1 GLD Surface Assembly Y. Sugimoto KEK 2006.08.15.

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

Assembly Hall in Hybrid-A’ and ILD 2014/9/6 Yasuhiro Sugimoto 1.
1 IR Hall for GLD Oct Y. Sugimoto KEK. 2 Underground hall HybridPure CMS IR hall area (WxL)25x55 Beam height8.6 Crane max hook height20.5 Largest.
SiD assembly Marco Oriunno (SLAC), May. 14, 2014 ALCW 2014, Fermilab Infrastructures & Timeline for Hybrid Access.
“GLD” Detector Concept Study 21. Mar. Y. Sugimoto KEK.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Global Design Effort Detector concept Plenary introductory talk IRENG07 Kurt Krempetz September 17, 2007.
1 FD Support and Pacman for GLDc 27 Aug Yasuhiro Sugimoto KEK.
1 Design of Solenoid and iron yoke for GLD KEK Hiroshi Yamaoka Ken-ichi Tanaka July 13, ‘05.
Tracking Integration Challenges Y. meeting 2013/9/25.
CD meeting R.Yamada1 Thoughts on 4CD (4 th Concept Detector) Solenoid System based on Alex Mikhailchenko’s Basic Design Ryuji Yamada October 20,
1 ILD/CMS Engineering Meeting M. Joré – ILD integration philosophy Integration philosophy of ILD Matthieu Joré – January 21st Integration of the subdetectors.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Experimental hall in Japanese mountain site Y. Sugimoto 1.
October 13, 2006 Global Design Effort 1 International Linear Collider Machine Detector Interface Materials for discussion at Engineering Forum: experiences.
Detector studies, Radiation Simulations, Organization FCC Hadron Detector Meeting July 27 th 2015 W. Riegler.
Thanks to Andrei for slides October 26, 一般報告 Hitoshi Yamamoto, Oct 26, 2006.
Philip Burrows SiD Meeting, Paris 11/02/081 Machine Detector Interface Issues Philip Burrows John Adams Institute Oxford University Thanks to: Tom Markiewicz.
September 18, 2007H. J. Krebs1 SiD Collaboration One Piece End Door Design Concept plus Forward Equipment Interfaces H. James Krebs SLAC September 18,
KEK Hiroshi Yamaoka Task list for Magnet/Iron yoke Solenoid magnet Iron yoke Experimental hall and other facilities May 11, ’05.
MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt Thoughts about LDC Hall and Assembly (Work is not finished.
1 GLD and GLDc Sep. 12, 2007 Y. Sugimoto KEK. 2 Compact GLD Option Motivation –GLD and LDC will write a common LoI –The detector design should have common.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
ILD Optimization Why – when – what Ties Behnke, DESY Henri Videau, LLR.
1 BDS and Detector schedules for discussion at MDI meeting August 15, 2006 Andrei Seryi with input from Martin Gastal, Yasuhiro Sugimoto et al.
ILD Magnet & calorimeters integration meeting Questions to be addressed 01-02
Cost Issues Y.Sugimoto, A.Maki Estimation Procedure Get unit cost from the cost estimation for GLD(DOD) Estimate (relative) amount of return-yoke.
PMG Meeting February 2000 A Split Central Silicon Tracker W. E. Cooper on Behalf of the D0 Silicon Group 3 February 2000.
Aki Maki1 GLD Costing Aki Maki KEK 27/4/2006. Aki Maki2 Cost Summary 27/04/06 GLD COST SUMMARY –Solenoid Magnet**-** B JPY –Cryogenic System***** B JPY.
ILD requirement for assembly space and time 2015/11/3 Yasuhiro 1.
Status report AHCAL Mechanics Karsten Gadow CALICE Collaboration Meeting KEK, Studies of AHCAL absorber structure stability.
Strategy of detector solenoid construction Yasuhiro Sugimoto KEK 1.
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
1 ILD meeting LAL M. Joré – Integration status Matthieu Joré – 25 th of May ILD integration status and open issues.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
GLD experimental hall and detector assembly Y.Sugimoto KEK 27 Sep
Construction Schedule for Baseline and Hybrid A’ Configuration 1 5 th September, 2014 J-POWER MDI-CFS Meeting - Ichinoseki City, JAPAN.
1. Introduction 2. Magnetic field design Optimization of yoke configuration in several conf. Boundary conditions -
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
Philip Burrows MDI Panel Meeting 15/08/06 Philip Burrows John Adams Institute Oxford University SiD and IR/MDI Issues.
September 20, 2007H. J. Krebs/B. Wands/B. Cooper1 SiD Collaboration Preliminary End Door Design Concept Support of Forward Systems H. James Krebs Bob Wands.
ILD and SiD in Japanese site (from discussions in SiD/ILD E/D Interface Working Meeting) Yasuhiro Sugimoto, Marco Oriunno 2011/12/15 SiD
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
Hcal Geometry and Assembly Videoconference January 2008, 24th.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
12 July 2007IRENG07 WG-A M. Breidenbach1 SiD Concept SiD is relatively modest in scale compared to the LHC detectors, and comparable to SLD: Tracker Radius.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
An idea of ILD general assembly plan 2015/10/8 Yasuhiro Integration Meeting 1.
Kitakami Side AHCAL Assembly or anywhere in any detector.
M.Oriunno, SLAC 1 SiD installation with horizontal access shafts Marco Oriunno, SLAC SiD/ILD Engineering Meeting SLAC, December 2011.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
Experimental Hall in Mountain Regions
2016/9/30 Yasuhiro Infra/CFS mini-ws
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
The LHCb Installation Story
Experimental hall design in Japanese site
INSTALLATION SEQUENCE
Update of experimental hall in Japanese mountain site
LumiCal mechanical design, integration with LDC and laser alignment
Detector hall in mountain regions
Sub-Detector Assembly Area Summary of discussion at ALCW2015
ILD-0 overall dimensions C.Clerc ILD meeting, Seoul 17/02/09
Radiation Physics requirements for the IR
Detector hall in mountain regions
Extract from today’s talk given to DCB
as a prototype for Super c-tau factory
Presentation transcript:

1 GLD Surface Assembly Y. Sugimoto KEK

2 Outline Weight of GLD components GLD assembly scenarios Scenario 1: Assemble mostly underground Scenario 2: CMS style Scenario 3: Something between 1 and 2

3 Weight of GLD components Return Yoke Barrel (Baseline design) Leakage field < t/slab 700 t/sector(30 deg) 8300 t total 15 OKU\ (1 OKU\ ~ 0.9 M$) Barrel (Previous design) Leakage field = t/slab 540 t/sector 6500 t total 12 OKU\ Endcap (Baseline design) t/slab(180 deg) 2100 t/180 deg 4160 t/side 8300 t total 15 OKU\ Endcap (Previous design) t/slab 1500 t/180 deg 3000 t/side 6000 t total 11 OKU\ Relaxing the requirement for leakage field would reduce cost for return-yoke, exp.hall, etc.

4 Weight of GLD components Calorimeter Barrel (central) 1100 t (HCAL) 220 t (ECAL) Barrel (edge) 235 t/side 470 t total Barrel (total) 1800 t Solenoid+Cryostat 270 t Endcap 220 t/side (HCAL) 60 t/side (ECAL) 280 t/side (H+E) 560 t total

5 Barrel (central) Barrel (edge) Endcap

6 Key milestones Detector assembly building ready: t 0 +3y Detector hall ready for detector: t 0 +4y11m from Martin Gastal’s talk at VLCW2006

7 Scenario 1 If the cavern gets ready for detector at t 0 +4y11m, only 2y+1m is left before machine commissioning, which seems too short BCD assumes 80 t crane in the cavern. This is too little for GLD (M solenoid = 270 t) So, we need CCR anyway

8 Scenario 2: CMS style Surface assembly hall has 2000t non-traveling crane Detector is segmented into several large pieces < 2000t So, each segment of the detector has to crawl to the loading area by itself Then, CMS-like segmentation (divide the barrel into wheels) would be the only solution Possible problems in this method; Can we get enough mechanical precision in assembly ? Cryostat is supported only at the center. Mechanical strength to support 1800t CAL is not clear Gaps for cables between wheels  Leakage field ? Surface assembly hall gets ready at t 0 +3y. It would be impossible to assemble and test the whole detector in 1y11m.

9 Scenario 3: Our proposal Each of the surface assembly hall and the underground experimental hall is equipped with a relatively large capacity (>400t) overhead “traveling” crane Detector is assembled on surface up to few tens of segments lighter than the crane capacity. For example, Barrel Yoke + muon detector: 12(  ) x 2(r) = 24 pieces (~350t/piece) End Yoke + muon detector: 2(side) x 4(  ) x 3(z) =24 pieces (~350t/piece) Barrel CAL: 7 rings (260t/ring) Endcap CAL: 2 (side) x 2 (  ) = 4 pieces (140t/piece) Solenoid, TPC, FCAL, BCAL, and inner Si trackers are installed individually These segments are lowered to the cavern and assembled to form a complete detector

10 Comments on Scenario 3 Since muon detectors are installed in the surface assembly hall, the endcaps do not have to fully open. The wall only 12m from the beam line is acceptable. If the barrel part can move both along and normal to the beam line (probably possible by using air-pallet), the width of the experimental hall (32 m in the baseline design) can be somewhat smaller. (see next slides) Because less assembly work is done in the experimental hall than the Scenario-1, the size of the cavern could be still smaller Detailed assembly procedure will depend on the machine commissioning scenario In addition to the surface assembly hall, a large-area warehouse would be necessary to store many pre-assembled detector segments. No large-capacity crane is necessary in this warehouse if we use air-pallets to move the detector segments.

11

12

13

14 Conclusion If the cavern gets ready for detector at t 0 +4y11m, only 2y+1m is left before machine commissioning. This period seems too short to assemble the detector totally underground. We absolutely need a large assembly hall on surface It is not clear for us whether we can assemble the detector exactly like CMS or not We would like to consider the assembly scenario in which the detector is segmented into smaller pieces than that in the CMS assembly scenario In that case, we need >400t overhead traveling crane in both the surface assembly hall and the underground experimental hall In addition to the surface assembly hall, a large-area warehouse would be necessary to store the pre-assembled segments We have to investigate more to determine the necessary size of the surface assembly hall and the underground experimental hall in our assembly scenario