US ITER Diagnostics ITPA10 Moscow April 13, 2006 Presented by David Johnson US ITER Project Activities –Near-term priorities and plans –US diagnostic packages.

Slides:



Advertisements
Similar presentations
Testing Relational Database
Advertisements

ITER Port-Plug Engineering
David Johnson Diagnostics Team Leader
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
ITPA-10, April 12, Moscow, Russia. A. Litnovsky et al. Discussion on first mirrors. Discussion on first mirrors 1 Although a sound progress has been.
Coordinated Competitive Regional Renewable Power Procurement New England States Committee on Electricity May 16, 2013 Massachusetts Wind Working Group.
FES International Collaboration Program: Vision and Budget Steve Eckstrand International Program Manager Office of Fusion Energy Sciences U.S. Department.
DOE Neutrino Program Plans
Pathology Programme News 27 th March 2009 National Pathology Programme Board The Pathology Modernisation Project will formally conclude on 31 st March.
IT Strategic Planning Project – Hamilton Campus FY2005.
A database-driven tool to create items, variables and questionnaires NEPS Metadata Editor.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
Fundamentals of Information Systems, Second Edition
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
MCNP/CAD Activities and Preliminary 3-D Results Mengkuo Wang, T. Tautges, D. Henderson, and L. El-Guebaly Fusion Technology Institute University of Wisconsin.
ENERGY ONLY RESOURCES & THE RPS CALCULATOR. Deliverability Overview Most resources procured to date have been procured to be fully deliverable – CAISO.
APPLICATION: The first real application of the CAD-MCNP coupling approach is to calculate the neutron wall loading distribution (Γ) in the Z and toroidal.
Page - 1 Rocketdyne Propulsion & Power Role of EASY5 in Integrated Product Development Frank Gombos Boeing Canoga Park, CA.
I-Web Documentation Part VI – Work Items FACILITY CONDITION SURVEY TEAM Steve Oravetz PE, R1 (Team Leader) Bruce Crockett, R1 Randy Warbington PE, R8 Jim.
What is Business Analysis Planning & Monitoring?
1.Database plan 2.Information systems plan 3.Technology plan 4.Business strategy plan 5.Enterprise analysis Which of the following serves as a road map.
SIP working group status Keith Drage, Dean Willis.
Page 1 MODEL TEST in the small GENERALIZE PROGRAM PROCESS allocated maintenance changes management documents initial requirement project infrastructure.
ATTILA* Deterministic Code (Status and plans for validation)
Employability skills workshop This work has been produced on behalf of the National Quality Council with funding provided through the Australian Government.
1 This workshop is part of our commitment to periodically provide you with updated information about BPA’s contracting and project management processes.
Measurement Requirements and Assessment of Measurement Capability David Johnson, Réjean Boivin, Ken Young.
David Adams ATLAS ATLAS Distributed Analysis David Adams BNL March 18, 2004 ATLAS Software Workshop Grid session.
Expanding the Accessibility and Impact of Language Technologies for Supporting Education (TFlex): Edinburgh Effort Dr. Myroslava Dzikovska, Prof. Johanna.
Ottó Bede TBM Consortium Meeting, Brasimone ITER PPE Goal Oriented training program RST meeting 17th January 2011, Cadarache, France József.
Status and Plans Transport Model Validation in ITER-similar Current-Ramp Plasmas D. R. Mikkelsen, PPPL ITPA Transport & Confinement Workshop San Diego.
Management & Development of Complex Projects Course Code MS Project Management Perform Qualitative Risk Analysis Lecture # 25.
US ITER UFA Meeting APS-DPP Savannah, GA Ned Sauthoff (presented by Dale Meade) November 15, 2004 US In-kind Contributions and Starting Burning Plasma.
Hutch Neilson Princeton Plasma Physics Laboratory Stellarator Team Meeting 3 March 2011 Stellarator Program Update.
Accelerating Scientific Exploration Using Workflow Automation Systems Terence Critchlow (LLNL) Ilkay Altintas (SDSC) Scott Klasky(ORNL) Mladen Vouk (NCSU)
