Protection Fundamentals 1 Code Consultant.
2012 Medical Staff Update Laurel McCourt, M. D
2009 The Physical Environment Overview Environment of Care Emergency Management Life Safety Chapter Q & A George Mills, Sr. Engineer Standard Interpretation.
Health Facilities Planning Seminar Plan Review Division Irvin J. Poke, AIA, Chief Todd Y. Cordill, NCARB, Assistant Chief Providing for Michigan’s Safety.
Church Administrators & Emergency Planning
George Mills, Sr. Engineer Standard Interpretation Group
The ASHE advocacy highway is a two-way street of communication between ASHE and chapter advocacy liaisons The goal of the advocacy highway is to support.
Chapter 22 Selecting Interior Finishes
2009 The Physical Environment Overview Environment of Care Life Safety Chapter Emergency Management Q & A George Mills, Sr. Engineer Standard Interpretation.
The Second Survey Point of Vulnerability How Should I Prepare for the Facility Tour? Healthcare Engineering Consultants.
Building Codes and Interior Design
C A & Courtemanche & Associates HEALTHCARE SYNERGISTS.
Fire Safety By Alicia Civile and Alexandra Fernandez.
Understanding TJC 2009 Life Safety Code Chapter
MINNESOTA CHAPTER AUTOMATIC FIRE ALARM ASSOCIATION Requirements of the 2003 Minnesota State Fire Code relating to Group R Occupancies September 14, 2006.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
1 HVACR318 – Refrigeration II International Mechanical Code Relating to Refrigeration.
Engineering Analysis of NFPA 285 Tested Assemblies
© Copyright, The Joint Commission 2011 The Healthcare Environment George Mills, Sr. Engineer Standard Interpretation Group The Joint Commission.
Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.
Chapter 5 ID 234 Building Codes Fire Resistant Materials and Assemblies.
Fire-Resistant Materials & Assemblies Part 2 Chapter 5.
Maine State Fire Marshals Office1 Laws and Codes Relating to Existing Apartment occupancies in the State of Maine Mark Stevens CFI-II, CFPS, CFPE Inspections.
Part 5: Meeting the Challenge of the “EC Tracers” Healthcare Engineering Consultants How Should I Prepare for the “EC Tracer” Part of the Survey?
Jennie Sealy Hospital Patient Care Operations Orientation Click to Continue.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
COMMON DOH SURVEY CITATIONS UPDATE RANDY BENSON WHS HEALTHCARE QUALITY SERVICE JANUARY 2016.
Work Area Method Level 3 Alterations – Chapter 9 prescribes requirements. 50% of Building Area Rule.
Plumbing Radiant Heating & Cooling Turf Conditioning Permafrost Ice and Snow Melt Ecoflex ® SupportSustainabilityEngineered PolymerCommercial SystemsIntroductions.
Life Safety Compliance: Most Common Surveyor Findings Presented by Brad Keyes, CHSP Jamie Crouch, BSBM, MHA.
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
Exercise #2 (part 2) Based on what you read in Chapter 4, determine if the corridors and exit doors meet the requirements for egress width, according to.
And an update of 2012 Life Safety Code and Joint Commission Standards.
Safety Rule #1 Open flames are not allowed without first obtaining a permit. The exception to this rule is during a period of closely supervised instructions,
CODE REVIEW: DOH Article 28 Compliance
Fire Door Inspections Qualified Training
Joint Commission Updates 2018: Medical Equipment Standards
General Requirements of NFPA 101
Paul Ziaya MD Senior Director, Field Operations
Fire Alarm Practice Drill # 11 Denver Fire Department Journeyman Installer License Test © Ted Smith 2017.
Denver Fire Depart. License Fire Alarm Practice Test # 12
Presentation transcript:

2009 The Physical Environment George Mills, Sr. Engineer Standard Interpretation Group The Joint Commission

Disclaimer This presentation is current as of November 7, 2008. The Joint Commission reserves the right to change the content of the information, as appropriate. These slides are only meant to be cue points, which were expounded upon verbally by the original presenter and are not meant to be comprehensive statements of standards interpretation or represent all the content of the presentation. Thus, care should be exercised in interpreting Joint Commission requirements based solely on the content of these slides. These slides are copyrighted and may not be further used, shared or distributed without permission of the original presenter or The Joint Commission.

Life Safety Chapter

Life Safety Chapter Based on the Life Safety Code® NFPA 101-2000 Format to be consistent with NFPA CMS K-Tags reconciled Three occupancies Healthcare Ambulatory Residential Exception language accepted Annual Life Safety Assessment will occur as part of Periodic Performance Review

Life Safety Chapter Removed optional Building Maintenance Program (BMP) Standards & Elements of Performance LS.01.01.01 Administrative LS.01.02.01 Interim Life Safety Measures LS.02 - .04 LS.02 Healthcare LS.03 Ambulatory LS.04 Residential LS.04.01 < 16 Rooming & Lodging LS.04.02 > 17 Hotel & Dormitory

LS .02 .01 .34 EPs are sequentially listed Exception language accepted Life Healthcare Building Protection Fire Safety Type Alarm EPs are sequentially listed Exception language accepted Interim Life Safety Measures (ILSM) applies to LSC deficiencies Construction and non-construction

Life Safety Process Overview: When an [organization] finds that it is out of compliance with Standards LS.02.01.10 through LS.04.02.05, the hospital either resolves the deficiencies immediately or manages it through one of the following options: a maintenance management process that documents the deficiency and corrective resolution within 45 days; or a Plan For Improvement derived from the Statement of Conditions™; or a Life Safety Code Equivalency approved by The Joint Commission.

Life Safety Chapter LS.01.01.01 (Administrative) EP 3 When the hospital plans to resolve a deficiency through a Plan for Improvement (PFI), the hospital meets the time frame identified in the PFI accepted by The Joint Commission.

Life Safety Chapter LS.01.02.01 (ILSM) EP 3 The hospital has a written Interim Life Safety Measures (ILSM) policy that covers periods of construction or situations when the Life Safety Code deficiencies cannot be immediately corrected or when The Joint Commission has not granted an equivalency. The policy includes criteria for evaluating when and to what extent the hospital follows special measures to compensate for increased risk.

Fire Watch: LS.01.02.01 EP 1 The hospital notifies the fire department (or other emergency response group) and initiates a fire watch when a fire alarm or sprinkler system is out of service for 4 hours in a 24 hour period in an occupied building. Notification and fire watch times are documented. (For full text and any exceptions, refer to NFPA 101-2000 9.6.1.8 and 9.7.6.1)

Rated Barriers: LS.02.01.10 EP 3 Walls that are fire-rated for 2 hours (such as common walls between buildings and occupancy separation walls within buildings) extend from the floor slab to the floor or roof slab above and extend from exterior wall to exterior wall. (For full text and any exceptions, refer to NFPA 101-2000 8.2.2.2)

Penetrations: LS.02.01.10 EP 9 The space around pipes, conduits, bus ducts, cables, wires, air ducts, or pneumatic tubes that penetrate fire-rated walls and floors are protected with approved fire-rated material. NOTE: Polyurethane expanding foam is not an accepted fire-rated material for this purpose. (For full text and any exceptions, refer to NFPA 101-2000 8.2.3.2.4.2)

Horizontal Exits: LS.02.01.20 EP 3 Walls containing horizontal exits are fire rated for 2 or more hours, and extend from the lowest floor slab to the floor or roof slab above, and extend continuously from exterior wall to exterior wall. (See also LS.02.01.10 EP 4) (For full text and any exceptions, refer to NFPA 101-2000 7.2.4.3.1 and 8.2.2.2.)

Life Safety Chapter LS.02.01.20 The organization maintains the integrity of the means of egress EP 13 Exits, exit accesses, and exit discharges are clear of obstructions or impediments to the public way, such as clutter (for example, equipment, carts, furniture), construction material, and snow and ice. (For full text and any exceptions, refer to: NFPA 101-2000, 18/19.2.3.3.)

