Calculating Stripping Ratios for Area Strip Mines Mnge 315

Slides:



Advertisements
Similar presentations
A force applied over a surface is pressure.
Advertisements

Volume of Rectangular Prisms
Questions Addressed by Cost-Volume-Profit Analysis
Mathematics Review GySgt Hill. Mathematics Review Overview.
Picking a Suitable Truck © Dr. B. C. Paul 2000 Revised 2009 Hi!
How to Set Up a Processing Plan in MSOPIT’s Economics Panel.
Interpreting a contour map
Calculating Stripping Ratios for Irregular Geometries ©Dr. B. C. Paul Spring 2003.
Classic Open Pit Mining
Surface Mining (The Concept of Surface Mining) Mnge 315 ©Dr. B. C. Paul Spring 2003 revisions 2010, 2011 These slides contain concepts considered by the.
Matching An Excavator to Our Trucks ©2009 Dr. B. C. Paul Note – These Slides contain tables and information found in the Caterpillar Performance Handbook.
Volume of Prisms Monday, May 18, 2015 We are learning to…find the volume of rectangular and triangular prisms.
Chapter 2 Approaches to Problem Solving
THE PROBLEM SOLVING POWER OF UNITS 2A. Basics Units of quantity describe what is being measured or counted. We can only add values that have the same.
Volume is the amount of space inside a three-dimensional (3-D) shape
Composite Functions Consider a person working for a concrete contractor. One of his jobs is to estimate the cost for the product to put in a concrete driveway.
The Quasi - Open Pit Methods Mnge 315 ©Dr. B. C. Paul spring 2003.
The Gulf Oil Spill Whose to Blame as well as a reflection of the science literacy problem in the US.
McGraw-Hill/Irwin1 © The McGraw-Hill Companies, Inc., Cost-Volume- Profit Analysis Chapter 22.
Density.
Chapter 4: Accelerated Motion in a Straight Line
COSTS OF BUYING A CAR PART 1 (IN THE FUTURE) Because you will likely need/want to drive places.
Volume Prisms and Cylinders Lesson Volume of a solid is the number of cubic units of space contained by the solid. The volume of a right rectangular.
Calculating Stripping Ratios for Simple Open Pits Mnge 315
Stiffness Ratio Stiffness Ratio = B H / B where B H is Bench Height B is the Burden Target Stiffness Ratios 3 to 4 is normal range > 4 does not improve.
4.8 Solving Problems with Trigonometry. What you’ll learn about More Right Triangle Problems Simple Harmonic Motion … and why These problems illustrate.
Chapter 4 Problem Solving in Chemistry
Chapter 4 Problem Solving in Chemistry
Measurements and Calculations
Chapter 3 Problem Solving in Chemistry
COST-VOLUME-PROFIT ANALYSIS
Entering My Haul Road Profile ©2009 Dr. B. C. Paul Note- This presentation draws on previous notes developed as early as 2000 and contains numerous screen.
Chapter 2 Measurements and Calculations. Chapter 2 Table of Contents Return to TOC Copyright © Cengage Learning. All rights reserved 2.1 Scientific Notation.
Copyright © Cengage Learning. All rights reserved. Graphs; Equations of Lines; Functions; Variation 3.
Obtaining Information From the Geologic Block Model
Surface Mining Ore Body Geometry ©2011 Dr. B. C. Paul Note- Concepts given here are considered to be common knowledge to those involved in early stage.
Reclaiming Surface Mines ©2007 Dr. B. C. Paul. Mines That Can Be Concurrently Reclaimed  Area Strip Mines and Most Contour Strip Mines can be reclaimed.
Factors: Numbers that divide into other numbers. Look for pairs of numbers e.g. Factors of 12 are 1x12 2x6 3x4 = 1,2,3,4,6,12 Multiples: Answers to the.
No need to fear! Super- Jack is here to help you with unit 10 HELP!
Measurement & Data Vocabulary a.m. – the half of the day that is from midnight to the middle of the day; morning analog clock - a clock that shows the.
Copyright © 2013 Pearson Education, Inc. Section 2.4 Formulas.
Class Introduction Surface Mining ©2007 revised 2011 Dr. Bradley C Paul.
Assignment #6 Stripping Ratios by Planimeter ©Dr. B. C. Paul Summer 2003.
Using Konya’s Method to Identify Blast Design Problems An overview of the Havablast 4 Spreadsheet.
Section 10A Fundamentals of Geometry
Designing Basic Blasting Shots Part I ©Dr. B. C. Paul 2000 Note – The topics covered in these slides represent the author’s summary of information familiar.
Computer Aided Mine Design (Part I – Ultimate Pits) Mnge 315 ©Dr. B. C. Paul spring 2003.
Page #4 Density Notes COPY THIS DOWN TO HELP WITH WARM_UP Observation – the gathering of information by our 5 senses. (sight, smell, hearing, taste, and.
Computer Aided Mine Design Part III Cut-Off/Equipment Interactions ©Dr. B. C. Paul 2000 ©Dr. B. C. Paul Summer 2003.
Chapter 2 Approaches to Problem Solving Section 2A The Problem Solving Power of Units Pages
Differentiation: Related Rates – Day 1
Page 1 What happened here? Read the following story and see if you can figure it out Imagine you are a pilot from USA getting ready for your return flight.
Copyright © Cengage Learning. All rights reserved. 1.3 Perimeter, Area and Volume.
Step #1 Matching ©Dr. B. C. Paul 2000 revised 2008 Note many of the ideas expressed in these slides can be found in Surface Mining Manuals, the Book Surface.
Planning Surface Mines Mnge 315 ©Dr. B. C. Paul 2003.
Week 9 ©2012 Dr B C Paul. Coal Trouble in the Board Room –Plans to ignore large amounts of met coal and drop mining your low sulfur coal and cut down.
Computer Aided Mine Design Part II – Pit Sequences ©Dr. B. C. Paul 2000 ©Dr. B. C. Paul summer 2003.
Unit 10-Day 1 Squares: Area and Perimeter
Assignment #5 Open Pit Stripping Ratios ©Dr. B. C. Paul Summer 2003.
Open Pit Planning and Design The Standard Approach for Open Pit ©2007 Dr. B. C. Paul.
Simple Percent Problems To solve a simple percent problem, you change the percent to a decimal and multiply. Solve the following percent problems. Remember.
True Open Pits ©Summer 2003 Dr. B. C. Paul. Telling a True Open Pit Strip mines advance across the deposit backfilling pits with new overburden as they.
Aim: How can the metric system be used to measure cubic volume? Do Now: Write the formula for area. What is the area of a square that has the following.
The Quasi - Open Pit Methods Mnge 315
SURFACE AREA & VOLUME RECTANGULAR PRISM – AREA RECTANGULAR PRISM – VOLUME.
Quarry Operations © Dr. B. C. Paul Summer Specialized Open Pit Simple Quarries operate on thick tabular limestone deposits with limited soil cover.
Section The repeating part of a decimal can be so long that it will not fit on a calculator. Most calculators round off repeating decimals.
Chapter Using Imperial Units for Volume
Measurements and Calculations
January 20 and January 21 Perimeters and Areas
Presentation transcript:

Calculating Stripping Ratios for Area Strip Mines Mnge 315 ©Dr. B. C. Paul spring 2003 revised 2010 Note – These notes contain information considered common knowledge to those familiar with Strip Mining. Books such as “Elements of Practical Coal Mining” and SME’s “Surface Mining” were specifically referenced

Stripping Ratio as a Fundamental Ability to surface mine depends on the value of the ore being high enough to offset the cost of Overburden Removal Stripping Ratio determines relative amounts of each to be moved If coal generates a $5/ton earning and overburden costs 45 cents per cubic yard to move – what is the maximum economic stripping ratio $5.00/ 0.45 = just over 11 cubic yards per ton Called a “Break Even Stripping Ratio”

Complexities Warning Units of Stripping Ratio depend on convenience of the industry Coal overburden is normally light and machines are limited by volume in cubic yards Coal is sold by the ton Cubic Yards/ton makes sense Hard Rock Metal Both ore and overburden are trucked Both are heavy and trucks are usually weight limited Tons/ton makes sense (unit-less)

More Warnings Geometry problems usually measure volumes which convert to tons only if density is the same for all materials Material may be rehandled Get operating and geologic stripping ratios Don’t use 40 cents per cubic yard to figure stripping ratio off of geometry if you have 10% rehandle

Fixed and Variable Costs Example of the Car If you have a car Insurance Licensing Fees Storage or Parking Space These Costs constant per unit of time regardless of use of car Variable Costs Gas Tires Oil Changes Largely Dependent on mileage you drive

Fixed and Variable Costs in Mining Some mining costs are fixed (many administrative features for example) Others are variable – direct materials handling cost What goes into Break Even Stripping Ratio Direct materials costs go into Break Even Fixed Costs are charged to the average stripping ratio you mine over the time

Simple Stripping Ratios Bottom of a Strip Mine Top of a Strip Mine For a pit 1 mile long and 160 ft across, how significantly Different is the length at the top And bottom of the pit? Volumes are Length * Width * Height Ratio is A/B What happens if the length term in Both A and B is the same number It cancels – Long strip pits can be Analyzed as 2D problems!!! Life is Good

The 2D Cross Section Area = Base * Height Interest Item – Slope Angle Overburden Interest Item – Slope Angle Has no effect The problem is 1D Only depends on Thickness and density Base for both coal and the overburden is the same That means the base will cancel!

The Coal Area Strip Mine Formula Strip Ratio = OB Thickness (in ft) * 11.11/ Coal thickness in inches Assumes coal is 80 lbs/ft^3 (good for bituminous) Area Strip Mine Geometry Geologic Stripping Ratio – no accounting for rehandle or less than 100% coal recovery

Your Turn Use What You Have Learned About Calculating Stripping Ratios for Strip Mines and Break Even Limits to Determine the Size of a Coal Reserve Do Assignment #3

A Little Explanation Very seldom is a coal seam the same Distance from the surface always Less overburden means More profit. Project worth is increased if you take the Biggest profits first – thus strip mines start Shallow and work into deeper stuff. Is it possible that eventually the coal Will get deep enough to exceed the break-even Stripping ratio – of course! In your homework you will look at a coal reserve – start shallow and work until it is Deep enough you can’t afford it anymore. Then you’ll tell me how far you could mine.