LIGO-G060098-01-D 1 Advanced LIGO Optical & Mechanical Layout Status Dennis Coyne, LIGO Caltech LSC Meeting, 21 Mar 2006 Version -01: with a couple of.

Slides:



Advertisements
Similar presentations
Hiro Yamamoto LLO April 3, 2014 LIGO-G Core Optics related loss hierarchy of aLIGO Hiro Yamamoto LIGO/Caltech Introduction Loss related to geometry.
Advertisements

LIGO - G R 1 HAM SAS Test Plan at LASTI David Ottaway November 2005 LIGO-G Z.
LIGO-G D Comments: Staged implementation of Advanced LIGO Adv LIGO Systems 17 may02 dhs Nifty idea: a way to soften the shock, spread cost, allow.
G R LIGO Laboratory1 Advanced LIGO Research and Development David Shoemaker LHO LSC 11 November 2003.
LIGO-G D Suspensions Update: the View from Caltech Phil Willems LIGO/Caltech Livingston LSC Meeting March 17-20, 2003.
1 LIGO-G v3 Transmission Monitoring Telescope and Suspension – TMS Eric Gustafson aLIGO NSF Review LIGO Livingston Observatory April 25-27, 2011.
LIGO-G D partial ADVANCED LIGO1 Optical Layout Cavity Lengths Input Mode Cleaner (IMC) »IMC FSR = ~9 MHz »Length = ~16.6 m = ~HAM1 to HAM3 separation.
LIGO-G M Photon Calibrator DRR & CDR: Response to Reviewers’ Report Phil Willems, Mike Smith.
Measurement of the laser beam profile at PSL to Mode Cleaner interface for the 40 Meter Prototype Interferometer A table of contents 1. Introduction 1.1.
20 Nov 2008G v21 Optical & Vacuum Equipment Layouts Dennis Coyne Mike Smith Luke Williams 20 Nov 2008 Adv. LIGO Team Meeting, Caltech, Pasadena,
LIGO-G D Suspensions Design for Advanced LIGO Phil Willems NSF Review, Oct , 2002 MIT.
1 G Mike Smith Gravitational Waves & Precision Measurements.
Design of Stable Power-Recycling Cavities University of Florida 10/05/2005 Volker Quetschke, Guido Mueller.
Optical Configuration Advanced Virgo Review Andreas Freise for the OSD subsystem.
LIGO-G M May 31-June 2, 2006 Input Optics (IO) Cost and Schedule Breakout Presentation NSF Review of Advanced LIGO Project David Reitze UF.
Amaldi conference, June Lock acquisition scheme for the Advanced LIGO optical configuration Amaldi conference June24, 2005 O. Miyakawa, Caltech.
LIGO-G Advanced LIGO Detector upgrade is planned for »Factor of 10 increase in distance probed (‘reach’) »Factor of 1000 increase in event.
Advanced VIRGO WG1: Status VIRGO, Cascina Andreas Freise University of Birmingham.
G Z AJW for Marcus Benna, Cambridge Wavefront Sensing for Advanced LIGO Model of wavefront sensing in a dual- recycled interferometer Consequences.
Advanced Virgo Optical Configuration ILIAS-GW, Tübingen Andreas Freise - Conceptual Design -
LIGO-G D LIGO II1 AUX OPTICS SUPPORT Michael Smith, 6/11/03 STRAY LIGHT CONTROL ACTIVE OPTICS COMPENSATION OUTPUT MODE CLEANER PO MIRROR AND PO.
40m AOS DRD, G R1 40m Auxiliary Optics Support Design Requirements Document & Conceptual Design Michael Smith 10/18/01 Stray Light Control Initial.
LIGO-G0200XX-00-M LIGO Scientific Collaboration1 eLIGO Input Optics Characterization and Performance Kate Dooley University of Florida.
AIGO 2K Australia - Italy Workshop th October th October 2005 Pablo Barriga for AIGO group.
LIGO LaboratoryLIGO-G R Coatings and Their Influence on Thermal Lensing and Compensation in LIGO Phil Willems Coating Workshop, March 21, 2008,
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
Advanced LIGO Simulation, 6/1/06 Elba G E 1 ✦ LIGO I experience ✦ FP cavity : LIGO I vs AdvLIGO ✦ Simulation tools ✦ Time domain model Advanced.
AdV Thermal Compensation System Viviana Fafone AdV/aLIGO joint technical meeting, February 4, 2004.
LIGO-G D 1 Status of Detector Commissioning LSC Meeting, March 2001 Nergis Mavalvala California Institute of Technology.
LSC-Virgo Caltech on March 20, 2008 G E1 AdvLIGO Static Interferometer Simulation AdvLIGO simulation tools  Stationary, frequency domain.
TCS and IFO Properties Dave Ottaway For a lot of people !!!!!! LIGO Lab Kavli Institute for Astrophysics and Space Research, Massachusetts Institute of.
LIGO- G050xxx -00-D Advanced LIGO SUS Installation into BSC Chambers: Mechanical Fixtures Dennis Coyne (with input from many) G May 4 th 2005.
LSC Meeting at LHO LIGO-G E 1August. 21, 2002 SimLIGO : A New LIGO Simulation Package 1. e2e : overview 2. SimLIGO 3. software, documentations.
LIGO-G Z March 2007, LSC meeting, Osamu Miyakawa 1 Osamu Miyakawa Hiroaki Yamamoto March 21, 2006 LSC meeting Modeling of AdLIGO arm lock acquisition.
Advanced LIGO UK 1 LIGO-G K OSEM Development UK Advanced LIGO project Stuart Aston University of Birmingham for the UK Advanced LIGO Team LSC.
LIGO-G Z 3) Current Status & Plan for Japan RSE -- Stabilization and Installation of PRC & Detuning -- LSC Livingston 2002 Kentaro Somiya.
LIGO-G D Core Optics Components (COC) Polishing Pathfinder Kickoff Advanced LIGO Project GariLynn Billingsley Caltech.
40m Optical Systems & Sensing DRD, G R 1 40m Optical Systems and Sensing Design Requirements Document & Conceptual Design Michael Smith 10/18/01.
G R 2004 Plan Update LIGO Systems meeting 22 Jan 04 dhs.
LIGO-G d April 24, 2007 Auxiliary Optics System (AOS) Technical Breakout Presentation NSF Review of Advanced LIGO Project Mike Smith, Phil Willems.
ET-ILIAS_GWA joint meeting, Nov Henning Rehbein Detuned signal-recycling interferometer unstableresonance worsesensitivity enhancedsensitivity.
Local control sensors for iKAGRA payloads and perspective (Optical lever) Kazuhiro Agatsuma 2013/Dec./5 ELiTES meeting at Tokyo1.
Main Interferometer Subsystem
Input Mode Matching of LCGT 2012/1/5, Yoichi Aso.
Auxiliary Optical Systems - AOS
Main Interferometer Subsystem
Auxiliary Optics System (AOS)
First Lessons from the Advanced LIGO Integration Testing
Summary of IFO Spatial Mode Workshop
KAGRA Control Room Appearance (tentative)
Yoichi Aso on behalf of the LCGT ISC Group
The Advanced LIGO Angular Control System (ASC) (Hanford edition)
Design of Stable Power-Recycling Cavities
Interferometer Design for bKAGRA Phase 1 and Beyond
Thermal Compensation Installation at LHO
Workshop on Gravitational Wave Detectors, IEEE, Rome, October 21, 2004
Interferometer Design for bKAGRA Phase 1 and Beyond
Interferometer Design for bKAGRA Phase 1 and Beyond
Interferometer Design for bKAGRA Phase 1 and Beyond
Advanced LIGO optical configuration investigated in 40meter prototype
Interferometer Design for bKAGRA Phase 1 and Beyond
Commissioning Procedure for bKAGRA Phase 1 ( )
Commissioning Procedure for bKAGRA Phase 1
Improving LIGO’s stability and sensitivity: commissioning examples
HAM SAS Test Plan at LASTI
Commissioning Procedure for bKAGRA Phase 1
Commissioning Procedure for bKAGRA Phase 1
Interferometer Design for bKAGRA Phase 1 and Beyond
Interferometer Design for bKAGRA Phase 1
Auxiliary Optics System (AOS)
Presentation transcript:

LIGO-G D 1 Advanced LIGO Optical & Mechanical Layout Status Dennis Coyne, LIGO Caltech LSC Meeting, 21 Mar 2006 Version -01: with a couple of corrections from the discussion at the LSC meeting

LIGO-G D 2 Layout Guidelines In addition to the layout constraints in “The ADL Optical Layout” (T ):  Working to eliminate all payloads from HAM2 (HAM8) for the baseline and the stable RC layouts  Saves > ~$5M from ADL baseline without HAM-SEI  Plan to validate & approve in time for baseline costing (i.e. within 2 weeks!)  IO Tubes  Output tube (between HAM5 and HAM6) likely to remain current diameter (unlike the input tube); Yet to be confirmed by layout checks  Input tube to be full diameter with ~12 viewport nozzles (not necked down)  ISC readouts only in HAM6 (HAM12) or out the -X side of HAM1 (or +X side of HAM7)  IFO beams sent to HAM1 (reflected port & BS PO) are relayed out to an ISC external vacuum system out -X side  Vacuum chamber (likely HAM2 or HAM8) to be located -X of HAM1 (+X of HAM7)  HAM6 (HAM12) to be isolated from the main vacuum envelope with a set of windows on a flange (remove when window backscatter is a problem)

LIGO-G D 3 ISC Read-out Tables in Vacuum

LIGO-G D 4 Layout Guidelines (continued)  Non-Folded IFO:  IO wants 2 CO2 beams for MMT2 & MMT3 (0.5 to 1 W of heating) –UFL will look into ring heaters as alternative -- range of adjustment is 10's of cms in position -- from 85% to 100% coupling -- need ~10% focal length change  Optlevs on all suspended optics is a good goal – should have at least a monitor of the optics table, and then use OSEMs as relative sensors –Angular damping control (should not be needed for AL) – could also consider using SEI platform sensors instead  Need to monitor the input beam position/orientation into the PRM, e.g. partially transmitting optics and cameras  IO wants 3 beams (one is REFL) from Faraday Isolator -- tells about polarization state of beam into & back from RM  IO beams: 2 MC, 1 Input, could bring laser intensity stabilization beam out as well with assoc. PD  Non-Folded IFO, stable power recycling cavity option being explored:  Use a small beam sample from optic just after the PRM (going toward the BS) instead of BS PO  might want longer distance than HAM4/5 folding, so shoot beam to HAM6 & make HAM5 an output detection table -- similar to what we're doing on the input side

LIGO-G D 5 Layout Status  Unfolded IFO:  Mike has revised the Zemax optical layout with proper ITM heights, PRC & SRC lengths and then re-imported into SW/PDMW (with chief rays kept in the SW layout)  Luke has transferred the IO baseline layout  Luke & Mike working on getting readout beams routed to proper “output tables”  Luke working on getting IO thermal compensation beams in place  Folded IFO:  The PRM & SRM need to be ~25 mm higher than for the non-folded IFO. Reduced headroom constrains layout – TBD if this is a problem.  The old AL Optical Layout document (T ) will be revised by Mike & Dennis in AprilT Baseline RCsStable RCs Non- Folded Zemax 3D CAD No ISCT, No IO aux G. Mueller’s optical layout (G ); Zemax TBD Luke’s partial 3D CAD; Merger with AOS in-process No ISCT, No IO aux FoldedZemax Partial 3D CAD No ISCT, No IO aux TBD

LIGO-G D 6 Optomechanical Layout  Maximum Folded IFO Schnupp asymmetry is  = lx – ly = 737 mm  Without constraints from quad damping struts  Assuming current envelopes for assemblies (some rather conceptual) N.B.: 1)A single stage HAM isolation system (currently under study) would allow for a lower height HAM optics table. This would permit more freedom in locating the triple suspensiuons (MC & RCs) and change COC wedge angles. 2)Modulation frequencies and cavity lengths will not be fixed until the ISC CDR planned for Oct ’06. In the meantime the layout efforts should define physical limits to the cavity lengths for various options.

LIGO-G D 7 Tight Fit for ITM Chambers  Damping struts for the quad structure  Concept tested at the ETF to damp 1 st bending modes of SUS structure & reduce SEI/SUS coupling  Not clear that there is enough room for one in each of the x and y directions (principal bending axes) for ITMx or for the ETMs (with a large beam reducting telescope behind the RM) ITMy Chamber Layout as viewed from below Potential Pick- Off Mirror interference!

LIGO-G D 8 Non-Folded ITMx (Upside-down) Very Conceptual Pick-Off Mirror Suspension Potential interference g 1.62m damping strut (ala ETF) As shown Limits Schnupp Asymmetry Can attach to front & angle out – also other direction

LIGO-G D 9 Tight Fit for ITM Chambers (continued) Nonfolded IFO, ITMx Chamber Layout as viewed from below Nonfolded BS Chamber Layout as viewed from below

LIGO-G D 10 Stable Recycling Cavities Evaluation Plan  a) define a workable layout  To be completed by early April to decide on VE & SEI infrastructure for baseline costs  b) Phil determines implications for thermal compensation  c) Guido determines ASC matrix and implications  d) Hiro develops FFT model to handle analysis of ROC tolerance, angular stability, etc.  e) Hiro & Phil et. al. apply FFT model to determine if stable & nearly degenerate PRC work  To be completed ~Aug, 2006

LIGO-G D 11 SPI  SPI (Suspension/Seismic Point Interferometer)  RODA to define interface for attachment of retroreflector or piezo-actuated mirror to the SUS quad structure at a height between the TM and PM  Being included in cost baseline, though not yet formally part of the technical baseline Proposed SPI beam location (150 mm diameter)

LIGO-G D 12 Further Work  Near-term:  Complete credible baseline & stable RC layouts for folded & un-folded (using current assembly envelopes)  Decide if 5 HAM-SEI systems suffice  Revise the optical layout document  Further–term:  Layouts suffer from guessed envelopes for a number of assemblies – need to develop better definition –Pick-Off Mirrors, BS SUS, FM/ITM SUS, etc.  Complete PDMWorks “infrastructure” (common chamber models, common 3D envelope models, etc.)