Vertical Openings: LS.02.01.30 EP 1 Existing vertical openings (other than exits stairs) are enclosed with 1-hour fire-rated construction. In new construction, vertical openings (other than exit stairs) are enclosed by 1-hour fire-rated walls when connecting three or fewer floors and 2-hour when connecting 4 or more floors. NOTE: these vertical openings include, but are not limited to, communicating stairs, ramps, elevator shafts, ventilation shafts, light shafts, trash chutes, linen chutes, and utility chases. (For full text and any exceptions, refer to NFPA 101-2000 18/19.3.1.1)

Corridor Walls: Existing Existing corridor partitions are fire rated for ½ hour, are continuous from the floor slab to the floor or roof slab above, extend through any concealed spaces (such as those above suspended ceilings and interstitial spaces) are properly sealed, and are constructed to limit the transfer of smoke. NOTE: Unsealed spaces 1/8 inch wide or less around pipes, conduits, ducts, and wires above the ceiling are permitted.

Corridor Walls: Existing, Cont. Note 2: in smoke compartments protected throughout with an AASS, corridor partitions are allowed to terminate at the ceiling if the ceiling is constructed to limit the passage of smoke. The passage of smoke can be limited by an exposed, suspended-grid acoustical tile ceiling. The following ceiling features also limit the passage of smoke: sprinkler piping and sprinklers that penetrate the ceiling , ducted HVAC supply & return air diffusers, speakers and recessed lighting fixtures. (For full text and any exceptions, refer to NFPA 101-2000 19.3.6.2.1 and 19.3.6.2.2)

Corridor Walls: New In new buildings, corridor walls are constructed to limit the transfer of smoke. (For full text and any exceptions, refer to NFPA 101-2000 18.3.6.2)

Hazardous Areas: LS.02.01.30 EP 2 All hazardous areas are protected by walls and doors in accordance with NFPA 18/19.3.2.1

Smoke Barriers: LS.02.01.30 EP 18 Smoke barriers extend from the floor slab to the floor or roof slab above, through any concealed spaces (such as those above suspended ceilings and interstitial spaces), and extend continuously from exterior wall to exterior wall. All penetrations are properly sealed. (For full text and any exceptions, refer to NFPA 101-2000 18/19.3.7.3)

Issue Resolution & Clarification Corridor Clutter & Other Life Safety Code Interpretations

LD.04.01.05 EP 4: What to do when the documentation isn’t there… During survey documentation is reviewed If the information is not readily available, but will be available later in the survey this may result in a finding at LD.04.01.05 EP 4 The requested information should be utilized by the organization, so not having the information may indicate a lack of responsibility by the organization If the documentation arrives late, non-compliance has already been established Scored at LD.04.01.05 EP4 Leaders hold staff accountable for their responsibilities

Corridor Clutter If the corridor looks cluttered, it probably is Carts with wheels that are not parked and forgotten (not longer than 30 minutes), but are actively used are allowed provided they are "in use" Crash Carts are always considered "in use" and allowed with staff understanding that in an emergency situation the cart is moved out of the corridor Isolation carts, located outside a occupied patient room & required would be “in use”

General Life Safety Interpretations Rated doors must have legible labels on the door and jambs Doors installed prior to 1967 may have jambs without rating labels Missing labels may be equivalized if evidence of compliance is provided to central office Alternative is to have third party testing agency re-label doors Are ILSM in place where non-compliant door assemblies are found?

General Life Safety Interpretations Fire stop: existing application is acceptable if: It was installed in a manner consistent with original design specifications It is in acceptable condition currently If the firestop is cracking, etc, then it is to be removed and repaired using current technologies JC does not accept the expanding foam used for insulation in any fire or smoke barrier This product does have a UL label, for insulation properties Easily ignited Toxic gases when burned Testing has confirmed foam alcohol based hand rub (ABHR) is equivalent to gel

Questions?

SIG Support: 630 792 5900 George Mills, MBA, FASHE, CEM, CHFM Senior Engineer SIG Jerry Gervais, CHSP, CHFM Engineer SIG Open Position Engineer SIG John Maurer CHFM, CHSP Engineer SIG

Disclaimer This presentation is current as of November 7, 2008. The Joint Commission reserves the right to change the content of the information, as appropriate. These slides are only meant to be cue points, which were expounded upon verbally by the original presenter and are not meant to be comprehensive statements of standards interpretation or represent all the content of the presentation. Thus, care should be exercised in interpreting Joint Commission requirements based solely on the content of these slides. These slides are copyrighted and may not be further used, shared or distributed without permission of the original presenter or The Joint Commission.