June 2013 © CRMCA.com 1 Hidden Landmines in Concrete Specifications Eric T. Misenheimer, PE Chair, CRMCA Technical Committee June 22, 2013.

Slides:



Advertisements
Similar presentations
CONCRETE TESTING Dr. Sophia Hassiotis.
Advertisements

Lecture #13 Properties of Hardening Concrete Curing.
EARLY AGE COMPRESSIVE AND TENSILE STRENGTH DEVELOPMENT OBJECTIVE Determine how SCC strategies…  high paste content  VMA (thickeners)  smaller aggregate.
Lecture 2 Design of Concrete Mixes and Properties of Fresh Concrete Dr Magnus Currie ENG-1010: Reinforced Concrete Design.
Distress, Evaluation, and Repair of Historic Concrete Jarkko Simonen, P.E. Wiss, Janney, Elstner Associates, Inc.
Introduction Dr Magnus Currie From Scotland, UK MEng Civil Engineering
Break Down of Concrete Components. Mineral Admixtures: Pozzolans & Cementitious Fly Ash Slag Cement Silica Fume – Benefits Higher strengths at later age.
Chapter 3. Obtaining Silica-Fume Concrete  Specifying Silica Fume and SFC  Proportioning SFC  Producing SFC.
Concrete Tanks and Distribution Boxes: Watertightness and Corrosion Claude Goguen, PE Director of Technical Services National Precast Concrete Association.
How long will your concrete bridge last?
Learning Objectives Relevance of fresh concrete properties
Fly Ash Utilization in Concrete
Evaluation of Recycled Latex Paint for Use in Concrete.
Andy Naranjo, P.E. Construction Division
Social Responsibility: The Unexpected Change of Paradigm Towards a new Curriculum Mazen F. Rasheed, Michael von Gagern, Muhammad Sharafat Waheed The National.
Chapter 12 Concrete Construction Part 3 1CE 417, King Saud University.
1 Implementing Computer Applications in Counseling James P. Sampson, Jr. Florida State University Copyright 2003 by James P. Sampson, Jr. All rights reserved.
DEF diagnoses  Four main features:  Presence of gaps completely encircling aggregates  Wider gaps around large aggregate than around small aggregate.
Colby Mire & Jordan Licciardi Advisor: Mohamed Zeidan ET 493
Performance Improvement. 2 Steps to Performance Improvement 1. Define the Problem 2. Define Duties or Behaviors to be Improved 3. Establish Priorities.
Admixtures.
One Team: Relevant, Ready, Responsive and Reliable Navigation Lock and Dam Inspection and Emergency Repairs Workshop ERDC Vicksburg, Mississippi Concrete.
Methods of Specifying ACT Objective Recognize the language, proper preparation, and appropriate situation for the four methods of specifying. 2.
IDOT UPDATE Illinois Association of Aggregate Producers Eric E. Harm, PE Assistant Chief Engineer May 18, 2006.
Design of Concrete Structure I Dr. Ali Tayeh First Semester 2009 Dr. Ali Tayeh First Semester 2009.
Concrete Technology Ch8: Proportioning Concrete Mixes Lecture 14 Eng: Eyad Haddad.
O’Hare Modernization Program 2.2 Raw Materials Leslie J. Struble Francis B. Nelson Kickoff Meeting, October 28, 2004.
Concrete Prepaid by: One Definition of Portland Cement Concrete…  Portland cement concrete (PCC) is a heterogeneous system.
I-99 HPC Initiative: Upcoming Work. Phase II Testing  25 Phase II Mixes –Control, silica fume, fly ash, slag, ternary, Aquron, Ipanex  Phase II Testing.
Eng. Malek Abuwarda Lecture 12 P1P1 Construction Methods Lecture 12 Production of Aggregate and Concrete.
Performance-based Specifications for Concrete A focus on innovation, quality, and customer satisfaction.
Seismic Methods Used To Check Strength of Concrete Runway Reconstruction Dean Rue, P.E. CH2M HILL 2010 FAA Airport Technology Transfer Conference Atlantic.
Raw Materials Study at Chicago O’Hare Int’l Airport by Francis B. Nelson III Leslie J. Struble.
1/33.  Performance based approach  Definitions and responsibilities  Standard requirements  Exposure classes  Fresh concrete requirements  Hardened.
PREPARED BY: MARCIA C. BELCHER CONSTRUCTION ENGINEERING TECHNOLOGY Concrete: Fundamentals.
Scenario on airport works Session 5 Presentation 1.
Project Management.
Impact of Potassium Acetate Deicing Chemicals on ASR of Candidate OMP Concrete Materials Francis B. Nelson III Leslie J. Struble January 12, 2006.
CORROSION FORUM Industry Perspective Sheldon W. Dean 20 May 2003.
Control Tests for Concrete Ch. 16. Project Specifications Characteristics of the mixture Maximum size aggregate Minimum cement content Characteristics.
Silica Fume Inspection
Properties of Concrete Design and Control of Concrete Mixtures – Chapter 9.
High-Performance Concrete Design and Control of Concrete Mixtures – Chapter 19.
Community Development Department May 2, 2016 NEW CPAC MEMBERS TRAINING WELCOME.
High Performance Concrete. Content Introduction What is High Performance Concrete? Application Objectives General Characteristics Advantages Limitations.
O’Hare Modernization Program 2.2 Raw Materials Leslie J. Struble Francis Nelson and Li Ai OMP Program Meeting, September 21, 2006.
Best Practices Guide DRAFT Soliciting Comments for 30 Days As lab testing moves forward –Changes in limits may be fine tuned As field work moves forward.
HIGH PERFORMANCE CONRCETE
CVL 2407 Faculty of Applied Engineering and Urban Planning Civil Engineering Department 2 nd Semester 2013/2014 Dr. Eng. Mustafa Maher Al-tayeb.
BCN 5905 –STRUCTURES I Dr. Larry Muszynski RNK 327.
Hardened Concrete Properties
BCN 5905 –STRUCTURES I Dr. Larry Muszynski RNK 327.
How long will your concrete bridge last?
Chemical Admixtures In Concrete
What are Admixtures? Admixtures are the material, other than Cement
Investigating the Effect of Alkali Silica Reaction in concrete made with Recycle Concrete Aggregate by Carbonation A potential solution for both sustainability.
Community Development Department April 3, 2017
1. Characteristic and Mix design proportions
Hardened Concrete Properties
How long will your concrete bridge last?
Concrete Technology.
Community Development Department April 3, 2017
Community Development Department May 2, 2016
Chemical Admixtures In Concrete
Concrete for Box Culverts – Wet Cast Concrete
Recycled Concrete Aggregates
Admixtures.
DOT Research Benefits All
Community Development Department May 2, 2016
Community Development Department April 3, 2017
Presentation transcript:

June 2013 © CRMCA.com 1 Hidden Landmines in Concrete Specifications Eric T. Misenheimer, PE Chair, CRMCA Technical Committee June 22, 2013

June 2013 © CRMCA.com 2 What is a Specification? A specification (often abbreviated as spec) is an explicit set of requirements to be satisfied by a material, design, product, or service. – ASTMrequirements

June 2013 © CRMCA.com 3 Why should we be concerned? Specification Requirements: – Aggregates Alkali Silica Reactivity – ASR – Concrete Properties Shrinkage Permeability Air Void Analysis Freeze-Thaw Durability Scaling Resistance

June 2013 © CRMCA.com 4 Why should we be concerned? Time – From 16 days to 68 weeks – Most tests around 30 days, but some take SIGNIFICANTLY longer – Communicate the time frame(s) to potential bidders so that they are aware of schedule impacts. – Avoid last minute job award/submittal requests

June 2013 © CRMCA.com 5 Why should we be concerned? Cost – From $400 per test to $2500 per test – Make sure that ALL anticipated testing costs are captured and expensed

June 2013 © CRMCA.com 6 C 1260/C 1567 Example – Standard **Note age of data allowed**

June 2013 © CRMCA.com 7 C 1260/C 1567 Example – 30 days

June 2013 © CRMCA.com 8 Why should we be concerned? Variance from ASTM Standard – Communicate with lab performing test to make sure variance is noted and incorporated and test is run to completion – Check on additional cost of variance

June 2013 © CRMCA.com 9 C Example

June 2013 © CRMCA.com 10 C 457 Example

June 2013 © CRMCA.com 11 C 457/C 666 Example

June 2013 © CRMCA.com 12 Why should we be concerned? Design vs. Construction Testing – Construction stage testing can be very difficult Most tests are intended for lab conditions – Many construction stage tests are affected by conditions beyond our control Placement, consolidation, finishing and curing – Make sure design and construction testing responsibilities/liabilities are covered in your contractual/PO agreements

June 2013 © CRMCA.com 13 C 1202 Example

June 2013 © CRMCA.com 14 Test – Standard – Time – Cost Test PurposeASTMTimeCostComments StandardRequired Petrographic Exam - Aggregates C 295**$2000 to $2500** No specific time for test, but highly specialized and very few labs perform this test. Can take 30 days to get results. Alkali Reactivity - Aggregates C to 30 days $1000 to $1600Standard calls for 16 days but some specs extend to 30 days Alkali Reactivity – w/ Cementitious C to 30 days $1000 to $1600Standard calls for 16 days but some specs extend to 30 days ShrinkageC 157**$500 to $1200** Standard calls for 28 days initial curing followed by up to 64 weeks. Typically modified to 7 days initial curing followed by 28 days. Microscopic Air Void Analysis C 457**$400 to $600** No specific time for test, but highly specialized and very few labs perform this test. Can take 30 days to get results.

June 2013 © CRMCA.com 15 Test – Standard – Time – Cost Test PurposeASTMTimeCostComments StandardRequired Freeze-Thaw ResistanceC to 60 days** $1200 to $1500**Procedure after 14 days(typical) curing Permeability (?) C 1202**$500 to $700**Curing method controls length. Typically 28 days. Scaling ResistanceC days**$800 to $1000**Procedure after 28 days(typical) curing

June 2013 © CRMCA.com 16 Why should we be concerned? Time – Time noted in tables is for the test only Does noted include gathering/delivering materials to the lab or mix/sample preparation Costs – Costs noted in table are for standard test procedures and any variance from the standard can have SIGNIFICANT effect on test costs.

June 2013 © CRMCA.com 17 QUESTIONS ?? Thank you on behalf of the CRMCA Technical Committee