1 The Plan and Plan Review Issued May 2009 Level IB: Advanced Fundamentals Seminar Education and Training Certification Requirements for Persons Involved.

Slides:



Advertisements
Similar presentations
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Advertisements

GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
Erosion & Sediment Control Program Steven Gucciardi, CPESC
State Waters and Stream Buffers
Final Construction Stormwater General Permit Issued November 16, 2005 Jeff Killelea Department of Ecology.
A section has been added regarding Stream Restoration Design Criteria: A. Designs for stream restoration try to mimic natural conditions present in stable.
Future of the Construction and Post Construction Water Quality Program
Cameron County Conservation District. Chapter 102 Rules and Regulations  Erosion is natural, so what’s the deal?  Accelerated Erosion is not natural.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Introduction to Compliance Assistance Documents Part I.
CHAPTER 102 Plain English Guide to the Erosion and Sediment Control (E&S) Regulations Fulton County Conservation District 216 N. Second Street, Suite 15.
April 14, Indicate every resource type proposed for impact on the Application: Tidal Wetland (short form for some projects) Nontidal Wetland Waterway.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
Level II: Introduction to Design Re-certification
Chapter 102 Changes and Highlights Municipal Update Coordinating Permits.
Wes Marshall, P.E. University of Connecticut March 2007 CE 276 Site Design Chapter 10 – Soil Erosion & Sediment Control.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Env 247 Overview of Stormwater Management March 1, 2011.
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
Suzanne Macey.  DEC looks at known occurrences with 1 mile  FWS looks at known occurrences plus the potential for suitable habitat  Contact DEC and/or.
GACDs Annual Meeting January 21 – 23, 2011
Ch  Know what design frequency means  Know how to delineate a drainage area on a topographic map 2.
Overview of RIPDES Construction General Permit Requirements Developed by: Greg Goblick, Laura Stephenson RI Department of Environmental Management RIPDES.
1 Common Issues on Plans Recertification Training For Level II Introduction to Design Certified Plan Reviewers and Certified Design Professionals Issued.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN DESIGN APPROACH- THE BASICS Issued May 2009.
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
FNR 402 – Forest Watershed Management
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Module 7: Construction Phase
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.
1 Common Issues on Site Re-certification Training For Level IB Advanced Fundamentals Certified Inspector Issued May 2009.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Conservation Strategies for Growing Communities. The Growth of Urban Conservation.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
1 Field Maintenance of Structural and Vegetative Measures Level 1A: Fundamentals Seminar Education and Certification for Persons Involved in Land Disturbing.
Stormwater Retrofitting: The Art of Opportunity Prepared by the Center for Watershed Protection.
State Waters Determination and Stream Buffers
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
1 Role of the Inspector Re-certification Level IB: Advanced Fundamentals Seminar Education and Training Requirements for Individuals Involved in Land Disturbing.
Erosion and Sediment Control Plans (ESCPs) San Rafael, California November 12, 2015 Marin County Stormwater Pollution Prevention Program.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Bureau of Watershed Management Regulatory Proposal Chapter 102 [Erosion and Sediment Control] Erosion, Sediment and Stormwater Management February 21,
SW101 Large and Small Construction Denise Hamilton, EPA Region 6 8 th Annual Region 6 MS4 Operators Conference June 26, 2006.
Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008.
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
Bureau of Watershed Management Preliminary Regulatory Proposal Chapter 102 Erosion, Sediment and Stormwater Management December 19, 2007.
4.0 Unit 4: BFE Considerations. 4.1 Objectives At the end of this unit, you should be able to:  List potential data sources for determining BFEs in A.
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Pollution Control: For Field Office Construction Sites.
Documenting Self Inspections The City of Hendersonville Department of Public Works Erosion Control Self Inspection Form Power Point Presentation.
City of Clarksville Storm Water Management Manual Revisions 2014.
2016 CHECKLIST PROCEDURES Level II: Introduction to Design July 2016 COMMON DEVELOPMENT GAR
Celebrating 40 years of taking care of Missouri’s natural resources. Land Disturbance and the Department of Natural Resources Tina White.
Current NPDES General Permits are available
Flood Damage Prevention Code Update
For Storm Water Discharges Associated with Construction Activity
Supervisor, RIDEM RIPDES Permitting Program
SWPPP Basics.
Storm Water Pollution Prevention Plan Development
Presentation transcript:

1 The Plan and Plan Review Issued May 2009 Level IB: Advanced Fundamentals Seminar Education and Training Certification Requirements for Persons Involved with Land Disturbing Activities

2 Introduction The Erosion, Sedimentation and Pollution Control Plan (ES&PC Plan) Plan development process Plan review process Plan review checklist Reading the plan

3 ES&PC Plan An ES&PC plan shows: a series of structural and vegetative best management practices (BMPs) to control erosion and prevent sedimentation within a disturbed area. Detailed requirements for monitoring, inspections, reporting and record keeping.

4 The Plan Development Process

5 Steps to an Effective ES&PC Plan 1.Project requirements 2.Project/resources description 3.Data collection (site visit) 4.Data interpretation 5.Plan preparation 6.Plan Review/Approval 7.Implementation 8.Operations, maintenance and inspections 9.Final stabilization

6 Project Construction Issues Project location Required pre-design site visit Project size Project type Project phasing Project schedule

7 Required Site Visit What a designer looks for: –Existing vegetation –Potential U.S./State Waters –Flood plain –Springs –Soils –Drainage basins (both onsite and offsite) –Wetlands –Other possible critical areas

8 Planning Stripping of vegetation, regrading and other development activities shall be conducted in such a manner so as to minimize erosion Cut and fill operations must be kept to a minimum Development plans must conform to topography and soil type, so as to create the lowest practicable erosion potential Whenever feasible, natural vegetation shall be retained, protected and supplemented

9 Planning Disturbed soil shall be stabilized as quickly as possible Temporary vegetation or mulching shall be employed to protect exposed critical areas during development A series of well designed, installed, and maintained best management practices (BMPs) shall be implemented to control erosion at the source and prevent suspended sediments from leaving the site

10 Planning Adequate provisions must be provided to minimize damage from surface water to the cut face of excavations or the sloping surface of fills Cut and fills may not endanger adjoining property Fills may not encroach upon natural watercourses or constructed channels in a manner so as to adversely affect other property owners Any proposed disturbance within a stream buffer must complete all necessary applications and receive all necessary approvals before beginning disturbance

11 Plan Concepts Adapt the plan to resources available When possible, fit the project into the existing terrain Recommendations must be cost effective The plan must be flexible Maintain open communication with developer, contractors and local issuing authority

12 Plan Concepts Notes and instructions must be clear and simple Timing and scheduling are very important Establish an effective maintenance program Identify critical areas offsite

13 Construction Sequencing Plan sequence with contractor Advise inspector/LIA of sequence at pre- construction meeting Evaluate sequence during implementation Make sequence revisions if necessary Resubmit revised plans for approval to LIA or local SWCD Final stabilization plan

14 What types of plan revisions require additional design and review? The onsite addition of silt fence, check dams, and other generic BMPs DO NOT require design and review (BMPs must still conform with minimum standards set forth in the Manual) Modifications and addition/removal of designed structural BMPs such as sediment basins require professional design and review and approval!

15 The Erosion, Sedimentation and Pollution Control Plan Checklists Three checklists: Stand Alone Projects Infrastructure Projects Common Developments Appendix 1 Available at

16 Updates The new checklists include all previous requirements of the June 2007 version Updated to include provisions of the new NPDES General Permits

17 Elements of the Checklist Site Plan –Site Location Information –Surveys, Maps, Soils, Hydrology Study –Delineation of State Waters and Buffers –Phasing of ES&PC Plan Narrative Notes and Other Information –Maintenance Notes –Contact Info –Signature and Seal –BMP Details –Storage Calculations –Vegetative Plan –Compliance with NPDES Permits

18 Importance of Using Checklist The designer refers to checklist before, during and after design. Obtain all necessary information and visit the site BEFORE beginning the design!!! Designers and reviewers both work on many plans and using the checklist on every set of plans will help ensure important info is not forgotten.

19 Submitting an ES&PC Plan for Review Once ES&PC plan is complete (all checklist items addressed), submit plans to local issuing authority. If the local issuing authority does not have an MOA, they forward plans to the local SWCD. Must include copy of checklist with page numbers indicating where information can be found.

20 Original Submittal Typically, there will be some form of comments during the original submittal Plans received without the signature and seal of the Design Professional will not be reviewed.

21 Second and Third Submittals By submitting a complete ES&PC plan on first submittal, plans can usually be approved on first or second submittal. Plans that have extensive comments on original submittal, typically are not approved until at least the third submittal and this can dramatically delay the permitting process.

22 Submitting an ES&PC Plan for Review In areas where there is not a certified issuing authority, 1 copy of the plan is submitted to EPD’s Watershed Protection Branch and 1 copy to the appropriate EPD District office

23 Relationship between Designers and Reviewers The Design Professional designs plans and is ultimately responsible if plans fail  Adjacent property owner’s lake impacted due to poor planning and implementation

24 Reviewer’s Role Ensure all checklist items are addressed Reviewers do more than check off checklist –Make sure plans consist of three phases with a series of sound Best Management Practices –Ensure BMPs are designed in accordance with specifications set forth in the “Green Book” –Adequate sediment storage for each drainage basin onsite –Look for stream buffer encroachments that are not going for EPD variance application

25 Relationship between Designers and Reviewers Reviewer “double checks” plan to ensure minimum requirements are met Designer should welcome reviewer’s comments and concerns

26 Reading the Plans

27 Reading the Plan A good ES&PC plan provides all the necessary information that will allow an individual to view the site plan and understand what is taking place at any given time.

28 Reading the Plan Recognize existing and proposed grading activities Evaluate topography, slope steepness and slope profiles, using given contours on plans Recognize drainage patterns and basins Check the selection, location, and effectiveness of approved BMPs as shown on plans

29 Topographic Mapping Most grading plans are based on some type of topographic map. Topographic information allows a trained viewer to see the plan in three dimensions, thus enabling the viewer to see changes in grade within the site.

30 The flow of water is always perpendicular to the contour “saddle” summit

31 Reading the Plans Perhaps, the most important aspect of reading the plans is understanding the onsite and offsite drainage patterns for pre, during and post construction conditions. –Initial plan for perimeter control and initial sediment storage –Intermediate plan for grading and drainage –Final ES&PC plan

32 The first step in identifying drainage basins within a site is to find the high and low points and determine the overall directions of flow. The ridges and valleys start to “appear” Drainage Basin Delineation

Study where the water flows

34 Drainage boundaries can then be drawn along the ridges where the flow patterns break in opposite directions. Drainage basins, also called “watersheds”, are now defined. Each basin can now be treated as a separate site

35 Scale 1” = 40 feet drainage boundary in graded area Sd3 Cd X X X X X X X X X X

36 Plans on the Site An approved set of plans must be on site at all times. Use approved plans for each inspection.

37 Questions???