COL Jerry L. 805-2052)//COL Mark Moffatt/IMNE-BEL-BRAC/(703) 805-1660/ UNCLASSIFIED.

Slides:



Advertisements
Similar presentations
1 Fairfax County Base Realignment and Closure Mark Canale Fairfax County BRAC Coordinator October 5, 2010.
Advertisements

Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
DPRI HOSPITAL & CLINIC BRIEF Executive Summary DECEMBER 2007.
FORT BELVOIR BRAC OVERVIEW
City of Petaluma Fire Station/ Headquarters Building August 30, 2006 Workshop.
Contractors Networking & Teaming Forum January 17, 2012
“To Stay a Soldier…”.
USAPHC Transition Team / /8147 U.S. Army Public Health Command Transition UNCLASSIFIED 10 February 2009 MAJ Michael Desena USAPHC (Prov) Operations.
Washtenaw County Strategic Space Plan Recommendations November 1, 2006.
USACE TEAM APG APG/C4ISR BRAC UPDATE SAME-Regional Event LTC Thomas Tickner CPT BJ Kraemer.
1 U.S. ARMY CORPS of ENGINEERS BALTIMORE DISTRICT MILITARY PROGRAM TRI-SERVICES INDUSTRY OUTREACH FORUM 5 December 2006.
JJ Kingman Rd If at Comfort, Hampton, or Hilton, use Loisdale 495 Beltway Fairfax County Pkwy Ft Belvoir Exit 166A Telegraph Road MAP #1 of Miles.
Economic Stimulus Status Report Rev. 11/24/10. Economic Stimulus Update PROGRAMPROJECTFUNDS AVAIL. TIME FRAME STATUS Community Dev. Block Grant New project:
Walter Reed National Military Medical Center Bethesda Delivering High-Quality Healthcare In a war-time environment Within the BRAC Deadline Using Design-Build.
Provide and support mission ready Arctic Warriors from America’s premier Joint Base community 673d Air Base Wing Leadership Update JBER-Richardson Housing.
Overall Office Assessment GAR RateRate Current Issues: (results of analysis) Low violent crime rates demonstrate that people living and working on Picatinny.
Milan Srskic, CCM, FHFI Acting Chief, Project Management Service Office of Construction and Facilities Management.
1 U.S. ARMY CORPS of ENGINEERS Co locate DoD Agencies, WHS BRAC Recommendation #133 Implementation at Fort Belvoir, Virginia Fort Belvoir, Virginia TRI-Service.
County Operations Center Development Project Update Department of General Services April Heinze, PE, Director Presenter: Jeff Redlitz, Project Manager.
ASU Downtown Phoenix Campus City Council February 6, 2007.
1 C4ISR Equipment Transported 277 Truckloads/ 950 Truckloads 114 Labs moved C4ISR Personnel Relocated 3787 out of 7226 filled positions at APG 3084 located.
50th Quartermaster General BG Jesse R. Cross. Fort Lee Facts Currently the Home of: Combined Arms Support Command (CASCOM) Army Logistics Management College.
Department of the Air Force
US Army Corps of Engineers Our Army at War – Relevant and Ready Fort Worth District  22 October Fort Worth District Military Construction Program.
Installation Management Update Association of Defense Communities Mr. Jonathan Hunter Deputy Chief of Staff Installation Management Command 14 January.
Base Realignment and Closure San Antonio Military Medical Center Air Force Association Briefing Col Cuda, Co-Director, San Antonio Medical BRAC Integration.
Our Mission Our Mission – Operate and maintain our installation. Provide quality installation support and services to our customers. Execute mobilization.
Kansas City District June 2009 Military Construction Briefing and Site Tour CPT Jeff Shultz Fort Leonard Wood Resident Office, Kansas City District, USACE.
1 Fort Bragg and Pope Air Force Base BRAC Regional Task Force (RTF) Community Planning for BRAC Implementation ANNUAL TASK FORCE AND QUARTERLY BOARD OF.
UNCLASSIFIED Mission and Installation Contracting Command FOUO Cathy Bella PARC February 2012 Contracts or Agreements with Municipalities.
BUILDING STRONG ® US Army Corps of Engineers – Norfolk District SAME Industry Day Richard Klein Chief, Programs Branch Norfolk District 21 October 2010.
Anne Arundel County and the Fort George G. Meade Region - Moving Forward - Creating Opportunity - Preserving Lifestyle.
APG Transformation 28 September 2007 U.S. Army Research, Development and Engineering Command Mr. David Shaffer Deputy to the Commanding General.
The Louisville Engineer District BUILDING STRONG ® Military Program Overview Louisville District Rick Lotz Chief, Fort Campbell Support Section July 31,
4/22/ :10 PM Base Realignment and Closure (BRAC) Military Department Investigative Agencies (MDIA) Co-Locate at MCB Quantico This is a recent picture.
CONSTRUCTION UPDATE Industry Market Trends FEDERAL SECTOR Who attended this event last year? Who “broke into” the Federal market in 2010? Who expanded.
Joint Base San Antonio 502d Air Base Wing 7 Nov 12 JBSA Construction Update to MTTF Mr. David Dentino Director 802d Civil Engineer Squadron.
Information Briefing Bain & Company Dewitt Community Healthcare Network Information Brief to Bain & Company 14 May 2003.
US Army Corps of Engineers Omaha District Centers of Standardization Douglas Wehring Omaha District U.S. Army Corps of Engineers Douglas Wehring Omaha.
As of Oct 08 UNCLASSIFIED G-1 FORSCOM 1 “Team Transition One Team, One Future” Headquarters FORSCOM/USARC Base Realignment and Closure Relocation.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Track 5 Project FinanceSession 6 Renewables Through Private Financing.
UNCLASSIFIED SEP07 Soldier and Family Assistance Center Briefing Colleen Tuddenham SFAC Program Manager Installation Management Command December.
Alliance Texas Small Business Fair GSA, PBS Fort Worth, TX June 26 th, 2008.
Joint Base Charleston COLONEL RICHARD D. MCCOMB
VALUE ENGINEERING FORT BLISS, TX MILCON Transformation A Strategy to Support Army Basing Initiatives Jack Shelton PE, CCE Cost Engineer/Value Engineer.
Office of the Assistant Secretary of the Army Installations and Environment Our Installations Supporting the War: Relevant and Ready “Installation Transformation.
Kansas City District Society of American Military Engineers (SAME) Fort Leonard Wood Chapter Fort Leonard Wood Chapter US Army Corps of Engineers, Kansas.
Military Construction Opportunities in the Mid-Atlantic Region Mortenson Construction 700 Meadow Lane North, Minneapolis, MN Mike Hommer – Compliance.
Seattle District MILITARY CONSTRUCTION PROGRAM
Pre-Proposal Conference July 8, 2009 Step 1 Instructions RFQ for Medical Equipment Planning.
Name/Office Symbol/(703) XXX-XXX (DSN XXX) / addressDate-Time-Group 19 September 2008 Fort Monroe Closure Environmental Planning.
Financial Management Review (FMR) Baltimore District FY16 Budgeted Expenditures LTC Mike Ruppert Deputy Commander 20 NOVEMBER 2015.
Department of Preventive Health Services Department of Preventive Health Services Medical Zoology Branch.
BOND PLANNING FIRE STATION, EMERGENCY RESPONSE, AND COMMUNITY SAFETY IMPROVEMENTS.
SAN FRANCISCO INTERNATIONAL AIRPORT CONSOLIDATED ADMINISTRATION CAMPUS SFAC Civic Design Review – Informational Overview February 8, 2016.
UNCLASSIFIED 1 Base Realignment and Closure (BRAC) Military Department Investigative Agencies (MDIA) Co-Locate at MCB Quantico.
October 28, COL John J. Strycula/IMNE-BEL-ZA/(703) (DSN 655)//COL Mark Moffatt/IMNE-BEL-BRAC/(703) / FORT.
2016 SAME Jacksonville Post Industry Day 8 Dec 2016
U.S. Forces Korea Base Relocation Program
SAME Industry Day Richard Klein BUILDING STRONG®
Air Force Construction Management
BRAC Update Colonel Jim Balocki
Dr. Vida G. Wright, P.E., F.SAME Southwest Region Vice President
CAPITAL PROGRAM OVERVIEW
Family and Morale, Welfare and Recreation Command
U.S. Army Corps of Engineers North Atlantic Division Fort Belvoir BRAC
Mentor-Protégé Program (MPP) Program Management Review (PMR)
Omnibus IV Contract Overview Elieen Emond Contract Specialist
School Building Committee – December 17, 2018 Design Development Phase
Society of Military Engineers Monthly Meeting, October 11, 2018
Presentation transcript:

COL Jerry L )//COL Mark Moffatt/IMNE-BEL-BRAC/(703) / UNCLASSIFIED 18 August FORT BELVOIR DEVELOPMENT BRIEFING FOR SOUTH FAIRFAX DEVELOPMENT CORPORATION

COL Jerry L )//COL Mark Moffatt/IMNE-BEL-BRAC/(703) / UNCLASSIFIED 18 August ~24,000 PERSONNEL (Main Post and Rivanna Station) ~7,000 RESIDENTS ~8,500 ACRES (7,700 acres Main Post; 800 acres FBNA; 29 acres Rivanna Station ) ~100 DIVERSE AGENCIES: 1 Major U.S. Army Command Headquarters, 10 U.S. Army Commands, 19 Agencies and reporting units of the D.A. 8 elements of U.S. Army Reserve and Army National Guard 26 DoD Agencies Davison Army Airfield ORGANIZED INTO 9 FUNCTIONAL AREAS: Humphreys Engineer Center (HEC): 600 acre post Upper North Post: home of major DoD Agencies, 1,930 acres Davison Army Airfield: fixed and rotary aircraft, 800 acres Lower North Post: barracks & Reserve training, 320 acres Fort Belvoir North Area (FBNA): home of NGA, 800 acres Southwest Area: training area/ranges, 2,100 acres South Post: admin, Hospital & Town Center, 2,550 acres South Post Core: FB historic district, 100 acres Sub-installation: Rivanna Station, 29 acres Fort Belvoir Functional Area Map WHERE WE ARE TODAY

COL Jerry L )//COL Mark Moffatt/IMNE-BEL-BRAC/(703) / UNCLASSIFIED 18 August Planning Accomplishments: BRAC is implemented Buildings are modernized PX & Commissary upgraded Recreation master plan implemented Major on and off post roads improved Town Center realized 44,100 PERSONNEL (Main Post, FBNA, Mark Center, Rivanna Station) 9,000 RESIDENTS ~8,600 ACRES (7,700 acres Main Post; 800 acres FBNA; 16 acres Mark Center, 76 acres Rivanna Station) ~160 Diverse Agencies INCOMING: ▫ BRAC projects: NGA, Army Lease, Community Hospital, Dental Clinic, NARMC, MDA, PEO-EIS, WHS (Mark Center), JUIAF (Rivanna Station), Infrastructure ▫ BRAC-related projects: Emergency Services Center (FBNA), USANCA, South Post CDC, ACP upgrade ▫ New Missions: Warrior Transition (WT), National Museum of the U.S. Army, Office of the Chief of Army Reserves (OCAR), Family Travel Camp, Medical Guest House ▫ DD 1391 Programmed Projects: North Post CDC, Expand and replace Commissary & PX, South Post Fire Station Replacement, Museum Support Center, SCIF, Flight Control Tower, modernize barracks WHERE WE ARE GOING: BRAC AND PROGRAMMED PROJECTS Over 150 projects within BRAC timeframe