HTPD ITER Satellite Meeting 1April 22, 2004 Proposed US Role in ITER Diagnostics David Johnson, PPPL.
CHECKPOINTS OF THE PROCESS Three sequences of project checkpoints are used to synchronize stakeholder expectations throughout the lifecycle: 1)Major milestones,
The european ITM Task Force data structure F. Imbeaux.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Assessing the influence on processes when evolving the software architecture By Larsson S, Wall A, Wallin P Parul Patel.
LCG LHC Computing Grid Project – LCG CERN – European Organisation for Nuclear Research Geneva, Switzerland LCG LHCC Comprehensive.
Formulating a Simulation Project Proposal Chapter3.
1 Lecture #1: PD - Ch 1. Introduction Ref: Product Design and Development by Karl T. Ulrich and Steven D. Eppinger, McGRAW-Hill
U.S. Department of Energy’s Office of Science 20 th Meeting of the IEA Large Tokamak ExCo, May th Meeting of the IEA Poloidal Divertor ExCo, May.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
Taming Development and Data Chaos in Military Logistics: The ICIS Experience With Lightweight Languages Gary Kratkiewicz BBN Technologies Geoffrey Knauth.
REPORTING, ANALYSIS AND PLANNING SYSTEM RAPS Budgeting User Forum April 13, 2011.
[Idea Title] [Name of EERE program/office] FY11 Idea Summit [DATE]
Chapter 6 CASE Tools Software Engineering Chapter 6-- CASE TOOLS
ITPA12 Diagnostics - PPPL - 3/26-30/07 1 US ITER Project Plans David Johnson Diagnostics Team Leader March 26, 2007 ITPA12 Design Basis US Scope Port Plugs.
Summary CDBM IMAGE meeting, 07 IMAGE SUMMARY IMAGE set up to provide a venue for discussion between the different Integrated Modelling (IM) activities.
TPB Structure St.. Petersburg NEXT STEPS IN PROCESS Approach identified participants to ensure they are willing/able to participate Section coordinators.
12th Mttg ITPA Diagnostic TG, PPPL, 26-30/3/07. 1 A E Costley ITERO, Cadarache, France 12th Meeting of the ITPA Diagnostic Topical Group Princeton Plasma.
Module 4: Systems Development Chapter 13: Investigation and Analysis.
SUMMARY OF 4th IPTA TRANSPORT AND ITB PHYSICS TG MEETING St. Petersburg, Russia, April 8-11, 2003 Presented by E.J. Doyle for the TG Note: this summary.
Software Tools for Layout Optimization (Fermilab) Software Tools for Layout Optimization Harry Cheung (Fermilab) For the Tracker Upgrade Simulations Working.
Global Design Effort September 20-22, 2006 MAC Review R&D Programme (Tools) Eckhard Elsen GDE DESY.
11 Introduction of ITER Port plug and Diagnostics Integration 17 April 2015 Damao Yao.
PCAP Close Out Feb 2, 2004 BNL. Overall  Good progress in all areas  Good accomplishments in DC-2 (and CTB) –Late, but good.
DPS/ CMS RRB-T Core Software for CMS David Stickland for CMS Oct 01, RRB l The Core-Software and Computing was not part of the detector MoU l.
Agenda 1. Key Activities, Accomplishments and Status 2. Meeting Notes and Action Items.
Boundary Physics Breakout Session was a Good Start Breadth of topics: many issues pointed out in three plenary talks: pedestal, SOL/div/PFC, and technology,
HARNESSING FUSION POWER POWER EXTRACTION Power Extraction Panel Preliminary Research Thrust Ideas Robust operation of blanket/firstwall and divertor systems.
ARIES Pathways Project 05/29/08
WG Belgian Grid Implementation Network Codes.
Neutronic Analyses for ITER Diagnostic Port Plugs
Preliminary Project Execution Plan
DCLL Nuclear Analysis WBS Costing Mohamed Sawan University of Wisconsin-Madison Mahmoud Youssef University of California-Los Angeles ITER TBM Meeting.
Presentation transcript:

US ITER Diagnostics ITPA10 Moscow April 13, 2006 Presented by David Johnson US ITER Project Activities –Near-term priorities and plans –US diagnostic packages –Ongoing neutronics work and plans US Burning Plasma Organization ITER-relevant diagnostic development on DIII-D (separate presentation prepared by R. Boivin) ITER-Relevant Diagnostic Activity in the US

