Quality Petroleum Equipment Solutions for Over 20 Years Reducing/Eliminating MLLD False Alarms The ARM-4073.

Slides:



Advertisements
Similar presentations
Click to edit Master subtitle style Wireless Irrigation Control and Monitoring.
Advertisements

Underground Storage Tanks at Duke Duke Medical Center –8 permitted USTs located on medical campus –Range in size from 2,000 gallons to 30,000 gallons Proper.
OfficeTrack Fuel and other Static Sensors Control.
Semicon Pte Ltd Semicon Pte Ltd. 1. Purpose If a chemical leaks at the bottom of equipment or pipe fitting area, An Engineer can confirm the chemical.
3.1.9 Student Book © 2004 Propane Education & Research CouncilPage Replacing Valves and Fittings in ASME Tanks Replacing ASME tank valves and fittings.
Safety Gas Plus.
Passive Leak Detection Operation Training October 2014.
1 Expansion Tanks. 2 3 Expansion Tanks WHY USE THEM TYPES LOCATION SIZING.
Expect More. World’s leader in pressure technology NA Sales Training Rev B – 10/10/13.
Quality Petroleum Equipment Solutions for Over 20 Years LDT-890 & LDT-890\AF.
ACCA Legislative Conference Underground Storage Tank Compliance
PRODUCT LINE LEAK DETECTION Katie Seaborn AMERICAN CONTAINMENT SERVICES, INC. ® Annual GTEC Underground Storage Tank Management & Compliance Seminar -
according EU Standard EN
Introducing The Revolutionary ENSA  EN ergy SA ving Automated Wireless Light Switch A World First For The Security Industry By Making Alarm Sensors Dual.
Tel: Unique Home Security Systems Security Supplies Captures Boards Digital Video Recorders Power Line Communication Wireless Solutions.
Case Study 3.1: WP Inc. Problem-Solving
Overview of the 1.
Quality Petroleum Equipment Solutions for Over 20 Years VMI MLLDs A Higher Level of Performance.
The Most Failsafe Sump Pump System Ever Manufactured.
We present APM - Authorization and Profile Management.
This presentation is part of a larger program that includes hand outs with checks lists and user instruction tips. If you do not have these materials they.
Student Book © 2004 Propane Education & Research CouncilPage Purging Vapor Distribution Lines & Appliances Purging is the controlled displacement.
Spill and Overfill Prevention Alaska Spring 2004.
Injectable Packing Injectable packing is not a new concept, however Utex has developed a new means of containment that has revolutionized injectable packing.
Up Design -Pro –e 3d design, detailing and checking services
Remediation System Design & Implementation Presented by.
Experts in Chem-Feed and Water Treatment Delta Presentation.
State of Oregon, DAS Fleet Fuel Island Operations - E-85.
MassDEP Underground Storage Tank Program Program Requirements for Owners and Operators Winter 2015 Workshops 1.
Fire Safe Microwave Reid Allen - Red B. The Idea and Motivation  Microwaves caused ~7,400 fires in injuries and $18 million property damage.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Poka-Yoke TOTAL QUALITY MANAGEMENT Poka-Yoke.
ADT Advanced Defense Technologies Inc..  Wire Harnesses  Cable Assemblies  Electro-Mechanical Assemblies  Coaxial cable assemblies  Network Cables.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Reconstruction, Upgrade and Repair Reconstruction, Upgrade and Repair Midwest COOLING TOWERS, INC.
ARM Based Gas Leakage Detection System Student Name USN NO Guide Name H.O.D Name Name Of The College & Dept.
Water Detectors The materials included in this compilation are for the use of Dwyer Instruments, Inc. potential customers and current employees.
PRODUCT LINE LEAK DETECTION (including a summary of the 2015 UST regulations) Katie Seaborn AMERICAN CONTAINMENT SERVICES, INC. ® Annual GTEC Underground.
Staying in Compliance Inventory Control Bill Greer GTEC.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
BY: Winston G. Smith Environmental Engineer UST/PCB & OPA Enforcement & Compliance Section EPA Region 4.
Staying in Compliance Dispensing Equipment Spill/Overfill Presented by Travis Benton United Pump and Controls, Inc.
BGV 03-nov-2015CERNMassimiliano Ferro-Luzzi 1 BGV cooling : status and TS3 installation plans Valdir & Massi.
11230 Sorrento Valley Rd./Ste 160 San Diego Ca, Phone: x761 Fax: Web: Center.
A Company Selling Technology and not just a Product.
The purpose of installing fire fighting equipments is to protect the public, property, and assets in fire emergency. Manufacturers of fire protection.
Central Issuance Registry Presentation for End-Users November, 2008 Special Note: This presentation includes information on Datacard Group’s long range.
Check Out EBM INFO- The Best HP Authorized Service Center In Noida.
Best Call Center Outsourcing Companies in USA. B&F Call Center Solution B&f Call Center solutions specialize in providing you with better customer experience.
7 A/C System Components, Operation, and Service.
Air conditioning is a combination of activities such as conditioning the air i.e., heating or cooling, ensuring air movement, and cleansing the air. The.
Network and Server Basics. Learning Objectives After viewing this presentation, you will be able to: Understand the benefits of a client/server network.
Veeder-Root Company Presents: EPA Compliance Basics Presenters: Bill Tobias, Director of Sales, Veeder-Root Carlton Knowles, Territory Sales Manager, Veeder-Root.
Gmail Tech Support Number
Microsoft Azure Helps to Scale a Total Business Management System for IT Solution Providers MINI-CASE STUDY “Using Microsoft Azure has given us fantastic.
What is Desuperheater Water heater and its Applications?
Why Are Silicone Sleeves The Most Important Component of Masking? By I.C.E INC.
AOL Customer Service Number This the normal and most well known error code in the web space. It doesn't just disturb the online mail platform however it.
COMPLIANCE CHALLENGES FACING OWNERS OF UNDERGROUND STORAGE TANKS
Alabama Tools Seminars
MECH 1500 Pulse Timer Energizes contacts immediately when enabled and begins timing. De-energizes contacts after the preset time value has elapsed De-energizing.
Presenter : Lee James Girard Interstitial Monitoring
NEW COMPLIANCE REGULATIONS
Solving systems using substitution
Universal Interrupted Electronic Oil Primary R7184U Training Module
Risk Management Student Powerpoint
Presentation transcript:

Quality Petroleum Equipment Solutions for Over 20 Years Reducing/Eliminating MLLD False Alarms The ARM-4073

What is an ARM? Auto Repressurization Module ARM-4073

Why Do We Build the ARM-4073? To increase confidence in the leak detection system, by eliminating thermal induced false alarms.

How Does Thermal Contraction Cause Slow Flow? Thermal contraction reduces volume/pressure in the line when the submersible pump is off. Vapor pockets form in the line to replace the (contracted) liquid.

Thermal Contraction Continued The leak detector cannot refill the line and compress the vapor pocket in the 4-5 seconds available. Therefore: leak detector is still in slow-flow at opening of nozzle = false alarm.

How Does the ARM Combat Thermal Contraction? By cycling the submersible to repressurize the line.

Doesn’t That Defeat the Purpose of the Leak Detector, Preventing It From Working? Not in the manner the ARM is designed to work. This is the difference between an ARM and a cycle timer.

How Does the ARM Function? Allow the submersible to stay off long enough for the leak detector to reset if there is a 2 GPH leak (or less). Cycle the submersible on and check for a leak.

How Do We Know the Leak Detector Is Reset? Each line is unique. To ensure the leak detector is reset, we have the installer measure the bleed-back (line resiliency).

Reset Continued Bleed-back gives us the unique volume each line has before a leak detector is reset. Cycle times are based upon this volume (set at install).

The ARM-4073 Works to Eliminate Leak Detector False Alarms Owners benefit through reduced service calls. Greater Volume (Less down time). Less customer frustration.

Contact Vaporless Manufacturing, Inc East Long Mesa Drive Prescott Valley, Arizona Phone: or Fax: Web Site: