MOIMS Reportp. 1 Digital Repository Audit and Certification BOF Goal  Obtain CCSDS / ISO approval of a standard that establishes the criteria that a repository.

Slides:



Advertisements
Similar presentations
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Advertisements

Auditing Digital Repositories : An Update on Standards, Preservation, and Usage Center for Research Libraries January 21, 2012.
International Audit and Certification of Digital Repositories PV 2009 David Giaretta.
Co-funded by the European Union under FP7-ICT aparsen.eu #APARSEN Audit & Certification: an auditors perspective Barbara Sierman, KB National Library.
05-October-2007 Heppenheim,DLR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 05 October 2007.
09-Dec Toulouse,FR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, END of Sprint 2006 Meeting Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 20.
Certification of Trustworthy Digital Repositories Arnold Rots Harvard-Smithsonian CfA.
Repository audit and risk profiles: trust through transparency
By Eileen Clegg Digital Preservation at Columbia in the Old Days (2009)
ISO Process for Audit and Certification of Digital Repositories Partnerships in Innovation II: From Vision to Reality and Beyond STANDARDS AND POLICIES.
Designing Flexible Workflow for Upstream Participation of the Scientific Data Community Robert R. Downs and Robert S. Chen NASA Socioeconomic Data and.
© HATII, University of Glasgow Uncertainty, Risk, Trust, and Digital Persistency Seamus Ross, Director HATII University of Glasgow 2006 NHPRC Electronic.
Who is doing a good job in digital preservation? Audit and Certification of Digital Repositories: ISO and the European Framework.
An Overview of Selected ISO Standards Applicable to Digital Archives Science Archives in the 21st Century 25 April 2007 Donald Sawyer - NASA/GSFC/NSSDC.
David Giaretta Associate Director (Development) Funders: DCC Development Digital Curation Centre a centre of expertise in data curation and preservation.
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
Science Archives in the 21st Century 25/26 April Towards an International standard for Audit and Certification of Digital Repositories David Giaretta.
Repository Requirements and Assessment August 1, 2013 Data Curation Course.
CCSDS - MOIMS Area Data Archive Ingest WG CNES Report London fall meeting – October 2010.
Symmetric Key Management Books Development Plan Daniel Fischer (ESA) Ignacio Aguilar Sanchez (ESA) CCSDS Spring Meeting 2010 | Portsmouth, VA.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
March 2015 Inter-American Network for the Prevention of Violence and Crime.
OAIS Open Archival Information System. “Content creators, systems developers, custodians, and future users are all potential stakeholders in the preservation.
Reference Model for an Open Archival Information System (OAIS) ESIP Summer Meeting John Garrett – ADNET Systems at NASA/GSFC ESIP Summer Meeting.
Information Architecture WG: Report of the Winter 2007 Meeting January 20, 2007 Dan Crichton, Chair NASA/JPL.
Ajh January 2007 CCSDS “Books” Adrian J. Hooke CMC Meeting, Colorado Springs 26 January 2007.
Information Architecture WG: Report of the Fall 2010 Meeting October 29, 2010 Dan Crichton, Chair Steve Hughes (presenting) NASA/JPL.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
