Site # 2007- 39 Former Motorola Facility Harvard, Illinois 900 Woodlands Parkway Vernon Hills, Illinois 60061 Office; 847-325-7030 Fax:847-325-7031 Cell:847-602-5522.

Slides:



Advertisements
Similar presentations
Project Name Location Category of Entry Award Type Firm Name 2011 CEFPI North East Region Exhibition of School Planning and Architecture.
Advertisements

Greenfield Solution Lease Solution Site Selection.
Commercial Roof Systems We shape our buildings; thereafter they shape us. -Winston Churchill.
This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over.
Concrete Fooring & Roofing System
INAR 243 FLOORS.  Structural element  Proper ground for functions.
FOUNDATIONS. Components Footings Trench Formed Keyway Stepped Fireplace.
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Glenn Murcutt SRT 251 Construction and Structures Warehouse and Office complex scenario Stacy Ambelas
Greenhouse Structural Components
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
Hawthorne Plaza 715 N. 9 th Street Salina, Kansas
American Cyber Logistics American Cyber Logistics Schneck Properties Of S.C. An overview of our facility and grounds.
Foundation Systems.
CTC 422 Design of Steel Structures
Sec 2.5 – Max/Min Problems – Business and Economics Applications
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
Planning & Community Development Department Villa Esperanza Services Master Plan September 29, 2014 City Council.
Tie-Off Points and Anchors Presented by Scott Pipicelli – HC&A.
Chapter 8: House Construction
Steel Bar Joists Tyler Wells. Academy Sports Building The building we chose is Academy Sports. It is located in Opelika Alabama. Academy is a sporting.
PERFORMANCE & CODE ANALYSIS TIMBer Inc. ·Brooke Fedder · Marie Rottschaeffer· Izzie Molinuevo· Tena Pettit·
Cindy Miller – Cindy Frey – Ridge Road Rockwall, TX
Site # Acres Bieth Property Channahon, Illinois 900 Woodlands Parkway Vernon Hills, Illinois Office; Fax:
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
1. Outline:  Introduction.  Architectural Design.  Structural Design.  Environmental Design.  Mechanical & Electrical Design.  Safety Design. 
Honda Manufacturing of Alabama Welcome Honda Manufacturing of Alabama Welcome.
Williamson County Expo Center: Site Plan Warmup Arena Renovated Arena Expo Hall and Space.
Site # Lake In The Hills Site 65 +/- Acres 900 Woodlands Parkway Vernon Hills, Illinois Office; Fax: Cell:
The Dulles Corridor 1. Wiehle Avenue 2 Joint development - Fairfax County and Comstock 3.5 acre Comstock parcel and 9.0 acre County parcel Mixed-use,
Site # Acres Hotel & Water Park Site Hoffman Estates, Illinois 900 Woodlands Parkway Vernon Hills, Illinois Office; Fax:
Site # Bartlett Site 1.8+/- Acres 900 Woodlands Parkway Vernon Hills, Illinois Office; Fax: Cell:
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
200 Minuteman Drive New Design for Additional Floors and Vibration Sensitive Equipment Brent Ellmann Structural Option Dr. Linda Hanagan - Consultant.
c One North Pavilion Ave MLS # Listed $1,500, Riverside, Burlington County, N.J Acres Cellular Leases Excluded.
Site # 2010 – 62 Antioch Pedersen 94 to 134 Acres 2440 Crabtree Lane Northbrook, Illinois Phone: Fax:
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
WEST DES MOINES LIBRARY ADDITION Team North Final Presentation Team North The Ace Mentor Program career direction for students in architecture,
Estimating and Scheduling CEE 492
Structural Systems Design of the Lincoln Fire Department Headquarters Michelle Burback Structural Engineering Capstone and Senior Honors Project.
Site # Acres Hoffman Estates, Illinois In Cooperation With Studley, Inc. 900 Woodlands Parkway Vernon Hills, Illinois Office;
M PARK AD Sofia.
An-Najah National University Faculty Of Engineering
Site # /- Acres Wauconda, Illinois
The Elastizell Advantage For Quality Low Density
Governmental Maintenance Division, Department of General Affairs
Fun Facts: James M. Bennett High School
1, sq m (20,067 sq ft) Property Highlights
An-Najah Sport Center An-Najah National University
Design of a Commercial Shopping Center
Design of Reinforced Concrete Foundations
Multistory Office Building
Redesigning of a Primary school
Integrated design Of Fuel Station
INDOOR BASEBALL / SOFTBALL FACILITY
Outline Introduction Structural Redesign Gravity System
32nd Street Apartments FOR SALE
The Bond Street Wharf Baltimore, Maryland
PERFECT DATA CENTER SPACE FOR LEASE
INDUSTRIAL / COMMERCIAL Facility For Lease
Villa Graduation Project 2 Prepared By : Abdalla Naem Dwikat
The sport hall.
Value of contract: Length of contract: Contract start date:
INDUSTRIAL BUILDING FOR LEASE
WAREHOUSE RENTALS OF GEORGIA
** No automotive uses permitted.
Manufacturing / Distribution Warehouse 4185 West 5th St
Q:\Pictures\Industrial\NWQ\Crescent IV\Crescent IV - pic for flyer.jpg
254 East Union Street Pre Development Plan Review
Finding the area of fractional side lengths
Presentation transcript:

