1. TimeContent 2:15 – 2:30Registration 2:30 – 3:00Revised arrangement for MR / ER for aided schools by TSE Lap Wa Anchor, EDB 3:00 – 4:00Procedure on.

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Historic Buildings Grant-Aid Scheme Details Built Heritage Directorate NIEA.
How to Assess the Risk with your Ventilation System
Major works RESIDENTIAL LEASEHOLD EXPERTS. THE BASICS Your Landlord has a duty to you and all Leaseholders in the property, to properly and continually.
EstatesMaster Case Study 2 Breakfast Briefing Presentation: Setting the Facilities Budget for a large new Corporate HQ Nigel Anderson IFPI Ltd 14th June.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
HAHP Health & Safety Induction 2014/15
REQUEST FOR PROPOSALS RFP #08-56 Project Management and Procurement Assistance Consultant for an Intelligent Transit System Solution (I.T.S.S.) October.
DCU Health & Safety Office ‘Safety is Everybody’s Responsibility’
Disability Access and Inclusion Planning Agents and Contractors DAIP Progress Reporting.
ESSENTIAL SAFETY MEARURES IN BUILDINGS PRESENTED BY: BRUCE HOWIE.
ZHRC/HTI Financial Management Training
Permit to Work Procedure Document Number: KOC.SA.004
SELECT Scheme Provider Certification of Construction (Electrical Installations to BS 7671)
South Carolina Housing Trust Fund An Introduction for New Participants January, 2006.
HOW TO WRITE A BUDGET…. The Importance of Your Budget Preparation of the budget is an important part of the proposal preparation process. Pre-Award and.
Road Map to a Green Tag Paperwork=Time=Money. Questionnaire If you could change any one major thing inside the Fire Community Services process what would.
Inspire Risk Management Limited Apartment Block Complexes “the associated issues and there links to insurance” Presented to Paul.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Processing Major Repair Application from DSS School REO’s Perspective 1.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Roles and Responsibilities in the system for the delivery of social grants August 2006 National Treasury.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
Department of Automatic Control & Systems Engineering Safety Induction.
1 1. Applying for non-recurrent grants to carry out MR / ER 2. Delivery of approved major /emergency repairs projects 3. Misc - tree management, change.
Chapter Hosting of RCI Educational Programs Planning and Implementing Successful Presentations Developed By the RCI Georgia Chapter.
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
Specification & Quantities Estimating
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT November 19, 2013.
Newry & Mourne District Council An Applicant’s Perspective Eddie Newell Senior Building Control Surveyor Building Control Department.
BUILDINGS & ESTATES DEPARTMENT RESPONSIBILITIES  MAINTENANCE OF EXISTING BUILDINGS & GROUNDS Mechanical Electrical Builders Work Grounds Specialist 
1. 2 Background Bill C-3, International Bridges and Tunnels Act: –introduced in the House of Commons on April 24, 2006 –received Royal Assent on February.
Library Operations and Facilities. Mail for the entire building : receiving.
Applications for Non-recurrent subsidy to carry out Major Repairs / Slope Repairs Briefing Session for Schools under the Direct Subsidy Scheme
STRATEGIC ASSET MANAGEMENT ASSISTANT CHIEF FIRE OFFICER PAUL SOUTHERN.
KENYA NATIONAL BUREAU OF STATISTICS
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
Dr. John D. Barge, State School Superintendent “Making Education Work for All Georgians” 21 st Century Community Learning Centers Program.
Unit 210: How to communicate with others
Safety Audits An essential tool for active safety management April 2015 Dr Emer Bell Integrated Risk Solutions.
Roles & responsibilities Involving staff in safety management December 2015 Dr Emer Bell Integrated Risk Solutions.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Introduction TopRung LLC is one of the leading construction building repair and building maintenance service company in Seattle.
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
Every employer must ensure, as far as is reasonable practicable, the health, safety and welfare of all his employees More specifically, employers must.
NHS PAM Electrical Systems 2 nd June ) Policy & Procedures Does the Organisation have a current, approved Policy and an underpinning set of procedures.
Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.
Welcome This partnership meeting will cover information and the timetable for the opening of the new KCEPS.
Roles and responsibilities PM
The Design Team Carl James.
Accreditation process for Industrial Hygiene Inspection Bodies
Contract Award Procedures
DMS Office of Efficient Government Kick Off Meeting.
RIBA Plan of Work 2013.
PRESENTATION MADE TO THE PORTFOLIO COMMITTEE CHARLOTTE MAXEKE JOHANNESBURG ACADEMIC HOSPITAL DATE: 05 SEPTEMBER 2012 To be the best provider of.
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Temporary Works Co-ordination
How to Build a Great Team
Business TAFE School Restructure proposal.
Introduction to building contract
North of Tyne Community Led Local Development
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Back Ground Information
United Nations Voluntary Fund on Disability (UNVFD)
City Council Meeting November 14, 2016
RIBA Plan of Work 2013.
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
RIBA Plan Tom Robinson sir david Swindells Vii
Presentation transcript:

1

TimeContent 2:15 – 2:30Registration 2:30 – 3:00Revised arrangement for MR / ER for aided schools by TSE Lap Wa Anchor, EDB 3:00 – 4:00Procedure on applying non-recurrent grants to carry out MR / ER Delivery of approved major /emergency repair projects Tree management by TSE Lap Wa Anchor & MK CHENG, EDB 4:00 – 4:15Break 4: 15– 5:00Main features for the Building s Ordinance (on context of school premises) by TSE Lap Wa Anchor, EDB 5:00 – 5:15Q & A 2

Milestone dates of development of School Premises Maintenance Section (SPMS) – With seconded professionals from ArchSD to kick off preparation work – Taking up coordination work in relation to MR/ER to aided /DSS schools – SPMS to execute newly approved MR/ER projects each costing $2M or below for non-estate aided schools 3

Organisation of SPMS Headed by SMS(SPM), supported by a multi- disciplinary team comprising – Building Services Engineer, Maintenance Surveyors, Quantity Surveyor, Education Officer (Admin), Executive Officer, … 4

Key Roles oversee the school premises maintenance services for both aided schools and DSS schools arrange tendering for consultants and works contractors in taking up maintenance services for non-estate aided schools manage and supervise consultants and works contractors in delivering maintenance project each ≦ $2M for non- estate aided schools process applications from aided schools for MR and ER works plan and assist in allocating resources for execution of school maintenance projects 5

Delineation of Responsibilities between SPMS and ArchSD Emergency Repairs (non-estate aided schools) RequestResponsible Government Departments Submitted before ArchSD (projects, including all the outstanding items, will be undertaken until project completion) Submitted on or after EDB (approved ER projects of est. >$2M will be referred to ArchSD for delivery) 6

Delineation of Responsibilities between SPMS and ArchSD Major Repairs (non-estate aided schools) ItemResponsible Government Departments Approved projects for FY or before ArchSD (projects, including all the outstanding items, will be undertaken until project completion) Approved projects for FY or after Approved Project Est. ≦ $2M EDB Approved Project Est. > $2M Arch SD Vetting for MR applications for FY or after EDB (approved MR projects of est. >$2M will be referred to ArchSD for delivery) 7

Delineation of Responsibilities between SPMS and ArchSD Technical advisory services to REO for processing requests from schools for change of room use / alteration PeriodResponsible Government Departments before ArchSD on or after EDB 8

Partnership between SPMS and REO Position of HD – basically no change SPMS basically takes up -ArchSD’s position on ER/MR projects with value ≦ $2M -co-ordination work in respect of MR/ER -Technical advisory services to REO in respect of processing requests from schools for change of room use / alteration 9

Partnership between SPMS and REO projects delivered by EDB/other departments estate aided schools Non-estate aided schools ≦ $2M > $2M Self-delivery projects DSS schools MR > $2M DHO cases slope works REO SPMS Works co-ordination Resources allocation Technical advisory School contact point Works delivery agents HD ArchSD(PSB) ArchSD (SPD) SPMS ArchSD(PSB) Technical adviser on subvention procedure & subventability 10

School Premises Maintenance Responsibility owner/occupier to resume occupier’s liability and obligations under Education Ordinance and associated regulations AIDED SCHOOL School’s Consultant /AP EDB Professional adviser to schools on self- delivered projects Oversee Major Repair and Emergency Repair works vote controller To deliver Major Repair and Emergency Repair works EDB’s consultant /contractors 11

School Premises Maintenance Responsibility Prevailing Items Concrete Spalling Broken window 12

School Premises Maintenance Responsibility Prevailing Items (cont’d) Fire Services Installation Plumbing & Drainage 13

School Premises Maintenance Responsibility Prevailing Items (cont’d) Rusted metal gate 14

School Premises Maintenance Responsibility Prevailing Items (cont’d) Debonded external wall tiles / rendering 15

School Premises Maintenance Responsibility Prevailing Items (cont’d) Slope Maintenance Electrical Installation 16

School Premises Maintenance Responsibility Maintenance Inspection (Examples) Building Inspection Window Inspection (recommended at least once a year with regular maintenance) 17

School Premises Maintenance Responsibility Maintenance Inspection (Examples) (cont’d) Metal Gate (at least once every 3 months) Drainage System (at least once a year before onset of rainy season) 18

School Premises Maintenance Responsibility Fire Services Installation (at least once a year) Electrical Installation (at least once every 5 years) Lift Installation (at least once a year with periodic maintenance) Maintenance Inspection (Examples) (cont’d) 19

School Premises Maintenance Responsibility Slope (Routine Maintenance Inspection - at least once a year) (Engineer Inspection – at least once every 5 years) Maintenance Inspection (Examples) (cont’d) 20