©2002 Galorath Incorporated 1 A Vehicle for Collaboration The CAI Program Accomplishments: Established an Industry / Government Team (U.S. Air Force, U.S.

Slides:



Advertisements
Similar presentations
( , RF/RFID Technology & Commercialization Forum Technology Service Corporation Jitti Sukontasup ( ,
Advertisements

FMS. 2 Fires Terrorism Internal Sabotage Natural Disasters System Failures Power Outages Pandemic Influenza COOP/ Disaster Recovery/ Emergency Preparedness.
Test Automation Success: Choosing the Right People & Process
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
Leveraging Success Through Effective Project Management Tools and Processes Charlie Schloff Manager, C3P Project Office Ford Motor Company File: MPUG 2000.
Taking a Waterfall Project Agile REF: Paul Geberth GCSS-J Project Manager Establishment of an Agile Project.
1 Chapter 2: Product Development Process and Organization Introduction Importance of human resources: Most companies have similar technology resources.
Alternate Software Development Methodologies
The Power of Collaboration CRS Intranet Catholic Relief Services Or Dashevsky October,
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Appendix.
Continuous Value Enhancement Process
-ACC is a nest of collaborative spaces created through partnerships w/Services, Agencies, and Industry to support growth beyond internal resources and.
Sensor Systems Division Trusted Situational Awareness A System that Improves the Function and Security of Surveillance Systems used by Law Enforcement,
1 The Cost of Organizational Structures and Interfaces prepared for Ground System Architectures Workshop by Darryl W. Webb Business and Operations Analysis.
Supply Chain Management
Albert C K Choi Department of Industrial and Systems Engineering
Principles of Information Systems, Sixth Edition 1 Systems Investigation and Analysis Chapter 12.
Smart Objects for QMS in Advanced Manufacturing Systems Part 1: Architectures and Role PUTNIK G., CARVALHO C., ALVES C., SHAH V., VARELA L. UNIVERSITY.
Senior Review Evaluations (1 of 5) Proposals due: 6 March 2015 Panel evaluations: Week of 22 April 2015 Performance factors to be evaluated will include.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Investigation and Analysis Chapter 12.
Professional Growth= Teacher Growth
Y. Rong June 2008 Modified in Feb  Industrial leaders  Initiation of a project (any project)  Innovative way to do: NABC ◦ Need analysis ◦ Approach.
Readiness-Based Sparing addresses a challenge common across DOD
Annual SERC Research Review - Student Presentation, October 5-6, Extending Model Based System Engineering to Utilize 3D Virtual Environments Peter.
Effective Methods for Software and Systems Integration
Introduction to ISO New and modified requirements.
Information Integration in Construction. Construction information In construction, architects, engineers, planners, contractors, facility managers....
© VESP International Pty Limited To Contents Slide CLICK to advance slides/ bullet points within slides Integrated Master Planner An Overview.
Voice over IP Spring LNA Meeting April 1, What is Voice over IP? n A technology for transporting integrated digital voice, video and data over IP.
Nurjana Technologies Company Presentation. Nurjana Technologies (NT) is a small business enterprise founded in 2012 and operating in Aerospace and Defence.
OneView Benefits Sales collaboration across network A “one-stop” utility portal Ease of use, scalability & accessibility Useful reports and metrics Improved.
Product Lifecycle Management Solutions of Enterprise Group 8 楊士霆 (d927821) 吳友仁 (g923836) 白珊慈 (g923840)
© 2012 PRICE Systems, LLC. All Rights Reserved. Optimize tomorrow today. ® Understanding and Measuring the Impact of Design and Systems Engineering Decisions.
The Engine Driving Purchasing Management in Complex Environments MAGSOFT INTERNATIONAL LLC.
Dr. Ralph R. Young Director of Software Engineering Systems and Process Engineering Northrop Grumman Information Technology (703)
CRESCENDO Full virtuality in design and product development within the extended enterprise Naples, 28 Nov
2011 ITRC Spring Membership Meeting Minneapolis, Minnesota April 6, 2011.
. Traffic Flow Management System Benefits Flexibility for Future Growth: TFMS provides a modern software architecture to meet future growth and support.
Chapter 6 : Software Metrics
AIAA’s Publications Business Publications New Initiatives Subcommittee Wednesday, 9 January 2008 Rodger Williams.
DAK L&E Processes and Tools Boeing-Lean Engineering Public Release Control No Boeing Phantom Works Lean and Efficient Processes and Tools.
Computer Science Studies and Distance Education Unique Aspects Wingate Seminar London May 2005.
DSCC Initiatives DSCC Supplier Conference Ivan K. Hall Director Readiness & Business Operations.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Appendix B Rapid Application.
Government Procurement Simulation (GPSim) Overview.
Principles of Information Systems, Sixth Edition Systems Investigation and Analysis Chapter 12.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
March 2004 At A Glance NASA’s GSFC GMSEC architecture provides a scalable, extensible ground and flight system approach for future missions. Benefits Simplifies.
1 UWDO Overview – NUWC WAK – 12/14/01 Simulation Based Design (SBD) Vision The SBD VISION: Develop, manufacture, deploy, and operate weapons “in the computer”
1 Improving the Risk Management Capability of the Reliability and Maintainability Program An introduction to the philosophy behind the AIAA S-102 Performance-Based.
NASA/Air Force Cost Model presented by Keith Smith Science Applications International Corporation 2002 SCEA National Conference June
Chapter 6 CASE Tools Software Engineering Chapter 6-- CASE TOOLS
Arlington, VA March 31, 2004 Presentation for the Advisory Committee for Business & Operations Effective Practices Research Overview For Merit Review This.
Integrated System Health Management Design Study Integrated System Health Management (ISHM) Design Study Jim MacConnell Consensus Technology, LLC 2200.
New Product Development Page 1 Teddy Concurrent Engineering by Teddy Sjafrizal.
PTC Creo Unite Technology
Industry Day DoD Parts Management Reengineering LMI McLean, VA May 8, 2007 Parts Standardization and Management Committee (PSMC )
U.S. Department of Agriculture eGovernment Program Smart Choice Pre-Select Phase Transition September 2002.
Continual Service Improvement Methods & Techniques.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Action/Initiative Date Action Initiated: December 2003 Status: On-Going Government and Industry Forum consisting of all military services, weapons system.
Indirect Cost Model (ICM) (a Contributing Model of CAICAT)
A Vehicle for Collaboration
PMRIPT Portal Team.
Boeing Phantom Works Lean and Efficient Processes and Tools
CAD/CAM services ensure complete Mold Tooling design in catia process coverage for mold tooling injection designers. CAD/CAM services use a predefined.
Life Cycle Part & Component Knowledge Sharing Portal
MANAGING THE DEVELOPMENT AND PURCHASE OF INFORMATION SYSTEMS
Dairy Subgroup #1: Fostering Markets for Non-Digester Projects
Presentation transcript:

©2002 Galorath Incorporated 1 A Vehicle for Collaboration The CAI Program Accomplishments: Established an Industry / Government Team (U.S. Air Force, U.S. Navy, Boeing, Northrop Grumman, Lockheed Martin & GEAE) Provided the Forum for Competitors to Begin Sharing Data Defined Requirements, Planning and Goals Defined Cost Analysis Requirements Developed a Cost Analysis Tool - “CAICAT” Enabled Cost Analysis Tool Validation Verification Encouraged Cost Analysis Tool Acceptance & Utilization

©2002 Galorath Incorporated 2 CAI Background A cooperative effort between government and industry to reduce the cost of aerospace composite structures. This allows design engineers to take full advantage of their unique benefits. The CAI Program is a 50/50 cost share between Government & Industry.

©2002 Galorath Incorporated 3 SMART GalorathCAI Reduce the acquisition costs of advanced composite structures by an order of magnitude Galorath Goals Synergistic Goals Increased Supportability, Maintainability, and Military Worth More Effective, Cost Efficient Training At the Individual, Crew & System Level SMART Goals Enabling affordable plans that work, by answering the question: “Which way do we go?” early in the design stage of a program Reduced Total Ownership Costs (TOC) Time to Initial Operating Capability (IOC) Logistics Trail CAI Goals

©2002 Galorath Incorporated 4 CAICAT Team Objectives Primary Objective Develop a credible and rapid cost evaluation system for a military airframe, that can address state-of-practice, state- of-the-art and emerging design & manufacturing technologies. The Customer The customer for CAICAT is a design integrated product team The Modules The CAICAT modules should work both standalone and as part of an integrated process The data and practices embedded in the CAICAT suite, and the default results of the CAICAT modules, should reflect an industry average The module inputs should be easily modified to reflect differences in design and manufacturing practices Each module should have ability to be enhanced or replaced as member of the CAICAT suite

©2002 Galorath Incorporated 5 ConceptDesignTestTooling Typical Product Development Cycle with DFM with CAI Plug - - In ProductDevelopment Cycle Greatest Potential Savings using DFM in this Phase “Making Smart Decisions Early” (as much as 80% ) Influence The Design Team and take full advantage of any potential savings (as much as 80% ) The design community, early in the concept stage when important decisions are made, had no way to determine the impact of their choices on cost “Proactive Costing” Not “Reactive Costing” Linking Parametric data and process data Linking CAD data and cost data CAICAT Challenge

©2002 Galorath Incorporated 6 CAICAT Development Process Define Requirements Develop Model Structure Conduct Survey Invite CBD Response Develop Screening Methodology Screen Respondents Match Available Models to Requirement Develop Plan for Gaps Conduct Development Tasks Cost Analysis Tool Define Requirements Develop Model Structure Conduct Survey Invite CBD Response Develop Screening Methodology Screen Respondents Match Available Models to Requirement Develop Plan for Gaps Conduct Development Tasks Cost Analysis Tool

©2002 Galorath Incorporated 7 SEER-DFM: CAICAT Solution Solution The CAICAT Team Selected SEER-DFM to serve as its Plug- in. Galorath became a 50/50 cost share partner in CAICAT. CAI member companies are far along in the development of a software package, based on a commercial Design for Manufacturability tool (DFM) called SEER-DFM™, which gives designers a method to quickly evaluate the cost of alternate composite materials and manufacturing processes.

