CBM Building and Infrastructure

Slides:



Advertisements
Similar presentations
Fire Behaviour Elements of Structure and Fire Development.
Advertisements

Radiation Doses in CBM - A first estimate and an assessment of consequences Walter F.J. Müller, GSI, Darmstadt 11 th CBM Collaboration Meeting 26 February.
A pyramid is a structure which shape is roughly that of a pyramid in the geometric sense; that is, its outer surfaces are triangular and converge to a.
1 IR Hall for GLD Oct Y. Sugimoto KEK. 2 Underground hall HybridPure CMS IR hall area (WxL)25x55 Beam height8.6 Crane max hook height20.5 Largest.
 Given: No information  Find: The Number of basketballs required to fill this classroom.
Numbers
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Construction and Installation of the CLIC Experimental Area
Building for Learning Project Photo Progress Report 6 February 2010– March 2010 Project commencement 21 st September 2009.
CBM Superconducting Dipole Magnet
J.M. Heuser — CBM Silicon Tracker 1 Johann M. Heuser, GSI Darmstadt CBM Collaboration Meeting JINR Dubna, 15 October 2008 CBMCBM Review of the first in-beam.
Under The Earth. Introduction Why Underground? Reserve is deep, uneconomical to remove the overburden Underground: All kinds of design you can imagine.
Upgraded Injector Test Facility 2015 Users Group Board of Directors Update Akers/Experimental Nuclear PhysicsJanuary 13, 2015.
Foundations. Definition of Foundation The supporting portion of a structure located below the structure and supported only by soil or rock. The purpose.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
Infrastructure for CO 2 cooling in the CBM experiment at FAIR Wolfgang Niebur and Johann M. Heuser GSI, Darmstadt, Germany for the CBM collaboration 18-Mar-2013Work.
CENF secondary beam study group 1 st meeting - 7 th May 2013 M. Calviani (EN/STI)
News on microstrip detector R&D —Quality assurance tests— Anton Lymanets, Johann Heuser 12 th CBM collaboration meeting Dubna, October
Overlap of Project X and Beamline to DUSEL June 2, 2008.
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
Status of the new Target Design n_TOF Collaboration meeting, Paris 4-5 December 2006 P. Cennini AB-ATB Status of the old Target Removal Status of the old.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
LHCb Radiation Shielding Wall – Status Wall Description Front Part 1 Aprox. 6 m Front Part 2 Aprox. 6.6 m Labyrinth.
Slide 23/ CH-NGO DRR Standard Shelter: Technical Requirements: Typhoon Resistance Resistance250 km/h sustained wind speed.
PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone 22 th November 2012 LIU-PSB.
Status of report on chapter 6: Warm cryostat mechanical calculation PH-DT Engineering Office, CERN Page 1 CERN, May 20th 2015.
Design Development Drawings 1. Code analysis: examine needed changes 2. Draw accurate existing plans/model 3. Indicate demolition 4. Indicate new wall.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
10-1 人生与责任 淮安工业园区实验学校 连芳芳 “ 自我介绍 ” “ 自我介绍 ” 儿童时期的我.
1 Building Design Progress Dan Wilcox March 2012.
1 Implementation at RAL Iouri Ivaniouchenkov on behalf of Elwyn Baynham, Tom Bradshaw, Tony Jones, Jim Rochford Engineering Department, RAL MICE Collaboration.
The target handling concept of the pbar- separator at FAIR M. Helmecke, V. Gostishchev, R. Hettinger, K. Knie 6th High Power Targetry Workshop Oxford.
Status of the FAIR pbar target: Target handling study (M. Helmecke)
KHARKOV TEAM ACTIVITIES FOR CBM WITHIN THE STCU PROJECT P602 1 Representatives: Prof. Slava Borshchov.
The Status of the CBM Experiment
– a CBM full system test-setup at GSI
GSI, for the CBM Collaboration
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
CLIC Civil Engineering Update
LBNF CAD models, Drawings and Component list
Neutrino v2.1 structural assessment
PANDA Yoke of the Magnet
New field cage LP2 Ole Bach, Bernd Beyer, Volker Prahl
East Hall under construction
Mrs. RESHMA RAJ AP/CIVIL ENGINEERING DEPARTMENT OF SCD
Yahoo Mail Customer Support Number
Most Effective Techniques to Park your Manual Transmission Car
How do Power Car Windows Ensure Occupants Safety
DO’s and DON’Ts of toilet construction
User Facilities 2016 Users Group Board of Directors Update
دانشگاه شهیدرجایی تهران
تعهدات مشتری در کنوانسیون بیع بین المللی
THANK YOU!.
بسمه تعالی کارگاه ارزشیابی پیشرفت تحصیلی
Thank you.
Thank you.
DO’s and DON’Ts of toilet construction
DO’s and DON’Ts of toilet construction
Roof design Bunker Project CDR
Neutron guide Shielding Concept
Jerzy Pietraszko, HADES at SIS100 - status GSI Darmstadt, Germany
Test Beamline System Requirements and Charge to PDR Committee
BEER cave design and shielding
Presentation transcript:

CBM Building and Infrastructure Wolfgang Niebur, GSI CBM Collaboration Meeting, 29. 2. 2008 Overview of new (since 2008) old status (before 2007) beamfocus costs

Cave+Supply building before 2007 – View in beam direction access shaft 6 × 6 m access opening 10 × 10 m

Cave before 2007 – Top view, surface level Annex building access shaft 6 X 6 m access opening 10 ×10 m

Cave 2008 – Top view, surface level Annex building access opening 6 ×10 m Roof, compacted earth

Cave 2008 – Top view into cave access opening 6 X 10 m Single wall

Cave before 2007 – Top view into cave access shaft 6 ×6 m Double wall Sandwich filling

Cave 2008 – Side view Compacted earth access opening 6 X 10 m Annex building Compacted earth Shielded area

Fair Baseline Technical Report 2006 (FBTR) Version 2 Costs Fair Baseline Technical Report 2006 (FBTR) Version 2 Building Cost FBTR 2006 is 12.78 Million Euro Cave 11,80 M€ Annex building 0,98 M€ The building cost in our Draft version as of now around 10.5 Million Euro The cost optimizations are the following: 1) The cave floor is in one level 2) The sandwich walling is obsolete 3) 1 slab/floor opening for the crane instead of 2. 4) The new opening dimension is 6m x 10 m.

Thank you for your attention.

Cave before 2007 – Side view Roof, compacted earth breakthrough 10 X 10 m

X X X X X - + - + + - Beamfocus CBM - Hades CBM-Magnet Cave wall + X - Hades-Target CBM-Magnet Cave wall Hades-Magnet Hades-Target CBM-Target - 4000 X X Beam + 6800 - 4700 12000 + 4700 - 4700 Hades-beamtime: beam pipe d 100 X 9400 + X - Hades-Target + + 1600 CBM-beamtime: beam pipe d 100 X 1600 X - Hades-Target W. Niebur 21.02.08