Site # Former Motorola Facility Harvard, Illinois 900 Woodlands Parkway Vernon Hills, Illinois Office; Fax: Cell:

Former Motorola Facility Harvard, Illinois Specifications Location: Located on the east side of RT. 14 north of the City of Harvard, Illinois Land Size:325 +/- Acre County:McHenry County Pricing:$25,000,000 Total Building Size:1,547,917 Square feet 0 –Office:407,347 Gross Square feet; 245,537 Net Square Feet –Manufacturing:619,590 Gross Square Feet –Distribution:353,315 Gross Square feet; 310,535 Net Square Feet –Central Services;165,665 Gross Square feet Roof:Steel bar joist roof with 2 ¾ inch foam, tire rated, insulator ballaster and.045 inch, EPDM rubber Membrane Floors:Concrete slab on grade and concrete over metal deck on other floors. 500 LBS live load on the ground floor in the distribution building with 150 LBS live load for the mezzanine floor. Power:480/208 Volts Lighting:10’7” AFF fixture height to bottom of shade; light level 100 foot candles Nitrogen:110 PSI with 150,000 cubic foot/hour capacity. Fire Protection:Production Area OHG 3; Office Area OHG 1; Fully sprinklered Alarm System; Aux fire control panel north security guard station

9/19/2015 Former Motorola Facility Access 970 Woodlands Parkway Vernon Hills, Illinois Prepared By Thomas H Gledhill

9/19/2015 Former Motorola Facility Location 970 Woodlands Parkway Vernon Hills, Illinois Prepared By Thomas H Gledhill

9/19/2015 Former Motorola Facility 970 Woodlands Parkway Vernon Hills, Illinois Prepared By Thomas H Gledhill

9/19/2015 Former Motorola Facility 970 Woodlands Parkway Vernon Hills, Illinois Prepared By Thomas H Gledhill

9/19/2015 Former Motorola Facility Office Building 970 Woodlands Parkway Vernon Hills, Illinois Prepared By Thomas H Gledhill

9/19/2015 Former Motorola Facility Distribution Building 970 Woodlands Parkway Vernon Hills, Illinois Prepared By Thomas H Gledhill

9/19/2015 Former Motorola Facility Manufacturing Building 970 Woodlands Parkway Vernon Hills, Illinois Prepared By Thomas H Gledhill

9/19/2015 Former Motorola Facility Central Services 970 Woodlands Parkway Vernon Hills, Illinois Prepared By Thomas H Gledhill

For Further Information Please Contact Tom Gledhill Woodlands Parkway Vernon Hills, Illinois Office; Fax: Cell: