EML 4550: Engineering Design Methods

Slides:



Advertisements
Similar presentations
Design of Experiments Lecture I
Advertisements

1 Manufacturing Process A sequence of activities that is intended to achieve a result (Juran). Quality of Manufacturing Process depends on Entry Criteria.
Introduction to Statistical Quality Control, 4th Edition Chapter 7 Process and Measurement System Capability Analysis.
Managing Quality Chapter 5.
Lecture Presentation Software to accompany Investment Analysis and Portfolio Management Seventh Edition by Frank K. Reilly & Keith C. Brown Chapter.
Chapter 10 Quality Control McGraw-Hill/Irwin
02/25/06SJSU Bus David Bentley1 Chapter 12 – Design for Six Sigma (DFSS) QFD, Reliability analysis, Taguchi loss function, Process capability.
Chapter 12 Design for Six Sigma
MAE 552 Heuristic Optimization
Chapter 9 Audit Sampling: An Application to Substantive Tests of Account Balances McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved.
Chapter 12 Design for Six Sigma.
BCOR 1020 Business Statistics Lecture 21 – April 8, 2008.
Chapter 5, Part 1 The TQM Philosophy. What is Quality?  What do we mean by quality?  Newer, more widely accepted definition of quality is the ability.
Monté Carlo Simulation MGS 3100 – Chapter 9. Simulation Defined A computer-based model used to run experiments on a real system.  Typically done on a.
Chapter 6 – Part 4 Process Capability.
Lecture 11 Implementation Issues – Part 2. Monte Carlo Simulation An alternative approach to valuing embedded options is simulation Underlying model “simulates”
Tolerance Design.
1 Industrial Design of Experiments STAT 321 Winona State University.
Introduction to Robust Design and Use of the Taguchi Method.
3 CHAPTER Cost Behavior 3-1.
Introduction to Statistical Quality Control, 4th Edition Chapter 7 Process and Measurement System Capability Analysis.
Chap 11 Engineering Statistics PREP004 – Introduction to Applied Engineering College of Engineering - University of Hail Fall 2009.
Version 1.2 Copyright © 2000 by Harcourt, Inc. All rights reserved. Requests for permission to make copies of any part of the work should be mailed to:
Lecture Presentation Software to accompany Investment Analysis and Portfolio Management Seventh Edition by Frank K. Reilly & Keith C. Brown Chapter 7.
Some Background Assumptions Markowitz Portfolio Theory
Robust Design and Reliability-Based Design ME 4761 Engineering Design 2015 Spring Xiaoping Du.
Tolerance Limits Statistical Analysis & Specification
1 Lecture 19: Hypothesis Tests Devore, Ch Topics I.Statistical Hypotheses (pl!) –Null and Alternative Hypotheses –Testing statistics and rejection.
Chapter 2 Risk Measurement and Metrics. Measuring the Outcomes of Uncertainty and Risk Risk is a consequence of uncertainty. Although they are connected,
Audit Sampling: An Overview and Application to Tests of Controls
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 9-1 Chapter Nine Audit Sampling: An Application to Substantive.
Brian Macpherson Ph.D, Professor of Statistics, University of Manitoba Tom Bingham Statistician, The Boeing Company.
Chapter 36 Quality Engineering (Part 2) EIN 3390 Manufacturing Processes Summer A, 2012.
Optimizing Shipping Times Using Fractional Factorial Designs Steven Walfish June 6, 2002.
MSE-415: B. Hawrylo Chapter 13 – Robust Design What is robust design/process/product?: A robust product (process) is one that performs as intended even.
Process System Capability An introduction to 9103 ‘VARIATION MANAGEMENT OF KEY CHARACTERISTICS’ Bernard LAURAS AIRBUS.
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 12 Design for Six Sigma.
Chapter 16: Product Design and Manufacturing
Chapter 10 Verification and Validation of Simulation Models
Copyright © 2013 Nelson Education Ltd.
Statistical Quality Control
1 The Role of Statistics in Engineering ENM 500 Chapter 1 The adventure begins… A look ahead.
Chapter 8. Process and Measurement System Capability Analysis
BME 353 – BIOMEDICAL MEASUREMENTS AND INSTRUMENTATION MEASUREMENT PRINCIPLES.
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University © Copyright 2007 Thomson South-Western,
X. EXPERIMENTAL DESIGN FOR QUALITY
CHAPTER- 3.1 ERROR ANALYSIS.  Now we shall further consider  how to estimate uncertainties in our measurements,  the sources of the uncertainties,
Design of Goods and Services Chapter 5. Designing Goods Form design: Appearance and other sensory aspects of a product Contributes to customer expectations.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Statistics for Business and Economics 8 th Edition Chapter 9 Hypothesis Testing: Single.
Slide 1 Loss Function Losses begin to accrue as soon as a quality characteristic of a product or service deviates from the nominal value Under the Taguchi.
THE MANAGEMENT & CONTROL OF QUALITY, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 12 Design for Six Sigma The Management & Control of Quality,
TAUCHI PHILOSOPHY SUBMITTED BY: RAKESH KUMAR ME
P4 Advanced Investment Appraisal. 2 2 Section C: Advanced Investment Appraisal C1. Discounted cash flow techniques and the use of free cash flows. C2.
L Berkley Davis Copyright 2009 MER301: Engineering Reliability Lecture 8 1 MER301: Engineering Reliability LECTURE 8: Chapter 4: Statistical Inference,
TOTAL QUALITY MANAGEMENT
Overview Modern chip designs have multiple IP components with different process, voltage, temperature sensitivities Optimizing mix to different customer.
Dr. S. Poornachandra Dean – BME & EIE SNS College of Technology
Chapter 9 Audit Sampling: An Application to Substantive Tests of Account Balances McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved.
Risk Mgt and the use of derivatives
Statistics: The Z score and the normal distribution
36.1 Introduction Objective of Quality Engineering:
STATISTICAL TOOLS FOR AUDITING
Saif Ullah Lecture Presentation Software to accompany Investment Analysis and.
Chapter 10 Verification and Validation of Simulation Models
Basic Training for Statistical Process Control
Basic Training for Statistical Process Control
Process and Measurement System Capability Analysis
Statistical Process Control
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