May 2004 CCSDS Navigation WG Activity Report CCSDS Spring Series May 2004 CSA, Montreal, Canada Felipe Flores-Amaya CCSDS Navigation WG.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
NASA/NSSDC Report to MOIMS DAI/IPR Plenary 16 January 2007 Colorado Springs, USA.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
MOIMS Area Report N. Peccia ESA R. ThompsonBNSC. MOIMS Reportp. 2CESG-CMC Meeting 23 / 24 Jan 2007 Attendance to the MOIMS Meetings Diversity FactorSM&C6.
WP2 – Strategy, co-operation and dissemination EuroVO-AIDA – First periodic review – 24 April 2009 Françoise Genova, Project Coordinator WP2 – NA2 Strategy,
Information Architecture WG: Report of the Spring 2006 Meeting June 16, 2006 Dan Crichton, Chair NASA/JPL.
Information Architecture WG: Report of the Fall 2005 Meeting September 16, 2005 Dan Crichton, Chair NASA/JPL.
Security WG: Report of the Spring 2008 Meeting Marriott Courtyard Crystal City, VA March 14, 2008 Howard Weiss NASA/JPL/SPARTA
NASA/NSSDC Report to MOIMS DAI/IPR Plenary 1 October 2007 Heppenheim, Germany.
Security WG: Report of the Spring 2010 Meeting Renaissance Hotel Portsmouth, VA May 7, 2010 Howard Weiss NASA/JPL/Cobham
Security WG: Report of the Spring 2012 Meeting European Space Operations Centre Darmstadt, Germany 19 April, 2012 Howard Weiss NASA/JPL/SPARTA
08 April 2005 Athens, Greece AD-NP - 1 MOIMS AREA: STATUS REPORT, Start of Spring 2005 Meeting N. Peccia ESA R. Thompson BNSC Area Directors Joint CESG/CMC.
The OAIS Reference Model Michael Day, Digital Curation Centre UKOLN, University of Bath Reference Models meeting,
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
Information Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Steve Hughes, NASA/JPL.
Data Archive Ingest WG Report to MOIMS Plenary May 14, 2004.
SEDAC Long-Term Archive Development Robert R. Downs Socioeconomic Data and Applications Center Center for International Earth Science Information Network.
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
Second Annual Medical Research Summit March 25, 2002 Washington, D.C.
Security WG: Report of the Spring 2014 Meeting NH Hotel Leeuwenhorst Noordwijkerhout, The Netherlands 3 April 2014 Howard Weiss NASA/JPL/PARSONS
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
Katherine Skinner, Martin Halbert & Matt Schultz Educopia Institute and MetaArchive Cooperative NDSA Infrastructure Committee
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Page 1 Meeting Planning PROJECTION OF FUTURE HOSTING DATES DateWG/CMC? HostLocation/Date March 08 (Spring)WG NASACrystal City, VA, March COMPLETED.
Security WG: Report of the Spring 2004 Meeting May 13, 2004 Howard Weiss, NASA/JPL/SPARTA.
NASA/NSSDC Report to MOIMS DAI/IPR Plenary
Audit & Certification in APARSEN
Audit & Certification with ISO standards
Digital Repository Certification Schema A Pathway for Implementing the GEO Data Sharing and Data Management Principles Robert R. Downs, PhD Sr. Digital.
Auditing of Trustworthy Data Repositories – Speakers
Criteria for Assessing Repository Trustworthiness: An Assessment
Preparing a Trustworthy Domain Repository for ISO Certification
Colorado Springs, CO, USA, 24 April 2009 Deputy – David Giaretta
Trustworthiness of Preservation Systems
Digital Repository Audit and Certification BOF
Security WG: Report of the Fall 2013 Meeting
Joint IPR/DAI Workshop
Public Key Infrastructure Using X.509 (PKIX) Working Group
Presentation transcript:

MOIMS Reportp. 1 Digital Repository Audit and Certification BOF Goal  Obtain CCSDS / ISO approval of a standard that establishes the criteria that a repository / archive must meet to be designated an ISO Trusted Digital Repository. Mailing list moims-rac set up, 112 members already BoF initial meeting held, with 26 participants (including telecon & videocon) Weekly virtual meetings held approx weekly  Agencies: BNSC, CNES, ESA, NASA  Others: Center for Research Libraries (CRL) U North Carolina Lockheed Martin UK Digital Curation Centre (DCC) CCLRC, UK UOL, Brazil Smithsonian Institution Archives Center for International Earth Science Information Network (CIESIN), U Columbia IPCSR U of California, Office of the President NARA/ U Maryland Dutch National Library (KB), Netherlands Humboldt University, Berlin Charter agreed by BoF

MOIMS Reportp. 2 2.X.1 RATIONALE Agencies and other organizations are producing digitally encoded information at an increasing rate. These collections are held in a number of digital repositories (archives). So far there have been no independent criteria to objectively judge whether or not any of these archives have been adequately protecting their digital holdings, and in particular whether the information in those holdings will remain understandable and usable by their Designated Communities in the future. As recorded in the successful OAIS Reference Model, there is a demand for a standard against which Repositories of digital information may be audited and on which an international accreditation and certification process may be based. The working group will seek to produce the required audit and certification standard. In addition to Space Agency support, it is anticipated that significant resources will be contributed from many other organisations.

MOIMS Reportp. 3 2.X.2 GOALS Obtain ISO approval of a standard that establishes the criteria that a repository/archive must meet to be designated an ISO Trusted Digital Repository.  Review the existing work on audit and certification criteria for digital repositories DONE  Prepare a draft (based on TRAC) and submit to ISO as a Committee Draft to get the ISO process going. ALMOST COMPLETED  Analyse the consistency of those works with the OAIS Reference Model (ISO 14721) and follow on standards such as PAIMAS and the forthcoming PAIS. IN PROGRESS  Review existing audit and certification standards such as ISO 9000 and ISO DONE Neither of these two standards audit the preservation of the encoded information, hence the need for a new standard.  Generate and review options for hierarchies of audit requirements and levels of (or profiles for) certification. NOT STARTED  Document procedures for auditors. IN PROGRESS  Progress the document through the CCSDS and ISO process in parallel.

MOIMS Reportp. 4 2.x.3 Schedule and Deliverables DateDate MilestoneMilestone Jan 2007 Action: Seek inputs to the review process - DONE Nov 2007 Action: Submit Committee draft - ALMOST DONE March 2008 Deliverable: Draft certification document (White Book v0) Oct 2008 Deliverable: White Book v1 Dec 2008 Deliverable: Test report of audits using WB March 2009 Deliverable: Red Book review i.e. external review of draft including ISO review March 2009 Deliverable: Green Book - guidelines for auditors June 2009 Deliverable: Parallel audits of an archive to check consistency of evaluations

MOIMS Reportp. 5 2.X.4 RISK MANAGEMENT STRATEGY 2.x.4.1 Technical Risks  Technical risks are medium to low since there has already been international activity in this area and many years of experience of audit activities in related areas. There is considerable support for this activity from outside the Space Agencies, and the success and widespread take-up of the OAIS Reference Model provides the paradigm which we can follow.  The standard is expected to be strongly linked to the OAIS Reference Model. The latter is undergoing its 5 year review and any changes are likely to be made and agreed well before the completion of the Audit and Certification standard, so there is little chance of inconsistencies. 2.x.4.2 Management Risks  Unavailability of resources could delay achievement of milestones. Fallback option would be to reschedule the milestones. However, this risk is mitigated but the expected resources being provided by organizations that have not traditionally been associated with CCSDS. There is the potential that one or more active experts from various agencies may become unavailable and, this could impact the schedule if the timeline slips substantially.

MOIMS Reportp. 6 2.X.5 RESOURCE REQUIREMENTS RoleRole Effort FTE/year FromEffort FTE/yearFrom WG Lead 0.1 BNSC/STFC WG Deputy 0.1 NASA Document Editor 0.20 BNSC/STFC Contributor 0.05 CNES Contributor 0.05 (TBC) ESA Contributor 0.5 BNSC/STFC Contributor 0.5 OTHERs including CCSDS Associates

MOIMS Reportp. 7 Digital Repository Audit and Certification BOF RESOLUTION  That this BoF become a Working Group Issues / Actions  CESG / CMC will investigate the best way to undertake parallel reviews in CCSDS and ISO (e.g. creation of new ISO work item)  CMC / ISO Liaison will investigate guidelines for ISO accreditation and certification