COL Jerry L )//COL Mark Moffatt/IMNE-BEL-BRAC/(703) / UNCLASSIFIED 18 August Net Gain ~19,300 -Main Post: ~3400 -FBNA: ~8500 -Mark Center: ~6400 -Rivanna Station: ~1000 (Main Post Current: ~23,000 ) INCOMING OUTGOING  Soldier’s Mag (~20)  DLA Mgt Ctrl (~20)  Army Lease (~2800) 21,517 2,140  WHS Center )  JUIAF – DIA Rivanna Station)  FBCH (~2050)  DTRA, AR (~21)  Prime Power School (~100)  Seabees (~16)  CID (~130)  C4ISR Elements (~400)  AMC/USASAC (~1440)  HQ MDA (~292)  PEO EIS (~400)  NGA FBNA)  DTRA, CB (~50) AGENCY TIMELINES

COL Jerry L )//COL Mark Moffatt/IMNE-BEL-BRAC/(703) / UNCLASSIFIED FORT BELVOIR COMMUNITY HOSPITAL HOSPITAL CAMPUS 18 August

COL Jerry L )//COL Mark Moffatt/IMNE-BEL-BRAC/(703) / UNCLASSIFIED 18 August Warrior Transition Complex Community Hospital North Atlantic Region Medical Command (NARMC) Dental Clinic Screen shot from 4D model showing Medical Campus at full build-out. Child Development Center Ambulance Shelter Central Utility Plant (CUP) (Hospital) Helipad Gunston Road Belvoir Road 6 th Street Route 1 9 th Street MEDICAL CAMPUS OVERVIEW,

COL Jerry L )//COL Mark Moffatt/IMNE-BEL-BRAC/(703) / UNCLASSIFIED 18 August SCOPE: 1.275M SF hospital complex with 120 inpatient beds, clinics, central energy plant, helipad, and 3500 parking spaces PERSONNEL: 3,200 (2,069 new; 1,131 currently at DeWitt Community Hospital) MILCON PROGRAMMED AMOUNT: $806.9M BRAC FY07-10 CONSTRUCTION AGENT: Norfolk District CONTRACT: Awarded to Turner-Gilbane (Integrated Design-Bid- Build) STATUS: ▫ Erecting steel for Clinics A, B, C, D and E ▫ Design 100% complete; construction 36% complete MILESTONES: ▫ Tracking toward final major slab placements in both garages NLT end of JUL 09 ▫ Clinic Transitions begin AUG 10 ▫ Construction complete 31 MAR 11 ▫ Initial Operating Capability APR 11 E (Meadows Pavilion) D (Sunrise Pavilion) C (Oak Pavilion) B (Eagle Pavilion) A (River Pavilion) FBCH (BRAC 169) PROJECT PROFILE 14 AUG 09

COL Jerry L )//COL Mark Moffatt/IMNE-BEL-BRAC/(703) / UNCLASSIFIED 18 August FORT BELVOIR COMMUNITY HOSPITAL (BRAC 169) CONSTRUCTION 14 APR AUG 09

COL Jerry L )//COL Mark Moffatt/IMNE-BEL-BRAC/(703) / UNCLASSIFIED 18 August SCOPE: Two 4-story barracks (194.4K SF total) buildings with various room configurations for wounded warriors; 30.7K SF Company HQ, 8K SF Battalion HQ, 15K SF Soldier and Family Assistance Center (SFAC). PERSONNEL: Complex supports 412 total troops; Facility supports 276 wounded warriors and 130 administrative staff MILCON PROGRAMMED AMOUNT: $76M FY09 (Supplemental – 12 DEC 08 Directive; PA increased 6 MAR 09) CONSTRUCTION AGENT: Baltimore District (Site Development) ▫ Fort Worth District is Center of Standardization (COS) (Design-Build) CONTRACT: Design-Build to be awarded under 2 Multiple Award Task Order Contracts (MATOC) STATUS: ▫ Design-Build RFP 100% ▫ Re-designated as FY09 Supplemental Project ▫ 30-day public review period of EA began 23 JUL 09 ▫ Solicitation posted 30 JUN 09 MILESTONES: ▫ Target award DB contract 15 SEP 09 ▫ Beneficial occupancy date (BOD) 15 JUL 11 PERCENT COMPLETE: 0% WARRIOR TRANSITION COMPLEX (BRAC-Related – Hospital)