©2002 Galorath Incorporated 8 Team Work Air Force Research Labs Navy Science & Technology TEAMTEAM CAICAT Member Companies

©2002 Galorath Incorporated 9 Why SEER-DFM? Shortens Development Cycle Provides a Cost Compass Documents Trade Study Process Increases Trades Quantity Multiple Site Collaboration Customization Via Plug-in COTS Solution Commercialization Expandable Auto Data Import/Export Linking to PDM’s 24/7 Support Provides Design Team with the ability to make smart decisions from the “Back of the Napkin” to the CAD Program Phases, which reduces downstream manufacturing costs Provides the Design Team with Real Time Cost Feedback

©2002 Galorath Incorporated 10 SEER-DFM Customization Based on Aerospace Industry Standards Recognized by Industry and Customers, both Air Force and Navy, as a tool set that can influence Designers & Design Teams to make affordable designs in “real- time”

©2002 Galorath Incorporated 11 SEER-DFM Parameter View WBS based structure Define processes for parts/assembly Define cost based on simple engineering data

©2002 Galorath Incorporated 12 Extensive Processes

©2002 Galorath Incorporated 13 CAICAT Subsystems SEER-DFM CAD Workstation Operational & Support Indirect Cost Operations Simulation RDT&E SEER-DFM with CAI Plug-in RDT&E (Research, Design, Tooling and Engineering) Cost Model Operations Simulation Model Indirect (Acquisition) Cost Model Operations and Support Cost Model

©2002 Galorath Incorporated 14 Where Are We Now? CAICAT Status: The team is currently in phase 3 of its multi-phase program. In phase 2, the CAI program developed the contributing systems, or cost models, and a prototype integration of those models. The CAI program also developed a trial integration with CATIA and UNIGRAPHICS. The present task is intended for completion of the integration of the above models in a CAD (CATIA and UNIGRAPHICS) environment so that the entire system can be maintained and commercialized in the future. The industry participants and the government each have a variety of legacy tools, processes and data that must be integrated by each member to be directly useful within each member’s organization.

©2002 Galorath Incorporated 15 Conclusion Fostering Collaboration: A Success Story Although it’s difficult to attach an ROI to collaboration, the success of the CAI Team can easily be measured by its accomplishments, such as: Creating a forum for contractors to share data between each other; the first forum of its kind. Contractors sharing their data with the government agencies and model builders; another first of its kind. A suite of commercially available software tools for all of the U.S. industrial base to use Parametric based tools and process based tools linked together and sharing Data

©2002 Galorath Incorporated 16 Contact Information To Learn More J.P. Falque Product Director, Galorath Incorporated Tel:

©2002 Galorath Incorporated 17 Current Status, Continued Galorath was selected to do the Integration for Phase 3 CAICAT Integration was not funded for FY 02 Individual member companies are working with Galorath on custom solutions Galorath is working with CAD extraction companies to formulate a phased plan to accomplish costing “on the fly” Linking CAD and SEER-DFM Galorath and contractors working on both Comanche and Apache Continuing to decrease cost by using a Parametric approach and process- based models, as well as linking to CAD Data SEER-DFM w CAI-Plug-in can be served to any Design Work Station

©2002 Galorath Incorporated 18 Success in Design Affordability Through its effort, the CAI has: Produced a common approach Produced a common approach to cost analysis which is a fundamental way to lower costs, inject change and project future cost with confidence. Proven the use of multiple techniques Proven the use of multiple techniques, such as parametric and process based estimating in conjunction with risk analysis, is not only possible but is encouraged. Set Goals Set Goals to combine the use of commercially available solid or computer aided design models (CAD), parametric, process based and risk analysis cost modeling all integrated to work as one modeling space. The building of specific design cost tool modules for the U.S Aerospace industry has become the foundation from which to begin the process of setting cost analysis standards and metrics.

The Composites Affordability Initiative (CAI) The Benefits of Getting the U.S. Government and Airframe Producers to Cooperate The Composites Affordability Initiative (CAI) The Benefits of Getting the U.S. Government and Airframe Producers to Cooperate ARMY /SMART Conference Salt Lake City, UT April 2002 By J.P. Falque Product Director, Galorath Incorporated