ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 1 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Bruce.

Slides:



Advertisements
Similar presentations
BIS310: Week 4 BIS310: Structured Analysis and Design Feasibility Study and Business Requirements Statement -Selecting the Best Alternative Design Strategies.
Advertisements

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Laboratory 2: Introduction to AutoCAD and Microsoft Project
Mechanical Engineering Drawing and Graphics (ME 210) Term 041 Course Outline & Introduction.
Chapter 18 Working Drawings.
Technical Writing II Acknowledgement: –This lecture notes are based on many on-line documents. –I would like to thank these authors who make the documents.
EDGE™ A P D C Copyright © 2004 Dr. Edward Hensel P.E. and P.H. Stiebitz. All rights reserved. Technical Data Package & Team Notebook …what is it anyway?
Systems Engineering Management
EE496A Senior Design Project I Dr. Jane Dong Electrical and Computer Engineering.
Week 6 - Lecture Product Documentation
ENGR-11_Small_Volume_Design.pptx 1 Bruce Mayer, PE Engineering-11: Engineering Design Bruce Mayer, PE Licensed Electrical & Mechanical.
CEN Fourth Lecture Introduction to Software Engineering (CEN-4010) Instructor: Masoud Sadjadi Project Organization.
1 Mechanical Design Program AAssociate Degree FFour semesters MMix of Sketching, 2DCad, and Parametric Modeling AApplied math.
Best Practices In Design Outcomes Of A Survey P. H. King, PhD, PE Joan Walker, PhD Vanderbilt University.
Class 9_2 Next stage in design process: Testing
Course Overview Course Requirements Knowledge and Skills Student Expectations.
ENGR-11_Tank_Agitator_Design_Project.ppt 1 Bruce Mayer, PE Engineering 11 – Engineering Design Bruce Mayer, PE Registered Electrical.
Unit 2: Engineering Design Process
 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Chapter 7 Quality and Innovation in Product and Process Design.
From Research Prototype to Production
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions An Approach to Unit Delivery and Assessment.
GRAPHIC COMMUNICATION (In2 / 1) Technical Graphics 1 Technical Graphics 2 Computer Graphics + Computer Graphics Folio.
ENGR-11_Engineering_Design_Cycle_Details.ppt 1 Bruce Mayer, PE Engineering-11: Engineering Design Bruce Mayer, PE Licensed Electrical.
Chapter 4 Process Design.
Configuration Management (CM)
10/10/2015 IENG 471 Facilities Planning 1 IENG Lecture END Project Report Requirements & Project Presentation Information.
CREOCAD
Dr. Catherine Turner Assembly drawings.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
Level 2 Unit 6 Application of Manufacturing Techniques in Engineering Engineering Diploma Level 2 Unit 6 Application of Manufacturing Techniques in Engineering.
ENGR-10_Lec-19_NextStep.ppt 1 Bruce Mayer, PE Engineering-10: Intro to Engineering Bruce Mayer, PE Licensed Electrical & Mechanical.
ENGR-10_Lec-19_NextStep.ppt 1 Bruce Mayer, PE Engineering-10: Intro to Engineering Bruce Mayer, PE Licensed Electrical & Mechanical.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
ENGR-22_Lec-23_Working_Drawings-2.ppt 1 Bruce Mayer, PE Engineering 22 – Engineering Design Graphics Bruce Mayer, PE Licensed.
ENGR-11_Tank_Agitator_Design_Project.ppt 1 Bruce Mayer, PE Engineering 11 – Engineering Design Bruce Mayer, PE Registered Electrical.
GCSE Design and Technology: Product Design
1 Business Communication Process and Product Brief Canadian Edition, Mary Ellen Guffey Kathleen Rhodes Patricia Rogin (c) 2003 Nelson, a division of Thomson.
ENGR-11_Small_Volume_Design.pptx 1 Bruce Mayer, PE Engineering-11: Engineering Design Bruce Mayer, PE Licensed Electrical & Mechanical.
Systems Analysis and Design in a Changing World, Fourth Edition
ENGR-11_Computer_Enclosure_DWG_Pkg.ppt 1 Bruce Mayer, PE Engineering-11: Engineering Design Bruce Mayer, PE Licensed Electrical.
1 Lecture #1: PD - Ch 1. Introduction Ref: Product Design and Development by Karl T. Ulrich and Steven D. Eppinger, McGRAW-Hill
Request for Proposal (RFP)
ENGR-11_Tank_Agitator_Design_Project.ppt 1 Bruce Mayer, PE Engineering 11 – Engineering Design Bruce Mayer, PE Registered Electrical.
IFS310: Module 7 Business Requirements Statement Interpersonal Skills and Communications.
FAQ_Which_Courses_Should_I_Take_Chabot_Engineering_0505.ppt 1 Bruce Mayer, PEIntroduction to Engineering Bruce Mayer, PE Licensed.
ENGR-11_Tank_Agitator_Design_Project.ppt 1 Bruce Mayer, PE Engineering 11 – Engineering Design Bruce Mayer, PE Registered Electrical.
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
Electronic Drafting DFT 58A&B Cliff Monroe - Instructor.
Digital Doorbell Team 2 Tyler Blaker, Mike Woessner, Jose Pina, Bill Kessler, Jesse Yanik, Justin Bayham, Brandon Roberts, Mike Goggins, Ralph Voltz.
ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 1 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Bruce.
Livingston High School
Spring CS-EE 481 Lillevik 481s07-l2 University of Portland School of Engineering Senior Design Lecture 2 Technical staff Prototype phase: DEP, TOP.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
Technical Report Outline Title Page Frontispiece Abstract Table of Contents List of Figures/ List of Tables.
1 JEOPARDY! Version 2005: Review for IED 2 Design Process Sketching Visualization Geometric Relations Modeling $100 $200 $300 $400 $500 Presentations.
ENGR-11_CrDR_Tank_MockUp.ppt 1 Bruce Mayer, PE Engineering 11 – Engineering Design Bruce Mayer, PE Registered Electrical & Mechanical.
TMP3413 Software Engineering Lab Lab 01: TSPi Tool Support.
Matls-Lab_Cantilever_Beam_Fixture.ppt 1 Bruce Mayer, PE Engineering & Engineering-Technology: Materials of Engineering Bruce Mayer,
Fall 2006P7305: Freshman Practicum AM Receiver P7305: Learning Module for EE Freshman Practicum Chris Urban: Lead Engineer Hans-Christian Rotmann: Project.
Subsystem Build & Test Review
Chapter 2 Design Tools.
MT 293 Parametric Computer Aided Design.
Introduction to New Product Development (Portfolio)
Understanding Standards Art and Design (Higher)
Concept Generation: ID-3D Design’s Initial enclosure concepts are generated based on specifications, requirements and preferences from the client as well.
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Working Drawings Chapter 12.
Team P16228: Magnetically Levitated Propeller
Assembly drawings Flóra Hajdu B406
PDT176 COMPUTER-AIDED DRAFTING CHAPTER 6 WORKING DRAWING
Presentation transcript:

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 1 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Bruce Mayer, PE Registered Electrical & Mechanical Engineer Engineering 10 - ENGR11 Preview - Tank Agitator Design Project

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 2 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Dilbert Design

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 3 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Pls Consider Taking ENGR11 in Sp11 ENGR 11 Engineer Design and Analysis 2.00 Units An introduction to the engineering design process from a practical and professional perspective. Student teams work on a term-long engineering project that entails the creation of a design for a useful object with moving parts that require the application of some external power source. Conceptual and Critical/Final design reviews require teams to describe and justify the effectiveness, and likely customer-acceptance, of the design. The student designer: select materials, components, sources of supply; produce detailed estimate for the production-cost. When needed students use engineering software tools (such as MATLAB) to assess and predict the kinematic, structural, thermal, electrical, fluid-flow, wear/corrosion, and magnetic performance of the proposed design. Students are encouraged to build from the design plans a form- and-fit mock-up, or if possible a fully functioning prototype. Strongly recommended: Engineering 22. ← Really Good to Take at the SAME time

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 4 Bruce Mayer, PE Engineering 10 – Introduction to Engineering ENGR[10+11] Xfers to SJSU & UCB  The COMBINATION of Chabot’s ENGR10 & ENGR11 Transfer DIRECTLY as SJSU’s & UCB’s “ENGR10” courses

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 5 Bruce Mayer, PE Engineering 10 – Introduction to Engineering ENGR11 Emphasis  Creativity  Recall from Study Skills Lecture: Engineering Requires Two Somewhat Contradictory Skills 1.Creativity to BEGIN the Practical Product Creation/Design Process 2.Attention to Detail & Analysis to COMPLETE the Practical Product-Realization Process  ENGR[25, 36, 43, 45] Emphasis is Analytical Problem Solving  ENGR11 Emphasis is Creative Problem Solving

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 6 Bruce Mayer, PE Engineering 10 – Introduction to Engineering General Design Cycle/Process  Students Implement this Design Process in ENGR11 by way of Design Teams

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 7 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Design Goal  Design a 24/7 “Wave-Like” Agitation System for a TidePool Culture Tank in a Marine Biology Lab

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 8 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Design Requirements Must Run Unattended and Automatically 24 hrs/day, 7 days/wk 2.Power Sources Available 115 Vac, 15 Amp Electricity (1725 W) 100 psig, 5 cfm Compressed Air (1630W) 3.Gentle, Back-and- Forth Surface Agitation to Approximate Waves Breaking over an Exposed Tide Pool

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 9 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Design Requirements Wave Period = seconds 5.Tank Size in feet = 2W x 3L x 1D 6.Must Resist Sea Water Corrosion 7.Low Cost → $500 Budget 8.Must be Easy to Install and Uninstall (Biologists will use it) Tools Available Basic Mechanical, Plumbing, and Wiring Hand-Tools Hand Power Drill Reciprocating Saw (a.k.a. “SawzAll”)

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 10 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Design Requirements FULL Set of CAD (AutoCAD or SolidWorks) Design and Fabrication Documents Fabrication Dwgs for Machined Parts –Material Callout and Finish –Full Dimensioning Assembly Drawing –Views and Basic Instructions for Assembly –Bill of Materials with Part Numbers Electrical/Pneumatic Schematics 10.Project Management Sources of Supply and Catalog No.s for purchased Parts

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 11 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Design Requirements Project Management cont. Projected Cost excluding Assy –Cost for Machine Parts from Chabot Machine Tool Technology Instructors A. Long & M. Absher –Purchase Parts from Supplier Catalog or Price-Quote 11.Design Analysis & Literature Research Pro’s & Cons of Alternative Designs Safe Operation – Mech. & Elect. Force Load Analysis (statics) Corrosion Resistance Possible Failure Modes (FMEA)

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 12 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Design Requirements Extra Credit Milestone Schedule or PERT Chart GDT Dimensioning –Must be able to EXPLAIN it Written Assy & Test Procedures MockUp or Working-Prototype User Manual

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 13 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Design Presentations  Assumes 4 Member Teams: M1 → M4  Presentations Last min Two Members Team Up for Presentation –Must Divide Presentation Approx. Equally  Formal Presentations (as would be given to Management or Customers) Done Using POWERPOINT Professional APPEARANCE (dress UP)  FollowUp → Write Action Item List WHO will do WHAT by WHEN

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 14 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Design Presentation - CDR  CONCEPTUAL Design Review (CDR) By Team Members M1 & M2 Describe Alternatives Considered –Why the Selected Alternative?  Identify Risks Concept Drawings and Sketches Likely Materials ROUGH $-Cost Estimate Team Member Assignments → Division of Project Effort

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 15 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Design Presentation - CrDR  CRITICAL Design Review (CrDR) By Team Members M3 & M4 Detailed Layout and Schematics Engineering Physical Analyses –Force/Loading –Corrosion/Wear –Energy/Power Materials & Component Selection 90+% Accurate $-Cost Estimate

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 16 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Design Presentation - CrDR First-Cut Drawing Package –Parts, Assy, Schematic –Bill of Material With Part Numbers –Sources of Supply for Purchase Parts  Phone Numbers of Suppliers  Catalog Number for Purchase Parts FINAL Cost Estimate to ±5% Demonstrate (INSTALL on Tank MockUp) –Non-Working MockUp (Std extra credit) –Working ProtoType (High extra credit)

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 17 Bruce Mayer, PE Engineering 10 – Introduction to Engineering AutoCAD Tank Template Template Posted to WebPage SeaWater_Tank_Template_E _BMayer_ DWG

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 18 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Labor & Materials Estimates  For Parts Designed by the STUDENT, the Part-Cost will NOT be published.  Instead the Designer must solicit from Fabricators ESTIMATES or QUOTATIONS for the Cost to Fabricate the Parts  Material-$ Estimates Find Materials Costs on the InterNet  Production Labor-$ Estimates Call Fab Shops See During Office Hours MTT instructors –Mr. Ashley Long –Mr. Mike Absher See B. Mayer –Last Resort

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 19 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Design Resources  Good Component Catalogs McMaster-Carr (the best) Graingers (Motion Generators – motors) Omega Engineering (Sensors) Newark Electronics (Electrical Elements) PIC Design (Mechanical Elements) Cajon/SwageLok (plumbing & valves) Bimba (Motion Generators – Pneumatic Linear Actuators)

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 20 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Example Schedule ItemStartFinishTask/MileStone Description 1Wk-01Wk-02UnderStand Functional Requirements 2Wk-02Wk-03Form Team 3Wk-02Wk-04BrainStorm Solutions, Select 2-3 for Feasibility Assessment 4Wk-04Wk-05Concept Feasibility Analysis (Pros & Cons); Select Best Concept 5Wk-05Wk-06Select Source-of-Motion; Finalize: Agitator Concept, Mtg to Tank 6Wk-06Wk-08Make AutoCAD Layout, Find Supplier for Source-of-Motion 7Wk-07Wk-08Prep for CONCEPTUAL Design Review – Ref. CDR ScoreSheet 8Wk-08 CONCEPTUAL DESIGN REVIEW (CDR) PowerPoint Presentation 9Wk-09 Iterate on Design based on CDR “Post Portem” Review 10Wk-10Wk-14Detail-Design and Formal ACAD dwgs for “Piece Parts” 11Wk-10Wk-14Research Suppliers and Select Purchased-Parts; Need Cat. No.s 12Wk-12Wk-15Construct Accurate and Complete Bills of Material 13Wk-12Wk-15Determine Manufacturing Methods, Collect Cost Data 14Wk-12Wk-15Detail-Design and Formal ACAD dwgs for SubAssys & FinalAssy 15Wk-15Wk-16Prep for CRITICAL Design Review – Ref. CrDR ScoreSheet 16Wk-17 CRITICAL DESIGN REVIEW (CDR) PowerPoint Presentation xtraWk-10Wk-17Build, Assemble, Test, and Demonstrate ProtoType HardWare

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 21 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Weekly Reports  Each TEAM will submit a Weekly Report (WkRpt) on the Dates Listed in the Course Schedule Suggest Team Members Alternate Writing the Reports  Report Form → Chabot_Engineering_Weekly_Report_T emplate_0906.doc Posted to WebPage

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 22 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Weekly Reports  Report Length → 1-2 pages Appendices NOT included  Report Content Two Required §’s → –Previous Week Accomplishments –Plans for Next Week Optional § → Appendix (or Appendices)  Example Posted on WebPage Weekly_Report_Example_BMayer...doc

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 23 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Design Project “Deliverables” No.DescriptionTemplate or ExampleNotes and/or Comments 01 Fabricated-Part AutoCAD Drawings Chabot_TitleBlock_D_BMayer_ DWG DWGs 96755[3-8] 41 in CaseStudy PPT-file BoM is ONE item; the Primary Material of construction 02 SUBassembly AutoCAD Drawings (if Used) Chabot_TitleBlock_D_BMayer_ DWG DWG in CaseStudy PPT-file BoM is multiple parts; can be either ON-DWG or Separate document 03 FINAL Assembly AutoCAD Drawing(s) Chabot_TitleBlock_D_BMayer_ DWG DWG in CaseStudy PPT-file BoM MUST be a Separate document 04 Electrical and/or Plumbing Schematic Drawing(s) Chabot_TitleBlock_D_BMayer_ DWG DWG in CaseStudy PPT-file Listed on Final Assembly BoM as a REFERENCE Items 05 SUBassembly Bill(s) of Material (if Used) BoM_PartsList_Template_BMayer_0906.xls _BoM_Drive_Cage_Assy_BMayer_1002.xls Use Columns A-D in BoM Template 06 FINAL Assembly Bill(s) of Material (if Used) BoM_PartsList_Template_BMayer_0906.xls _BoM_PartsList_Example_BMayer_0906.xls FINAL assembly BoM MUST be done in spreadsheet form Use Columns A-D in BoM Template 07ESTIMATED CostBoM_PartsList_Template_BMayer_0906.xlsSum Column-F in the BoM Template 08 Purchased-Part and Supplier Log Engineering_Design_Purchase_Part_Log_ Example_BMayer_0906.xls Students to DESIGN Purchased- Part Numbering system 09AutoCAD Drawing Log Chabot_Engineering_Drawing_Log_ Example_BMayer_0906.xls Students to DESIGN Drawing Numbering system

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 24 Bruce Mayer, PE Engineering 10 – Introduction to Engineering ENGR11 ProtoType Testing

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 25 Bruce Mayer, PE Engineering 10 – Introduction to Engineering ENGR11 ProtoType Testing

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 26 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Engineering vs Industrial Design  ENGINEERING Design makes things that DO what they’re Supposed to (Function Properly) ALWAYS Work (NEVER Break → Reliable) Are $COST-EFFECTIVE (Affordable to Customers → Meets $Budget )  INDUSTRIAL Design makes things that LOOK COOL (Appealing/Attractive Aesthetic) Are EASY to USE (User-Friendly)

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 27 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Engineering Design

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 28 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Engineering Design

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 29 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Industrial Design

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 30 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Chabot  MTT50 MTT 50 Blueprint Read / Sketch & CAD 3.00 Units Fundamentals of freehand sketching, reading of blueprints, interpreting of commonly used symbols, pictorial drawings, orthographic projection, geometric construction, dimensioning, and sectioning. Includes a general approach to Computer Aided Drafting (CAD). Focus on subject matter relevant to Machine Tool Technology and Industrial Technology applications and local industry requirements. Designed to provide a working knowledge of methods of graphical communication.

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 31 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Mechanical HandsOn  MTT70 MTT 70 Introduction to Machine Shop 2.00 Units (Summer) Introduction to machine shop practice. Includes measuring tools, benchwork, screw threads, drill presses, lathes, and vertical milling machine operations. Safe and correct use of machine tools.

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 32 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Electrical HandsOn  ESYS51 ESYS 51 Fabrication Techniques 2.00 Units Prototype development includes sheet metal, printed circuit board layout and fabrication, connection and soldering techniques, use of hand tools, and machines in electronic fabrication. Use of computer software tools

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 33 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Bruce Mayer, PE Licensed Electrical & Mechanical Engineer Engineering 11 Appendix MileStone Schedules

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 34 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Design Reviews  Functional Requirements Review (FRR). The purpose of the FRR is to review the functional requirements specification document, to ensure the documented requirements reflect the current knowledge of the customer and market requirements, to identify requirements that may not be consistent with product development constraints, and to put the requirements document under version control to serve as a stable baseline for continued new product development.  Conceptual Design Review (CDR). The purpose of the CDR is to review the conceptual design to ensure that the planned technical approach will meet the requirements.  Critical Design Review (CrDR). The purpose of the CrDR is to review the detailed design to ensure that the design implementation has met the requirements  Final Design Review (FDR). The purpose of the FDR is to ensure that the design is completely and accurately documented and ready for formal release to manufacturing.

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 35 Bruce Mayer, PE Engineering 10 – Introduction to Engineering GS 3 Visit – Dec00 Mr. W. A.B. Mayer PC030053aThe S2 investigators pose in front of their subject at the conclusion of the inspection. Mr. W. A. on Left. Bruce Mayer on right. Circa Dec00.

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 36 Bruce Mayer, PE Engineering 10 – Introduction to Engineering S2 Team Inspect Primary Power Box (PPB) Mr. Y. K. Mr. I. A. Mr. A. N. Mr. Y. N. Mr. H. T.

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 37 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Full S2/S8/CE Compliance – Detailed Schedule Ref. BMayer file 3100_S2S8CE_0109.mpp

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 38 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Full S2/S8/CE Compliance – Detailed Schedule

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 39 Bruce Mayer, PE Engineering 10 – Introduction to Engineering 2100 ß-System: Pre Shipment Testing

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 40 Bruce Mayer, PE Engineering 10 – Introduction to Engineering 2100 ß-Site Schedule

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 41 Bruce Mayer, PE Engineering 10 – Introduction to Engineering 2100 ß-Site Schedule

ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 42 Bruce Mayer, PE Engineering 10 – Introduction to Engineering 2100 ß-Site Schedule ON-Semi_2100_0109_DWG.mpp