Warm-Up Rules of Engagement Office hours are in the afternoons, unless you have made other arrangements. If the door is open, I’m in the area come look.

Slides:



Advertisements
Similar presentations
Project Control: Developing the As-Planned S-Curves
Advertisements

East Hampton High School July 2013 – July 2014 Design Phases.
3/20/2003CVEN Maxwell 1 PERT – Program Evaluation & Review Technique Module: PERT Modified: February 20, 2003.
TIME MANAGEMENT 641 Topic 03 Activity Sequencing.
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
Skyscraper Construction
Chapter 14: Cost Approach. Cost Approach  The Cost Approach is most useful when:  Property is unique  Property is reasonably new and the improvements.
ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’
1 Analysis of Variance This technique is designed to test the null hypothesis that three or more group means are equal.
Improving the versatility of D.C.F. models by simple computer applications.
7 Set of Floor Plans Primary Considerations
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Chapter 2 A Strategy for the Appraisal of Public Sector Investments.
Writing Workshop Constructing your College Essay
Rocky River Design and Engineering Academy Drafting Technology Related Course Offerings Instructor: J. S. Gretsuk.
INTRODUCING THE COST APPROACH Chapter 11. Base cost Builder’s profit Building shell Building size and shape Comparative square-foot method Construction.
Proposed Alternative to the Curved Wall Concept Friends of the Orange Depot By J David Derosier 1.
© 2002 Hulett & Associates, LLC Will YOUR Project Overrun? Do a Cost Risk Analysis Presented by David T. Hulett, Ph.D. Hulett & Associates, LLC Los Angeles,
Project Control: Developing the As-Built S-Curves Part #3 June 26, 2002 Hide/Unhide Exercises.
Vladimir Liberzon Oksana Sakhraui Victoria Shavirina Spider Management Technologies, Moscow, Russia
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
Warm Up Notes What is an Assignment? What’s the objective? When is it due? How much effort? What criteria? protocol Subject: CVEN ??? ???
Dr. Godfried Williams1 Project Management – Topic 6 Lecture Content Planning Tools/Techniques Optimization Techniques Resource Planning & Allocation Linear.
Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 10 Slide 1 Unit 10 Commercial Construction.
Quantitative Research 1: Sampling and Surveys Dr N L Reynolds.
Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out Square Foot Estimating.
Forging new generations of engineers. CEA Presentations.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Chapter 46 Commercial Construction Projects. 2 Links for Chapter 46 Types of Drawings Floor Plans Elevations Site Plans.
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
4/21/2003CVEN Maxwell 1 Project Control: Control of Work and Cost Versus Time Part November 19, 2015.
BSBPMG504A Manage Project Costs 7.1 Estimate Costs Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of developing.
1 3. M ODELING U NCERTAINTY IN C ONSTRUCTION Objective: To develop an understanding of the impact of uncertainty on the performance of a project, and to.
Copyright , Dennis J. Frailey CSE7315 – Software Project Management CSE7315 M16 - Version 8.01 SMU CSE 7315 Planning and Managing a Software Project.
The Project Development Process: Setting the Context for Project Control Part #1 November 28, 2015.
A&MIS 2121W. F. Bentz A&MIS 212 – Session 2 William F. Bentz January 10, 2002 Fisher College of Business.
Property Inspection & Analysis: The Improvements
Sufficiently Complex Connection Involving Pipeline Construction and/or System Reinforcement Project Sequence.
CVE 4070 Construction Engineering HW #6 review Test-2 & Review Prof. Ralph V. Locurcio, PE.
Orlando Critical Chain as an Extension to C P M Orlando A. Moreno, PMP February,
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
Estimating and Scheduling CEE 492
CONVEYING PRIORITIES THROUGH POLICY BRIEFS This session will cover: 1.The purpose of policy briefs 2.Understanding the audience 3.Characteristics of policy.
Floor Plans Floor plans are the central or core drawings of any set of CD’s. They not only contain a tremendous amount of information for consultants and.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Session 1: Identifying Construction Drawings and Drawing Components.
The art and science of designing and construction of buildings.
Scheduling Scheduling : is the process of converting a project action plan into an operating time table. Why scheduling ? To answer the following questions:
Upon completion of this module, you will be able to:
Chapter 6 Inferences Based on a Single Sample: Estimation with Confidence Intervals Slides for Optional Sections Section 7.5 Finite Population Correction.
Estimating and Scheduling CEE 492
Project Planning & Scheduling
Construction Documents
Estimating Project Costs
Project Controls: As-Built S-Curves
Drawing Interpretation
Project Planning & Scheduling
Budget I want to plan a project by determining how much money
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Project Estimating Overview
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Commercial Construction Projects
1 Semester Project Design A Multi Story Office Building
10 The Cost Approach—Part I: Reproduction/Replacement Cost
Multi-Family Fourplex Apartment
Advancd Measurement and Contract Administration
Presentation transcript:

Warm-Up Rules of Engagement Office hours are in the afternoons, unless you have made other arrangements. If the door is open, I’m in the area come look for me – you’ll hear my voice. If the door is closed, I’m not there or I’m “not receiving” visitors (uncivil engineering, go away.) If you expect me to “multiprocess” (you interrupt me whilst I’m busy) 90% of the time you will get a rather rude, NO! If you want a YES, you should ask me when I can focus my attention on your question and give it some thought.

Successive or Parametric Estimating Module 01.2 Revised: January 16, 2003

Purpose Illustrate a technique used by many owners to establish cost and schedule estimates, to the desired level of accuracy, for large projects before detailed design is actually completed.

Learning Objectives Be able to develop sq-ft estimates on their own initiative. Be able to break complex projects into systems and sub-systems for estimating purposes. Be able to develop cost and schedule estimates to data from the R. S. Means Manual.

RAT 02.2 Take out a piece of paper, etc. Write 1 sentence on each of the following. Why is Machiavelli’s, The Prince, important reading for project managers? Part of Wednesday’s background lecture. What is the R. S. Means Manual? I asked you to look at the excerpted parts on the Web for last Wednesday.

Usual Sequence for PS&E Needs Assessment Conceptual Designs Feasibility and Fiscal Studies Selection of Design Alternative Detailed PS&E Constructor Selection Process Negotiate Construction Cost Now you finally know the Cost?

Why Is this Unsatisfactory? You are to have some idea of the cost before you can ask for or borrow the money. ?

Why Is This Technique Useful? What is the normal cost of a detailed design in percentage terms? What is the general format of a detailed design? CSI? Uniformat? When do we usually ask for the money? Before the Design? What is the impact of changes? What is the implication for Fast-Tracking and other innovative techniques?

Successive (or Parametric) Estimating Project Level: Cost/Unit Building Level: Cost/square-foot System Level: Function of Component Costs System Component Level: Function of the range of component costs “It is better to be approximately right, than to be absolutely wrong.” Warren Buffett

Typical Building System Level Components 1. Site Development: Access, Utilities, Etc. 2. Foundations: Slab, Piers, Basement 3. Structural Frame: Concrete, Steel 4. Roof: Composition, Paved 5. Exterior Walls: Brick, Precast 6. Interior: Walls, Ceilings, etc. 7. Furnishings & Movable Equipment 8. Electrical, Mechanical, Conveyances

1. Site Development Street Access Parking Utilities Landscaping ? ?

2. Foundations TAMU Standard? Other Options? ? ? ?

3. Structural Frame TAMU Standard? Other Options? ?

4.Roof System What is TAMU Standard? Other Options? ?

5. Exterior Walls Brick on Shelves – TAMU Standard Precast Panels Combination

6. Interior Walls, etc. TAMU Standard? Other Options? ?

7. Interior Furnishings & Movable Equipment Desks and Chairs Tables Laboratory Benches Computers Laboratory Equipment

8. Mechanical, Electrical, and Conveyances Plumbing HVAC Power Network Elevators Escalators

Class Exercise Assign Systems to Teams and Have Them Brainstorm Components and Alternatives Get a Brief Oral Report Back From Each

Estimate Total Cost Total: Direct System Costs: Labor, Materials and Equipment Add: The Project Indirect Costs Add: Company Wide G&A Add: Profit It not quite that easy because of construction’s inherent variability.

Each System will Vary According to the Components Most Optimistic (least cost or time) Most Probable (the most likely or mode) Most Pessimistic (largest cost or time) There will be a range of estimates for each System and/or Subsystem. That is, all of you will have a different number.

Apply some Voodoo Statistics 1.Expected or Mean Cost = (Low+4*ML+High)/6 2.Expected Variation or Risk = (High-Low)/6 Note: These are unbiased estimates for the mean (x-bar) and the standard deviation (sigma) of a near normal distribution.

How close to approximately right do we need to be? Compute the %Risk by dividing the Risk by the Mean for each system Calculate the %Mean of each System by dividing the Mean of each system by the total project cost. For each, multiply the %Risk by the %Mean to determine the Risk adjusted computation. Put more estimating effort into the large numbers to decrease the impact of variation in the estimate.

For Example Based upon this analysis, you probably want to put more effort into the foundation and exterior design.

Summary During the Alternative design stage you are looking for approximate estimates. If the cost of being wrong is high, you need to get as close as you can while expending as few resources as possible. Parametric / successive estimating is a technique for reducing risk at the early stages of the process.

Assessment Take out a piece of paper. Write 1 sentence on the “muddiest” topic on successive estimating.