US ITER Diagnostics ITPA10 Moscow April 13, 2006 US ITER Project Has Started In March, PPPL was been selected as the lead institution for diagnostic procurement and David Johnson was selected as Diagnostics Team Leader. Since then there have been extensive discussions with diagnostics experts at 4 locations in the US focused on defining the scope of short term studies. Will fund studies of 2-6 man-months each. Some will start in May. More extensive contracts for detailed design work will come later, hopefully next year, when US responsibilities are better defined and funding increases.

US ITER Diagnostics ITPA10 Moscow April 13, 2006 US ITER Project Diagnostic Packages

US ITER Diagnostics ITPA10 Moscow April 13, 2006 Near Term Priorities 1.Better definition of ‘front-end’ designs understand and optimize front-end designs examine trade-offs in expanded capability and alternate approaches support ‘Port Plug Engineering Taskforce’, particularly in areas that affect US systems 2.Develop needed infrastructure CATIA CAD models neutronics capability optical designs performance simulation codes 3.Development of R&D plans both in-vessel and ex-vessel components prototyping contribute to generic R&D work on 1st mirrors, shutters, and other “far- forward” assemblies

US ITER Diagnostics ITPA10 Moscow April 13, 2006 Near Term US Neutronics Plans Three ongoing approaches for neutronics analysis Efficient translation from CAD to format compatible with input to MCNP Raytheon - TOPACT  being pursued by LLNL (Jeff Latkowski) Will use US E3 port labyrinth as example New version of MCNP that “runs within CAD elements” MCNP-CGM  M. Sawan - Univ. of Wisconsin Ready to try on simplified port plug (E3) in mid-summer ATTILA discreet ordinates code (Transpire - US Company) Code “verification” plan developed by IT to be based on 3 experimental benchmarks US has agreed (Mahmoud Youssef - UCLA) to perform ATTILA benchmark runs To be reported at meeting organized by Gianfranco Federici at Madison, Wisconsin July ATTILA runs with simplified E3 plug also planned prior to this meeting as a design example (R. Feder - PPPL)

US ITER Diagnostics ITPA10 Moscow April 13, 2006 Intensive Neutronics effort is underway: Direct conversion of CAD to radiation transport grid LLNL has converted ITER CATIA CAD to Pro/E for local ease of use and to enable TopAct conversion CATIA-CAD Pro/E-CAD Step File TopAct- GRID Neutronics TopAct speeds the process in moving from CAD to neutronics Contract in place with Raytheon for them to complete the conversion from Pro/E to Monte Carlo LLNL will become beta test user in FY06 Complex step Well in hand MCNP/TART

US ITER Diagnostics ITPA10 Moscow April 13, 2006 We are applying TopAct Grid generator to the design of ITER's MSE diagnostic Creating the ability to rapidly assess the radiation transport effects of design changes will make significant contributions to ITER and other projects, a capability developed at LLNL. 06 Accomplishment- Neutronics calculations Monte Carlo models (both TART and MCNP) have been completed for much of the MSE diagnostic TopAct is beginning to deliver, and we now understand its limitations and the appropriate work-arounds

US ITER Diagnostics ITPA10 Moscow April 13,

US ITER Diagnostics ITPA10 Moscow April 13, 2006 USBPO Diagnostic Activities 1.Diagnostic Topical Group Coordinators recently named - Réjean Boivin, Steve Allen, Jim Terry 2.Leaders are discussing possible Task Groups that might support US project responsibilities: Microwave systems - ECE and Reflectometry IR/FIR systems - Toroidal and Divertor Interferometry Imaging systems - Upper Visible/IR Cameras Active spectroscopy- MSE 3.Possible Diagnostic Task Group Roles (Need to draft charter) Provide forum of ideas relating to US systems. Comment on physics goals and related measurement requirements. Organize workshops for presentation and critique of upcoming design studies. Eventually support internal review of detailed designs. Provide experts for ITER diagnostic design reviews. Address some types of ‘action items’ from USBPO or USIPO. Advise US ITER Project on diagnostic issues