Powering Group of Circuit Doubts and proposals of the procedure reviewing team (Gianluigi, Rob, Sandrine, Matteo, Boris) Ref document: LHC-MPP-HCP-071.

Slides:



Advertisements
Similar presentations
6 th April 2010 MP3 weekly summary – issues and follow-up 0v1 M. Zerlauth for the MP3-CCC shift crew.
Advertisements

MP3 report – week 17 19/4/2010 – 25/04/ interventions MP3/QPS team in CCC Monday Morning Meeting : 26th of April 2010.
Frédérick BORDRY – LHCMAC 22- 6th December 2007 Review of the experience of LHC powering: short-circuit tests and sector 7-8 and start of powering sector.
1 Powering Tests and Safety Electrical Safety Hugues Thiesen Power Converter Group.
New HV test specification for the LHC N. Catalan for the EI section.
TE/MPE/MI OP section meeting 29 th September 2009 HCC 2009 Frequently Asked Questions 0v1 M. Zerlauth.
REVIEW OF THE CRYOGENIC BY-PASS FOR THE LHC DS COLLIMATORS ELECTRICAL CIRCUIT MODIFICATION, INCLUDING OPERATIONAL CONSIDERATIONS PRESENTED BY A. SIEMKO.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
MP3 report : W49 (6 slides, 6’) J.Ph Tock for the MP3 team Since oral report last week (24 th of November) 1JPhT – LMC 1st of December 2010.
LARP Collaboration April 26 th 2006 The Commissioning of the Technical Systems of LHC 1.The final validation that all the collider components/systems.
02/09/2010 Access conditions for test of the RB.A23 at 17:30. Splice mapping. Complete machine closed by ~18:00.Problems in getting TI2 ready for injection.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
Powering of the Superconducting Circuits: Procedures and Strategies for Circuit Validation Antonio Vergara on behalf of the Hardware Commissioning Coordination.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
AT-MEL, CERN, 1211 Geneva 23 R.Wolf-LHCCWG Magnet Setup Cycling for LHC R. Wolf for the FQWG et al. Contents -Overview -Details of individual cycles.
HC Review F. Rodriguez-Mateos Powering tests The outcome of the work conducted within HCWG and many discussions among colleagues.
MP3 recommendations from June 2013-Feb 2014 Arjan Verweij on behalf of the MP A. Verweij, LSC meeting 7/2/2014 One of the tasks of the MP3 is.
Recent cross-wiring issue and implication for circuits protection Bozhidar Panev TE-MPE-CP
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
LHC machine status ~ Daily Summary ~ Daily beam commissioning meeting Week 42 - October 14 th, 2015 CERN, Geneva, CH M. Lamont and S. Redaelli for the.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
MP3 List of main Issues during March 2010 MP3 - Team.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automated analysis of Powering Events – Progress update.
OVERVIEW OF THE NEW FEATURES PVSS SCADA SYSTEMS USED DURING HCC MP3 - Frédéric BERNARD.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
MPP Workshop Status of Powering Interlocks I. Romera on behalf of MPE-MS MPP Workshop, 12 June 2015, I. Romera (TE-MPE)1.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
TE-MPE –EI, TE - MPE - TM 8/12/2011, Antonopoulou Evelina RQS circuit Simulation results Antonopoulou Evelina December 2011 Thanks to E. Ravaioli.
An invitation to an open discussion We are team reviewing its performance globally We want to help each other to reach the objectives We know the other.
CSCM (Thermal Amplifier) Sequence and detailed planning 07/10/2011 M.Solfaroli Thanks to: K.Brodzinski, G.D’Angelo, M.Koratzinos, M.Pojer, R.Schmidt, J.Steckert,
AB-CO Review September Session on circuit commissioning Session on circuit commissioning Post-Mortem requirements F. Rodríguez-Mateos on behalf.
TE-MPE-CP, RD, 28-Sep Problems with QPS DAQ Systems During LHC Operation, 1 st Results from 2010 CNRAD Tests R. Denz TE-MPE-CP.
PGC tests Test procedure and acceptance criteria for the Powering of Group of Circuits EDMS No
Machine Protection Review, Markus Zerlauth, 12 th April Magnet powering system and beam dump requests Markus Zerlauth, AB-CO-IN.
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
Powering LHC magnets version 30/3/2007.
Markus, Mathieu, Enrique, Rudiger, Serge
Powering the LHC Magnets
Status of Magnet Setup Cycling for LHC
Powering from short circuit tests up to nominal
Powering Interlocks Quench back of corrector magnets vs revised ‘Global Powering Subsector OFF’ functionality M.Zerlauth, W.Venturini, R.Wolf, G.Kirby.
Detailed global view on protection and detection of the circuits
Rüdiger Schmidt and Karl Hubert Mess
Summary of Week 11: 14 – 21 March
Machine Protection Xu Hongliang.
+ many slides from various colleagues (KH, Rudiger, Paul, …)
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
(damaged board on RQD/F)
M. Zerlauth, I. Romera 0v1.
Week 35 – Technical Stop and Restart
(1 test missing on RQD/F)
LHC Morning Meeting - G. Arduini
Monday 08:30 – 11:00 Access for: LBDS beam 2 problems: TSU unit changed RQTD.A67B1: controller for the current lead heater changed RQS.A67B1 power converter.
Brief report of the hardware commissioning activities
Friday 15th February - morning
RAMP FOR COLLIMATOR SETUP
Review of hardware commissioning
Presentation transcript:

Powering Group of Circuit Doubts and proposals of the procedure reviewing team (Gianluigi, Rob, Sandrine, Matteo, Boris) Ref document: LHC-MPP-HCP-071

PGC.1 Study the electromagnetic coupling between circuits, devoting special attention to the QPS detectors. This group of tests is done at powering subsector level. PGC.2 Validation the performance of the DFB and current leads when all the circuits of one DFB are powered as well as the long term behaviour, at sector level, by using an overall current profile representative of a machine operation configuration. It is also a last check of the superconducting splices. – The PGC1 and PGC2 tests should be performed with all the circuits ramping at the acceleration and ramp rates achieved during the commissioning. These will possibly match the nominal acceleration and ramp rates. PGC.3 Validation the squeeze functions of the machine. PGC.4 Final machine validation by powering all sectors in unison Powering Group of Circuit

PGC1 for the ARC of the : GPM inj On RB,RQD/F,IPQ 2: Nom 3: Int. 4: Nom 5: EMC during flat top 6: EMC during ramp 7: SPA on RQs 8: Loss of Cryo Maintain

The functionalities are checked in the PIC2 tests. The link Cryo-Maintain/PIC is checked in PIC2 for each circuit Proposal: skip because redundant. PGC1: Arc- PIC functionalities 1: GPM inj On RB,RQD/F,IPQ 9: Loss of Cryo Maintain

PGC1: Arc – Cycle at nominal This test is performed in order to verify any electromagnetic coupling among circuits. The list of QPS that triggered should be determined and the QPS signals should be verified in order to understand whether a quench occurred. Is it necessary to do it taken into account that the following tests should allow to verify that as well.

PGC1: Arc - Interm. and Nom 3: Int. 4: Nom 4: Provoked quench on a RB

PGC1: ARC – EMC for 600A EMC among 600A or 600A vs. mains? Do we really need to do 2 different tests? Shall we keep only the most conservative? (2 nd ) Once (If) an EMC is found, which are the actions to be taken? Triggering sequence (Rob): – determined by the current decay rate at fast power abort – 600A circuits divided into two groups as N-line correctors or spool pieces. 5: EMC during flat top 6: EMC during ramp Trigger Seq GroupCircuitQuench expected Initial decay rate (A/s) 1Spool piecesRCSNo3400 2RCOmaybe350 3RCDmaybe13.5 kA/s 1N lineRQTL11No200 2RQS (2-magnets)No450 3RQTL9 (in 3 and 7)No (?)600 4RQT12,13No770 5RSF1/2, RSD1/2Yes RQTD/FYes1200 7RSSYes1275 8RQSYes1900 9RO D/FNo kA/s

What is the aim of this test? PC functionalities test? why do we do this test for RQs and not for the RB? Done by removing the permit to powering PGC1: ARC - SPA on RQ 7: SPA on RQs

PGC1: Matching Sec 2: FPA in a Separation dipole 3: SPA in a IPQ 1: Nominal 4: Loss of Cryo Maintain

do we need it? – DFB circuit coupling checked in the following step (FPA) – DFB Heat Load test? Also in the next…or even in PGC3 (squeezing tests) PGC1: MS – Cycle at nominal 1: Nominal

The fast power abort of the superconducting dipole will produce a fast power abort of all the circuits in the corresponding powering sub-sector. – Test performed to verify the correct operation of the GPM? These tests are likely no more necessary because there is already a test at 0/I_min_op current during the PIC Global protection mechanism test during the HW commissioning of each circuit – Verification of the electromagnetic coupling among the circuits sharing the same DFB?. The list of QPS that triggered should be determined and the QPS signals should be verified in order to understand whether a quench occurred. How many circuits can be coupled? PGC1: MS – FPA on IPD 2: FPA in a Separation dipole

To be performed in the matching sections containing cryostats that have several main circuits fed by a DFB. These are those fed from a DFBL (it is considered that they belong to the same cryostat) or by a DFBM that contain more than one main circuit (e.g. D2Q4 or D4Q5 cryostats). However all the circuits of the matching section are included in the test. The circuit going through the slow abort has to be specified for each matching section. In case it is a MQM/MQY circuit, the power permit must be removed only in one of the converters leaving the other ON. Why that? Do we need such test? List of parameters to be recorded: The list of QPS trips PGC1: MS – SPA on a IPQ 3: SPA in a IPQ

As for the arc… PGC1: MS – Loss of cryo maintain 4: Loss of Cryo Maintain

The second step is no more needed The ramp down after the last step should be performed in steps with 2-3 plateaus. PGC2: all the circuits Obsolete

PGC3 and PGC4 ABP working on it (S. Fartoukh and M. Giovannozzi) – first draft in within following weeks.

Once upon a time there was a MTF step/field called MPP OK for each circuit which, once filled as “ok”, determined the start of the powering test of that circuit. Those MTF field are still there, but largest part empty. Accessing MTF is heavy if done per circuit! This year: MP3_OK sequence requiring an MP3 expert signature and an automatic fill of MTF field. AOB: MP3 OK for powering