UNE to SPA Access Project Management October 10, 2005.

Slides:



Advertisements
Similar presentations
Position Title: Band: Location: Reports to: Supervises: Sales Manager / Regional Sales Manager AVP On Site General Manager, Sales Job overview Achieve.
Advertisements

Warehouse Management Module Overview Volunteer Users.
Consumer Easy Access Sales Environment (CEASE) For Competitive Local Exchange Carriers.
REO AssetTracker REO Assistant Broker Role v1.0 MaximLogic LLC.
Customer Billing Education Package Mileage Calculations DS0, DS1, LightGate® Service, SMARTRing® Service, Switched.
Concluding FFELP Originations – TG guarantee processing and products.
Electronic Muster and Measurement System (eMMS) Towards transparency and accountability at work site.
17 th Training Wing I n t e g r i t y - S e r v i c e - E x c e l l e n c e Contract Closeout Train and deploy the world’s foremost combat ready Intelligence,
Information Analysis Centers (IACs)
Internet Applications Update Internet Rechartering August 26, 2009.
Brief on process flow in project Udaan. 1 Brief overview of this document Project Udaan was designed to improve the sales of broadband and landline for.
11 ASN (RNET 3B2) Implementation Package Saufi Bukhari Systems Analyst June 20, 2012.
Bona Fide Request and New Business Request Definitions.
SRC Application Process Fall 2014 Version: November 12, 2014.
Issue Date: 01/03 1 Cancellation Charges Customer Billing Education Package.
Process Management and Control and Physical Inventory SAP Implementation
Course Technology Chapter 3: Project Integration Management.
Roles of IT Personnel Unit Customer Service This is a facility that helps customers with wide-ranging questions relating to a specific company,
Delivering a Planning Services Engagement Software Assurance Planning Services.
Issue Date: 07/03 1 Customer Billing Education Package Access Service Improvement Plan.
© 2008 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Access online tools Place.
N A managed approach to planning and controlling the implementation of complex application software. n A flexible tool kit, designed to support the Project.
OSS Reconciliation Billing December 2004 Project Operation Support System (OSS) Cost Recovery Billing TOMMY WILLIAMS, SR. PRODUCT MANAGER TITANIA ALEXANDER,
HCL CONFIDENTIAL 1 Smart Engineer Review Date: 12 th July, 2005.
Copyright Course Technology 1999
Session 68 LaRS Review Session Martha Shine Angela Baker.
University of Southern California Enterprise Wide Information Systems Manufacturing Planning and Execution (cont.) Instructor: Richard W. Vawter.
Campus Solutions Self Service: Students. The Student Center Enrollment Weekly Schedule Account Inquiry Holds Meningitis Acknowledgement Form Addresses.
Page - 1 Agenda  MFMP Overview  System Basics  Exploring Catalogs  Creating a Requisition  Following Up On Your Order  Receiving Commodities  Invoice.
Date: 07/20/2011 HCSIS, Independent Monitoring for Quality (IM4Q) - Considerations.
© 2008 Cisco Systems, Inc. All rights reserved.Cisco Confidential 1 KTN106 – KTN Account Team / Partner Presentation_ v1.1.ppt KTN Preparation for Account.
Session 5 Integrating CLAS Into Policy and Practice CLAS Training [ADD DATE] [ADD PRESENTER NAME] [ADD ORGANIZATION NAME]
CLEC CARE Customer Education Package Carrier Notification —Special Construction Issue date 9/30/2004 Vol. 2 © 2004 BellSouth Telecommunications, Inc. All.
Water Services Trust Fund Financial Support for Improved Access to Water and Sanitation Implementation of UPC Projects 1.
From Registration to Accounts Receivable – The Whole Can of Worms 2007 UBO/UBU Conference 1 Briefing:The Standard Insurance Table – Case Studies Date:20.
June 25-26, 2002D&D Lessons Learned Workshop1 Overview of the TFTR D&D Project Erik D. Perry D&D Lessons Learned Workshop June 25-26, 2002 PPPL.
Oncor Electric Delivery October 2010 Oncor’s 500 In-Home Monitor Program.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
Software Project Management
Shipperless & Unregistered site working group Recommendations to address the Unregistered Sites Collectively establish & execute activities to correct.
VOLUNTEER MANAGEMENT SITE VISIT DATE The Leadership Development and Strategic HR Practice Area is presented by American Express. This Service Grant design.
INFORMATION MANAGEMENT Unit 2 SO 4 Explain the advantages of using a database approach compared to using traditional file processing; Advantages including.
Life Cycle of an Order Copyright 2002 New Edge Networks. All rights reserved.
Issue Date: 11/03 Customer Billing Education Package Switched Transport and Transmission.
Issue Date: 01/03 1 Service Installation Guarantee Customer Education Billing Package.
© 2010 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. In most cases, the information.
Systems Accreditation Berkeley County School District School Facilitator Training October 7, 2014 Dr. Rodney Thompson Superintendent.
1 Chapter 1 Introduction to Accounting Information Systems Chapter 10 The Order Entry/Sales (OE/S) Process.
Direct Loans: Balancing the Books for and Beyond Isiah Dupree Wendy Jerreld Session 6.
Unit 17: SDLC. Systems Development Life Cycle Five Major Phases Plus Documentation throughout Plus Evaluation…
CUSTOMER ORDERING QUICK REFERENCE GUIDE November 9, 2015.
© 2015 CenturyLink, Inc. All Rights Reserved. Wholesale Service Management Repair Guidelines 1 CenturyLink Operational Information-For use by CenturyLink.
QC – User Interface QUALITY CENTER. QC – Testing Process QC testing process includes four phases: Specifying Requirements Specifying Requirements Planning.
Step 1 Lead Notifications Dear Partner, New leads have been assigned to your organization based on customer preference and are available for you.
FY17 TRAINING NEEDS ASSESSMENT OVERVIEW For the Customer Liaison/Training Point of Contact.
CallTower Implementation Process Overview
William V. Richardson Jr. and John T. Barrera
Wholesale System Simplification Ordering Impacts
Water Services Trust Fund Financial Support for Improved Access to Water and Sanitation Implementation of UPC Projects & the Roles and Responsibilities.
TELECOM SERVICES Allison Strang
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Guidance notes for Project Manager
By Jeff Burklo, Director
Our Wireless Enterprise Help Desk (WEHD) is here to assist you 24 hours a day, 7 days a week, 365 days a year. We also have our own private number.
Serving Area Process ACACSO Conference May 10, 2018
Business Acquisition An Introduction into Processes and Tools
Kickoff Presentation Date
Business Planning Meeting Periodic Business Review
Presentation transcript:

UNE to SPA Access Project Management October 10, 2005

Interconnection Services 2 UNE to SPA Access Project Management Overview The purpose of this overview is to familiarize customers with Access Project Management’s role and the process flow to convert circuits from Unbundled Network Elements (UNE) to Special Access (SPA) during “no physical work required” conversions.

Interconnection Services 3 UNE to SPA Access Project Management Overview cont. Access Project Management Assists customers during the UNE to SPA conversion 15 or more circuits will qualify for Project Management assistance Oversees the entire order flow Provides status feedback to customer Negotiates project quantities and timelines

Interconnection Services 4 Project Flow Each project will include 4 project stages Planning Initiation Execution Closeout

Interconnection Services 5 Project Planning Customer provides circuit conversion list to BellSouth CLEC Care Local Support Network Sales Engineer CLEC Care provides circuit conversion list to Project Management Circuit conversion list must remain unchanged throughout the project (no additions)

Interconnection Services 6 Project Planning cont. Account Team, CLEC Care, Project Manager, and Customer Conduct Scope call Review list of circuits Do we want to reuse the serial ID? Example: 22.HCFU SB to 22.HCGS SB Advise of unique requirements Define Project Scope

Interconnection Services 7 Project Initiation Project Manager Builds Project Package Conducts Kickoff call Introduces project to BellSouth internal team Negotiates quantities and timelines Advises team of unique project requirements Confirms project

Interconnection Services 8 Project Execution DS0/DS1 ICSC (Interexchange Carrier Service Center) Builds Master ASR Project Manager Builds spreadsheet Sends spreadsheet to PTOPS (Project TASKMATE Order Processing System) Advises PTOPS to reuse or not reuse the serial ID

Interconnection Services 9 Project Execution cont. PTOPS Issues (1) disconnect and (1) add order per circuit ICS Mechanization Monitors for order design If designed, the program deletes work steps to ensure circuit is not taken down by a field technician Creates a records only work step to update the Central Office (CO) design records

Interconnection Services 10 Project Execution cont. DS0/DS1 ICSC Clears fallout from PTOPS Project Manager Updates customer and team with the orders and due dates (Customer will not receive a FOC when using PTOPS. The project spreadsheet will act as the FOC.)

Interconnection Services 11 Project Execution cont. CPG (Circuit Provisioning Group) Designs the disconnect order Designs the add order ACAC (Access Customer Advocate Center) Ensures work steps are canceled Verifies designs (ensures the add order reuses the disconnect design) Completes the add order on due date (DD) CWINS (Customer Wholesale Interconnection Network Services Center) Completes the disconnect order on DD + 1

Interconnection Services 12 Project Closeout Project Manager Ensures all orders complete and purge to billing Sends Project Closeout to Customer and Team

Interconnection Services 13 Project Execution (DS3) DS3 PTOPS does not issue the service orders ICSC Issues orders from spreadsheet WMC (Work Management Center) Deletes work steps to field

Interconnection Services 14 UNE to SPA Project Summary Same overall flow for DS0/DS1 and DS3 Planning Initiation Execution Closeout

Interconnection Services 15 DS0/DS1 vs. DS3 Project Flow DS0/DS1 uses mechanization to issue the orders DS0/DS1 uses mechanization to delete the work steps DS0/DS1 Adds are auto-test eligible (BellSouth will load the Project ID into the testing platform to ensure auto-testing is not performed) UNE to SPA Project Summary cont.