RockSat-C 2012 CoDR Zero Tilt Conceptual Design Review Frostburg State University Michael Stevenson, Mayowa Ogundipe, Subhasis Ghosh, Andrew Huntley, Derek.

Slides:



Advertisements
Similar presentations
Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
Advertisements

2012 CoDR CoDR Mission Statements RocketSat 8 shall integrate and validate the Roll Out De-Orbiting Device (RODEO) developed by Composite Technology.
Full Mission Simulation Report Temple University Fred Avery, Gene Council, Ny’Jaa Bobo, Salvatore Giorgi, Jay Shukla 4/21/12.
RockSat-C 2012 CoDR Minnesota Sound Wreckers Conceptual Design Review University of Minnesota Alexander Richman Jacob Schultz Justine Topel Will Thorson.
U of MN student team members Kyle Marek-Spartz (team lead), Seth Frick, Cait Mantych, Mary Pattison, Alana Gedrose, Alex Knutson-Smisek, Philip Hansen,
Proposal Analysis Review NMSGC Student Launch University/Institution Team Members Date.
Flight Readiness Review New Mexico Space Grant Consortium University/Institution Team Members Date.
Frostburg State University Adam Rexroad, Brett Dugan, Mayowa Ogundipe, Kaetie Combs, Michael Stevenson, Daniel Gares, Tyler Lemmert, Subhasis Ghosh, Jared.
Charles Galey, Peter J. Jay, Nicholas Roder, William Ryan.
DYNAMO TEAM 2 CAREFUL HARRY CONCEPTUAL DESIGN REVIEW GLENDA ALVARENGA J.J. BUSSE EMILY EGGERS ADAM KEMP GABRIELLE MASSONE DALTON SMITH COREY WILSON SEPTEMBER.
Rock it rocke Temple University
University of Wyoming Michael Stephens, Eric Robinson, Alex Antonacci, Andrew Hellquist, Joe Backstrom, Bryan Overcast, Jeffrey Watters, Jonathan Melton,
MinnSpec Conceptual Design Review University of Minnesota / Augsburg College Douglas Carlson (Overall Team Lead), Bryce Schaefer (MinnRock II), Chris Woehrle.
Eric Marz Joe Mozloom Swati Maini Linda Mclaughlin Swapnil Mengawade Advisor: Jin Kang, PhD June 22, 2011 Drexel University RockSat1.
RockSat-C 2012 SITR Full Mission Simulation Report University/Institution Team Members Date.
Joe Mozloom Eric Marz Linda McLaughlin Swati Maini Swapnil Mengawade Advisor: Jin Kang, PhD.
Preliminary Design Review Northwest Nazarene University Advisor: Dr. Lawrence Chad Larson Ben Gordon Seth Leija David Vinson Zach Thomas Drew Johnson.
RockSat-C 2011 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
University of Wyoming Charles Galey, Nicholas Roder, Peter J. Jay, William Ryan 10/14/
RockSat-C 2011 ISTR Payload Subsystem Integration and Testing Report Universities/Institutions Team Members Date.
2012 CoDR Nitric Oxide and Piezo Dust Detector Probe Conceptual Design Review Virginia Tech Presented by Stephen Noel November 18,
Good Vibrations Conceptual Design Review University of Wyoming James Richey, Justin Thornton, Luke Voss, Jake Thatcher, Tony Allais Oct 27, 2008.
Rock Sat-C Conceptual Design Review The New Jersey Space Grant Consortium at Stevens Institute of Technology and Rutgers University Mike Giglia, Ethan.
Space Cowboys. Mission Overview Objective – Accurately measure flight parameters including ambient and skin temperatures, pressure, acceleration, spin.
2011 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
Frostburg State University Brett Dugan, Adam Rexroad, Kaetie Combs, Michael Stevenson, Daniel Gares, Mayowa Ogundipe, Tyler Lemmert, Jared Hughes, Sean.
University of Wyoming Dorin Blodgett, Kevin Brown, Heather Choi, Ben Lampe Eric Robinson, Michael Stephens, Patrick Weber October 7,
SloshSAT Conceptual Design Review Dr. Robert Walch Sage Andorka Dan Welsh Zach Sears Maurice Woods III Motoaki Honda Ryan Estrick 14 Oct
NORTHWEST NAZARENE UNIVERSITY CHAD LARSON, BEN GORDON, DAVID VINSON, SETH LEIJA, ZACH THOMAS, DREW JOHNSON NNU Team Conceptual Design Review.
RockSat-C 2011 CoDR Harding Flying Bison ROCKSAT-C Team Conceptual Design Review Harding University Ed Wilson, Mentor, Will Waldron, Student 2, Student.
RockSat-C 2011 CoDR CSU RocketSat-C Conceptual Design Review Colorado State University Isaiah Franka Jordan Rath Abby Wilbourn Mike Yeager 10/1/10 1.
Conceptual Design Review Metro State College of Denver Daniel Bass, Matt Hanley
(PDR ) University of Northern Colorado Nathan and Casey 11/14/08.
Critical Design Review Team Name University/Institution Team Members Date.
RockSat-C 2012 ISTR Individual Subsystem Testing Report Zero Tilt Frostburg State University Kaetie Combs, Francisco Diaz, Sean Hughes, Jared Hughes, Andrew.
2014 CDR Team Name Critical Design Review CDR CDR Delieverables 1.Mechanical drawings in pdf format 2.Electrical schematics in pdf format 3.Completed.
CanSat Interim Presentation II
DemoSat IV Critical Design Review Metropolitan State College of Denver April 21, 2006.
MINNROCK CONCEPTUAL DESIGN REVIEW University of Minnesota William Ung Scott Balaban Tom Thoe Bryce Doug Carlson 11/14/2008.
Disturbance Rejection: Final Presentation Group 2: Nick Fronzo Phil Gaudet Sean Senical Justin Turnier.
Critical Design Review Team Name University/Institution Team Members Date.
MinnRock Design and Canister Layout Team members Bryce Schaefer (team coordinator)- AEM Cameron Japuntich- AEM Liz Sefkow- ME Mitch Andrus-
The BRASS Project University of North Dakota Matthew Voigt Nathan Ambler Ron Fevig John Nordlie Tim Young Nirmal Patel (University of North Florida) Baike.
RockSat-C 2011 ISTR Individual Subsystem Testing Report WVU Rocketeers West Virginia University 2/14/ Team Members Justin Yorick Ben Provence Mike.
RockSat-C 2012 SITR Full Mission Simulation Report Harding University William Waldron, Joshua Griffith, Drew Cancienne, Edmond Wilson, David Stair 22 April.
ACES Spring 2003 Overview Where are we going? How are we going to get there?
RockSat-C 2012 SITR Full Mission Simulation Report University of Minnesota Alexander Richman Jacob Schultz Justine Topel Will Thorson 4/23/2012.
Team Magnaritaville Conceptual Design Review Zachary Cuseo, Andrew Fruge, Shweta Maurya, Sydni Smith, Christopher Nie, Tyler Knappe 9/22/09 Fall 2009 Rev.
DemoSat IV: Metro Triple Threat Metropolitan State College of Denver Matt Hanley David Fifield Jason Igo Evan I Spitler Devlin Thyne Matt Hanley David.
Haripriya Head, Integration Team Pratham, IIT Bombay 19 th June, 2010.
MNROCK CONCEPTUAL DESIGN REVIEW University of Minnesota William Ung Scott Balaban Bryce Schaefer Tom Thoe 11/3/2008.
2013 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
RockSat-C 2013 FMSTR Full Mission Simulation Report University/Institution Team Members Date.
Section 1: Mission Overview Mission Statement Mission Objectives Section 2: The Payload! User’s Guide Compliance Beta Prototype Testing Section 3: Check-In.
Temple University Advisors: Dr. John Helferty & Dr. Chang-Hee Won Charles Wright Jinyan Chen Billy Cheng Brittany Gray 1.
2014 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
Preliminary Design Review Metro State College of Denver Matthew Hanley, Daniel Bass 14 November 2008.
Tethered Aerostat Program Concept Design Review Team Name Conceptual Design Review University/College Team Members Date.
Tethered Aerostat Program Concept Design Review College of Menominee Nation Conceptual Design Review College of Menominee Nation Marilyn Madosh, Larry.
2016 PDR Team Name Preliminary Design Review University/Institution Team Members Date 1.
RamRack Conceptual Design Review Colorado State University Zach Glueckert Christopher Reed Timothy Schneider Brendan Sheridan Christina Watanuki Advisor:
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
RockSat-C 2013 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
Planetary Lander PDR Team Name
Team Name Preliminary Design Review
Sounding Rocket PDR Team Name
Sounding Rocket CDR Team Name
Team Name Conceptual Design Review
Team Name Conceptual Design Review
<Your Team # > Your Team Name Here
Presentation transcript:

RockSat-C 2012 CoDR Zero Tilt Conceptual Design Review Frostburg State University Michael Stevenson, Mayowa Ogundipe, Subhasis Ghosh, Andrew Huntley, Derek Val-Addo, Jared Hughes, Sean Hughes, Daniel Gares, Tyler Lemmert, Kaetie Combs October 3,

RockSat-C 2012 CoDR Mission Overview Mission Statement: Zero Tilt’s goal is to provide, for the first time, a stable environment throughout the flight of a Sounding Rocket via two concurrent objectives: ◦ Tilt correction system ◦ Despun platform system 2

RockSat-C 2012 CoDR Mission Overview We plan to: ◦ Counteract the platform spin ◦ Orient the platform parallel to the earth’s surface at all times ◦ Confirm the altitude reading using an accelerometer on our platform We expect to prove that it is possible to correct spin, tilt, and determine the altitude based upon a level reference. This could benefit any scientific experiment that requires stabilization in order to collect data. 3

RockSat-C 2012 CoDR Mission Overview: Theory and Concepts The underlying theory and concepts:  negative feedback control systems  concepts of torque and centripetal force  Micro electromechanical systems (MEMS)  Electromagnetic field theory  Real-Time Systems Theory (for multi-tasking) 4

RockSat-C 2012 CoDR Past Research Drexel University’s 2011 project incorporating a despun platform. The Results have not been published but the CDR offered evidence of successful trial runs at large stress. We plan to elaborate on Drexel’s design. Modifying and improving the despun platform design in our project. 5

RockSat-C 2012 CoDR Mission Overview: Mission Requirements Mission Objectives:  Counter the spin of the rocket during flight.  Keep a level surface to earth using our conceptual design.  Prove successful by comparing the acceleration data from our zero tilt platform with that from the plate. Minimum success criteria  Our main goals as the Zero Tilt team is to receive results indicating that we achieved zero tilt and confirming the altitude. 6 crestock.com

RockSat-C 2012 CoDR Mission Overview: Expected Results What we expect:  Determine whether we were successful in keeping our platform level based on data analysis. (within a 10°tolerance)  Find altitude within a reasonable tolerance again based on the data we collect. 7

Zero Tilt ConOps t ≈ 1.3 min Altitude: 75 km t ≈ 15 min Splash Down t ≈ 1.7 min Altitude: 95 km -G switch triggered -All systems on -Initialize despin system -Initialize zero tilt system based on magnetometer. t = 0 min t ≈ 4.0 min Altitude: 95 km Apogee t ≈ 2.8 min Altitude: ≈115 km t ≈ 4.5 min Altitude: 75 km t ≈ 5.5 min Chute Deploys -use the position of the zero tilt plate as initial value for the gyroscope sensor. -switch to gyro input for zero tilt system.

RockSat-C 2012 CoDR Component Overview We will be using the three axis high G accelerometers that the RockON plates used. Improved AVR comparable to the one previously used. Novel design for Tilt removal. A despinning concept similar to previous projects will be used  This will provide a stable reference to remove tilt. Gyroscope Sensor  Sampling Frequency 2000 SPS  Error < 1% Magnetometer  ±1100 µT or 11 Gauss  2000 samples/second 9

RockSat-C 2012 CoDR Our Preliminary Design 10 Motor and gear tan to rotating axle.. Intial design for holding Zero tilt platform. Despun platform processor and gyroscope. Servo motor attached to shaft.. Zero Tilt processor, magnetometer, and gyroscope. Power Sources: on plate and under Zero tilt platform.

RockSat-C 2012 CoDR Zero tilt platform conceptual reference 11

Electrical Layout of Tilt Platform 12 Gyroscopes Microcontroller Accelerometer Tilt Servo Spin Servo Flash Memory G Switch RBF Switch Power

Electrical Layout of Despun Platform 13 Microcontroller Accelerometer Gyroscopes Motor with tachometer for feedback Motor controller Power G Switch RBF Switch

RockSat-C 2012 CoDR 14 Initial Conceptual View

RockSat-C 2012 CoDR 15 Tilt Mechanism Demonstration

RockSat-C 2012 CoDROrganization 16 Team Organizational Chart GroupsMembers Zero Tilt Design GroupMayowa Ogundipe (programming, circuit schematics) Jared Hughes (magnetometer initialization) Michael Stevenson (gyroscope initialization, circuit schematics) Mayowa Ogundipe (programming, control systems) Andrew Huntley (programming, schematics) Derek Val-Addo (programming, schematics) Sean Hughes (motor, gear ratios, physical layout) Subhasis Ghosh (servo motors, physical layout) Daniel Gares (Total Design compilation-mechanics) Tyler Lemmert (Total Design compilation-mechanics) Kaetie Combs(Project Management, Design)

17 Our Tentative Schedule/RockSat Schedule 7/26/2011 RockSat Payload User‘s Guide Released 9/9/2011 Deadline to submit Intent to Fly Form 9/12/2011 Start Tutorials on RockOn Project and Launch 9/14/2011 Initial Down Selections Made 10/3/2011 Finish Tutorials on RockOn Project and Launch 10/3/2011 Start Identifying Electronics Including Processors and Sensors 10/3/2011 Conceptual Design Review (CoDR) Due 10/4/2011 Conceptual Design Review (CoDR) Teleconference 10/10/2011 Start Wireless Sensor Networks/Complete Design/Build and Test Cct 10/17/2011 Earnest Payment of $1,000 Due 10/17/2011 Online Progress Report 1 Due 10/26/2011 Preliminary Design Review (PDR) Due 10/27/2011 Preliminary Design Review (PDR) Teleconference 11/14/2011 Online Progress Report 2 Due 11/28/2011 Start Testing 11/30/2011 Critical Design Review (CDR) Due 12/1/2011 Critical Design Review (CDR) Teleconference 12/12/2011 Last Day of the Fall Semester 1/9/2012 Final Down Select—Flights Awarded

18 Our Tentative Schedule/RockSat Schedule 1/25/2012 First Day of the Spring Semester 1/30/2012 Online Progress Report 1 Due 2/3/2012 First payment due 2/13/2012 Individual Subsystem Testing Reports Due 2/14/2012 Individual Subsystem Testing Reports Teleconference 3/12/2012 Online Progress Report 2 Due 4/2/2012 Payload Subsystem Integration and Testing Report Due 4/2/2012 Payload Subsystem Integration and Testing Report Teleconference 4/6/2012 Final payment due 4/15/2012 RockSat Payload Canisters Sent to Customers 4/23/2012 First Full Mission Simulation Test Report Presentation Due 4/24/2012 First Full Mission Simulation Test Report Presentation Telecon 5/7/2012 Weekly Teleconference 4 5/14/2012 Weekly Teleconference 5 5/21/2012 Weekly Teleconference 6 5/28/2012 Launch Readiness Review Presentations 5/29/2012 Launch Readiness Review (LRR) Teleconference 6/4/2012 Weekly Teleconference 7 (FMSTR 2) 6/11/2012 Weekly Teleconference 7 6/6/2012 Weekly Teleconference 8 (LRR) 6/10/2012 Weekly Teleconference 9 6/ Visual Inspections at Refuge Inn 06-(15-18)-2012 Integration/Vibration at Wallops 6/20/2012 Presentations to next year‘s RockSat 6/21/2012 Launch Day

RockSat-C 2012 CoDRManagement 19 Monetary budget: 2000 for Equipment 7000 for capsule Team mentors: Adam Rexroad (RockOn participant) Brett Dugan (RockOn participant) Team Advisor: Dr. Eltayeb (Faculty)

RockSat-C 2012 CoDRConclusion Zero Tilt’s goal is to provide a stable environment throughout the flight of a Sounding Rocket for future experimentation. Our main concern at the outset is the implementation of the RBF jumper on our tilt platform. Plan for where you will take your design from here? ◦ We need to investigate initial conditions for our tilt gyroscope ◦ Our plan is to use the magnetometer to set initial conditions but we need to research the feasibility of this further. ◦ We look forward to presenting our preliminary design in the next month. 20