COL Jerry L )//COL Mark Moffatt/IMNE-BEL-BRAC/(703) / UNCLASSIFIED 18 August Screen shot from 4D model showing Warrior in Transition Complex at full build-out Vernondale Village Housing Area South Side Grill (existing) Belvoir Road 9 th Street 138 PN BarracksHospital Bldgs. D & E Hospital Bldgs. C, D & E Hospital South Garage 138 PN Barracks 6 th Street WT Admin HQ Soldier and Family Assistance Center (SFAC) WARRIOR TRANSITION COMPLEX (BRAC-Related – Hospital)

COL Jerry L )//COL Mark Moffatt/IMNE-BEL-BRAC/(703) / UNCLASSIFIED OTHER BRAC PROJECTS UPDATE ON OTHER BRAC AND BRAC RELATED PROJECTS 18 August

COL Jerry L )//COL Mark Moffatt/IMNE-BEL-BRAC/(703) / UNCLASSIFIED 18 August SCOPE: 99K SF multi-story highly secure headquarters facility, with surface parking PERSONNEL: 292 MILCON PROGRAMMED AMOUNT: $37.8M BRAC FY08 CONSTRUCTION AGENT: Baltimore District CONTRACT: $33M awarded to Foulger-Pratt (Design-Build) 18 AUG 08 STATUS: ▫ Construction 7% complete MILESTONES: ▫ Begin vertical construction JUL 09 ▫ Beneficial occupancy date (BOD) 8 JUN 10 PERCENT COMPLETE: Construction 7% MISSILE DEFENSE AGENCY (BRAC 134) PROJECT PROFILE

COL Jerry L )//COL Mark Moffatt/IMNE-BEL-BRAC/(703) / UNCLASSIFIED 18 August MILESTONES: ▫ Garage construction complete 30 JUL 10 ▫ Main Building occupation—South Wing JAN 11 ▫ All construction complete APR 11 ▫ North Wing occupation MAY 11 PERCENT COMPLETE: ▫ Design 90%; Overall Construction 25% ▫ Overall Site/Civil completion ~38% ▫ Main Building construction 32% ▫ Tech Center construction 98% ▫ CUP construction 98% PERCENT COMPLETE (Continued): ▫ Garage completion 45% ▫ Remote Inspection Facility 0% ▫ Visitor Control Center 0% SCOPE: 2.41M sq. ft. office with SCIF, tech center, utility plant, visitor control center, structured parking for 5,100 vehicles, and remote inspection facility PERSONNEL: 8,500 MILCON PROGRAMMED AMOUNT: $1.7B CONSTRUCTION AGENT: Baltimore District CONTRACT: Awarded to Clark, Balfour Beatty (Integrated Design-Bid-Build) STATUS: Fast tracked and on schedule ▫ Groundbreaking SEP 07 ▫ First Operational Building Ceremony 10 JUL 09 ▫ See “Percent Complete” data NGA (BRAC 168) PROJECT PROFILE “Know the Earth…Show the Way” 4 AUG 09

COL Jerry L )//COL Mark Moffatt/IMNE-BEL-BRAC/(703) / UNCLASSIFIED 18 August NGA (BRAC 168) CONSTRUCTION 4 AUG 09

COL Jerry L )//COL Mark Moffatt/IMNE-BEL-BRAC/(703) / UNCLASSIFIED 18 August PHASE I PHASE II PHASE III Stimulus funded PHASE IV Stimulus funded OPTION 1 DAR 2009 BRAC Infrastructure OPTION 1 DAR 2009 OPTION 2 I-95 HOV Access DAR 2010 FORT BELVOIR NORTH AREA FAIRFAX COUNTY PARKWAY & I-95 HOV ACCESS CONSTRUCTION PHASING