EML 4550: Engineering Design Methods Tolerance Design From “Tolerance Design: A Handbook for developing optimal specifications,” by C.M. Creveling, Addison-Wesley, Chapter 11 Also “Engineering Design,” by G.E. Dieter Chapter 12 EML4550 2007

Definitions Tolerance Geometric tolerance - range for a particular dimension General tolerance - acceptable range for a design variable (dimension, roughness, viscosity, refractive index, etc.) Most techniques developed for tolerance design apply to dimensions, but many can be generalized to any design tolerance problem Tolerance design appeared with the Industrial Revolution as the need for interchangeability arose. EML4550 -- 2007

Definitions Geometric Dimensioning and Tolerancing (GD&T) Tolerance design geared towards ‘variance reduction’ as the key to repeatable, low-cost manufacturing Converging views from East and West Taguchi method Application of sound statistical and mathematical methods in the design process to reduce variance (design for quality) EML4550 -- 2007

Tolerance Design: Process Flow Diagram Customer Tolerances Customer Costs & Losses Product Output Response Process Capabilities Product Output Response Tolerance System and Assembly Process Capabilities System and Assembly Tolerances Component Part Process Capability Component Part Tolerances Manufacturing Process Parameter Tolerances Manufacturing Process Capabilities EML4550 -- 2007

Tolerances Tolerances need to be defined because we live in a probabilistic world and 100% reproducibility in manufacturing is not physically possible Tolerances are defined in a standard: ANSI Y14-5M-1982 (R1988) (American National Standards Institute-ANSI) “The total amount by which a given dimension may vary, or the difference between the limits” EML4550 -- 2007

Different Approaches to Tolerancing Traditional methods in tolerance design Semi-empirical Experience Manufacturing process capabilities Computer-aided tolerance design Plug-in packages for CAD software (propagation of tolerance techniques – “error analysis”) Statistical methods Monte Carlo simulation Sensitivity analysis Cost-based tolerance design Modern methods in tolerance design Taguchi approach EML4550 -- 2007

Classical Tolerance Design Process Select Process Change Process Collect Statistical Data Under Control? N Work on process Y Management Decision Process Capable? Live with it Test 100% Y N Change Specs Stop Production EML4550 -- 2007

Classical Tolerance Design Process (Cont’d) Specs Being Met? N Recenter Process Y Continue Gathering Statistics For continued process improvement, conduct designed and controlled experiments to further reduce variability EML4550 -- 2007

Tolerances and Quality Engineering Taguchi: “Tolerances are economically established operating windows of functional variability for optimized control factor set points to limit customer loss” More general, not just dimensions Economically-driven (trade off) Control factors that are pre-defined (not any variable) Limit, but not eliminate, customer losses EML4550 -- 2007

Taguchi Approach Concept of off-line QC On-line QC Incorporate QC and tolerancing before releasing the design to production Iterative process as a final step prior to drawing release On-line QC Traditional approach of in-plant QC, ‘fix it’ after the fact or scrap Use on-line QC to maintain or improve quality of the designed product (little or no improvement needed if ‘off-line’ QC was properly implemented) EML4550 -- 2007

The three phases in Tolerance Analysis Basically the standard approach for the design process Concept design: selection of technology platform, metrics to assess relative merits, concept robustness (safety, environment, commercial, reliability, etc.) Parameter design: optimization of concept, parameters to reduce sensitivity to ‘noise’ (uncontrollable parameters) Tolerance design: Balancing of customer loss function with production cost, ability to determine and limit the variability around the ‘target’ set points (as defined in parameter design). EML4550 -- 2007

Taguchi’s Approach to Tolerancing Input from the ‘voice of the customer’ Select proper quality-loss function for the design evaluation Select the customer tolerance values for the Quality Loss Function: Ao ($ lost due to off-target value) and Do (measurement of Off-target performance in engineering terms) Determine the cost to the business to adjust the off-target Performance back to acceptable range during manufacturing: A Calculate the manufacturing tolerance: D based on Taguchi’s Equation: “My” acceptable variability = “Their (customer’s)” acceptable variability x square root of the ratio between “My” cost to stay within production tolerance / “Their” loss if my product is out of tolerance EML4550 -- 2007

Traditional Tolerance Curve Factories would accept or reject product based on a simple on/off model (step function) Assumption that customers will behave the same way is WRONG m m-Do m+Do Equally bad product Equally good product Equally bad product target EML4550 -- 2007

Customer Tolerance Customer tolerance is not a simple step function Customer tolerance Do corresponds to the point in which a significant fraction of customers will take some type of action (e.g., 50% of customers would complain) “Thermostat” example 70F 75F 80F 50 100 % of people complaining EML4550 -- 2007

Customer Loss Function Quadratic approximation to the customer loss function L is the loss function k is the quality-loss coefficient y is the performance variable m is the target performance L is the economic loss to my customer if my product deviates “y” from its rated value “m” EML4550 -- 2007

Quality Loss Coefficient The functional limits (m + Do) and (m - Do) represent the deviations from the target in which about 50% of the customers would complain (significant economic loss) This is essentially a definition of product ‘failure’. The economic loss to the customer associated with product failure is Ao (e.g., losses due to lack of access to product plus cost to repair, generally in terms of $) Therefore L(y-=m-Do) = L(y+=m+Do)=Ao EML4550 -- 2007

Customer Loss Functions m+Do m-Do Ao y L(y) m The nominal-the-best case The smaller-the-better case The larger-the-better case Asymmetric cases L(y) Ao y L(y) Do Ao y Do L(y) Ao y m-Do m m+Do EML4550 -- 2007

Taguchi Tolerancing Equations Concept of Taguchi ‘safety factor’ in tolerancing What are the maladies for which we need to build a safety factor? Customer dissatisfaction due to quality problems and customer financial losses (long-term impact to reputation) Higher manufacturing costs due to re-work and scrap Define a tolerance level as seen by the customer (losses) and a tolerance level as seen by the manufacturing process EML4550 -- 2007

Taguchi’s Loss Function Do Di Losses Ao Ai Financial incentive Since A<Ao yo Target (m) yi=m-Di customer tolerance manufacturing tolerance Note: Do-Di=range of safety Do/Di=safety factor EML4550 -- 2007

Safety Factor Ai ≤ Ao: manufacturing-allowable loss For a standard quadratic loss function Deviation from target Loss associated with deviation Ai ≤ Ao: manufacturing-allowable loss should be smaller than the customer loss EML4550 -- 2007

Safety Factor At what level is the company willing to ‘act’ to avoid customer losses by ‘fixing’ the product back to the target value before releasing it? Economic safety factor In general notation: Derived from statistical considerations, sub-o relates to customer (loss function, and maximum deviation), sub-i relates to manufacturer, cost to re-work and maximum manufacturing tolerance EML4550 -- 2007

Safety Factor S=SQRT[(average loss to (customer) in $ when a product characteristic exceeds customer tolerance limits)/(average loss to (manufacturer) in $ when a product characteristics exceeds manufacturing tolerance limits)] The Taguchi Approach relates customer tolerances to engineering tolerances EML4550 -- 2007

Example A company makes a power supply. The nominal (target) value for the supply voltage is 115V. We know the customer incurs a loss of $200 (Ao, due to damaging to instrument, loss of productivity, recall, etc..) when the voltage exceeds 135V (135-115=20=Do, deviation from nominal). The production department has determined that it costs $5 to re-work (adding current-limiting resistor, etc..) a power supply that is off-target back to the nominal value. What should the manufacturing tolerance be and what is the economic safety factor? EML4550 -- 2007

Example EML4550 -- 2007

Example The manufacturing tolerance is: The safety factor is: If the assembly line detects a power supply with voltage lower than 112V (115-3) or higher than 118V (115+3) it is economical to pull it off and repair it The difference between the customer loss and the manufacturing cost is relatively large (200/5=40)  smaller tolerance is permissible sqrt(Ao/A)=sqrt(40)=6.32~20/3 EML4550 -- 2007

Example (alternative interpretation) The manufacturing tolerance can be considered as a deviation away from the nominal value m  Di=y-m The cost to modify the manufacturing process can be considered as the loss function  $5 EML4550 -- 2007

Average Quality Loss The average quality loss, Q, from a total of n units from a specific process can be given by (derived in the next slide) m+Do m-Do Ao y L(y) m m  Deviation of the average value of y from the target m Mean squared deviation of y value away from the target m EML4550 -- 2009

Average Quality Loss EML4550 2007

Example From the previous example, assume the power supplies manufactured have their mean value centered around the target (m=m) so its loss of quality will be dominated by the standard deviation term: Q=k2 If the variance of the power supplies =20 volts, determine the quality loss due to the manufacturing deviation: Q=(0.5)(20)2=$200 If a resistor is added to the unit, it has been demonstrated that it can reduced the variance to 15 volts. The cost of the additional process is $50. Show that whether it is worthwhile? Q=(0.5)(15)2=$112.5a net decrease of loss 200-112.5=$87.5 with an investment of $50, it seems to be a bargain. EML4550 -- 2007

Conclusions The Taguchi Approach can be used at the system level to interact with outside customers, but it can also be implemented within a company Each successive step in the manufacturing process can be seen as a ‘customer’ of the previous step (manufacturing, purchased part, service, etc.) When implemented on a company-wide basis the Taguchi Approach can lead to a quasi-optimal distribution of tolerances among the different components that go into a final product. EML4550 -- 2007