Revisiting VA in Service Industry

Slides:



Advertisements
Similar presentations
The information contained in this presentation, the source code and underlying program are protected by copyright owned by PlusDelta Technologies, LLC.
Advertisements

A Brief Introduction to Lean Concepts for the Office Bill Motley, CEM, CQMgr, PMP Program Director, Production, Quality & Manufacturing Curricula Development.
Improving Office Practice: Process Flows Mark Murray, MD, MPA Mark Murray and Associates.
Request Management Mirror-. A random three day sample of Incidents revealed that about 86% of the registered Incidents were legitimate Requests Many other.
Introduction to Lean. Benefits of Lean Why go Lean? Improvements in: –Customer service –Quality and efficiency –Staff morale –Internal communication and.
Transportation Waste Definition: the unnecessary act of taking or carrying someone or something from one place to another Office example: Movement of paperwork;
Value Stream Mapping A Laboratory Tool Laurie Peterson-Wright Colorado Department of Public Health and Environment Laboratory Services Division.
PROCESS MAPPING - FLOWCHARTS OVERVIEW © 2008 – Jesse Whiddon – All rights reserved.
What is a System? Admissions Educate Graduation.
Understanding the Current Condition
Supplier Development Kaizen Implementation Kit
Chapter 4 Process design Shenval. Alamy.
1 Process Mapping BA 339 Mellie Pullman. 2 Objectives Service Process Differences Little’s Law Process Analysis & Mapping.
Lean Manufacturing Chris Poteet Scott Carroll.
IMPROVE Phase Consider these Improvement Initiatives! Six Sigma Simplicity.
Total Quality Management BUS 3 – 142 Tools of Quality Week of Mar 7, 2011.
CSC Proprietary and Confidential 1 Forms Lesson 3 After completing this lesson, you will be able to select and complete the most common forms.
Industrial Facilities Design
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
Value Stream Mapping.
Lean Training Standard Work. Agenda What is it? What’s it for? How does it work? When do you use it? What’s an example?
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to Lean Manufacturing TOTAL QUALITY MANAGEMENT Lean Manufacturing.
OPSM 301: Operations Management Session 7: Process analysis Koç University Zeynep Aksin
Using Task Manager to Work EDI/ERA Posting Lori Phillips CHUG at Centricity Live April 29 – May 2,2015.
OFFICE MODERNIZATION – Toward lean and efficient administration Presented by: Edly Ferdin Ramly.
LESSON 8 Booklet Sections: 12 & 13 Systems Analysis.
Chapter 8: Systems analysis and design
Define the problem to be solved. Measure the current performance. M.
LeanSigma ® Facilitator Training Module 5 – Waste.
Value Analysis/ Flow Analysis
Software Inspection A basic tool for defect removal A basic tool for defect removal Urgent need for QA and removal can be supported by inspection Urgent.
Chapter 4 Process Design.
LeanSigma ® Fundamentals Module 4 – Specify Value.
LEAN Roger Jones Joe Novello. Introductions Historical Background Baldridge Quality Framework.
© ValueAdding.com Ltd 2004 Process Mapping. © ValueAdding.com Ltd 2004 Introducing the techniques we shall use Process mapping symbols –Using “Post It”
Developing a Monitoring and Pre-Scoring Plan for the Virginia Grade Level Alternative (VGLA) Adapted from the Virginia Department of Education Division.
Systems Life Cycle. Know why it is necessary to evaluate a new system Understand the need to evaluate in terms of ease-of- use, appropriateness and efficiency.
Dr. Shulagna Sarkar Assistant Professor , Jt. Coordinator – PGDM – HRM
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
9. Applying scientific tools & techniques for improving customer satisfaction.
Process Characteristics
12/2/2015 2:45 AM 1 PROJECT TIME PLANNING Process and Bar Chart Technique.
Week 1 Theory 2 B usiness I nformation S ystems Batch Processing Assignment 6 - Batch Processing 1 Batch Processing Method.
COSTING AND THE VALUE CHAIN CHAPTER 18 PAGE# 794 Faisal
 Discussion 40 minutes  Break 10 minutes  Discussion 40 minutes  Will understand what Standard Work is, and is not  Will be able to study and understand.
1. STARTING POINT Data is an important part of helping State and Local HDs achieve better health outcomes for their constituencies. Currently there appear.
Central Massachusetts Regional Library System Libraries and Lean Thinking An Overview / Workshop May 11, 2009.
C Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, or posted to a publicly accessible website, in whole or in part.
Scholarships and Awards for Majors in Physics and Astrophysics 20 Awards available, $1,000 - $10,000 recognizing Academic achievement, Potential for excellence.
Purchase Orders Notes:.
Just In Time ….. Just in Time Philosophy Salient features  The notion of waste in any operating system  JIT as a philosophy of elimination of waste.
Scientific data storage: How are computers involved in the following?
Sending effective and professional s . Session aims and objectives Lesson Aims and Objectives send s that are fit for purpose and audience.
Value Stream Mapping. Tips Keep it high level Remember this is a value stream map NOT a process map Use approximately 8 process steps Focus on the high.
Production Planning and control – ME 1009 Unit 1 Introduction.
Transportation Waste Definition: the unnecessary act of taking or carrying someone or something from one place to another Office example: Movement of paperwork;
Mel Wendell – Mountain Pointe High School
IT Business Applications
Chapter 27 Cost Management for Just-in-Time Environments
COMPUTER INTEGRATED MANUFACTURING
Fundamentals of Statistical Process Control
Pricing your Products to be Profitable
IENG Lecture 06 Process Tools:
Welcome to my presentation
2.2 | Use Planning Tools.
PRODUCTION PLANNING AND CONTROL
Online Performance Evaluation Tool
Post 16 Return SEPTEMBER 2012.
IENG Lecture 06 Process Tools:
Introduction to Lean and Lean Training
Presentation transcript:

Revisiting VA in Service Industry Last week we stated Value Adding Imparting Knowledge (academic qualifications / CPD) Applying Knowledge (Applied Research) Developing new Knowledge (Pure Research) Positive student service experience Essential Non Value Adding Facilitating systems /departments However we have reviewed this

Manufacturing Service VA Transform material closer to customer requirement Impart, apply, develop Knowledge Positive customer service experience Required to Make value flow Essential facilitating equipment / service Machine Tools Service infrastructure ITS Business development HR Finance Required to be Efficient, accurate, capable, state of the art technology etc Waste Scrap, waiting, inventory, motion, transport, over production, over processing SWIMTOO Inventory, Opportunity lost, Unclear communication, Movement, error, delay, duplication IOU MEDD Reduce or eliminate

Revisiting VA in Service Industry Value Adding - Highest Standard Imparting Knowledge (academic qualifications / CPD) Applying Knowledge (Applied Research) Developing new Knowledge (Pure Research) Positive student service experience Essential facilitating tasks-Most Effective Waste - Remove

Review of last weeks activities Workplace audit 7 Wastes (SWIMTOO)

Workplace improvement activities and the associated tools and techniques Any activity that needs the operation to be performed more than once, i.e. Re submitting course work, filling out duplicated forms, resending emails etc. can all be classified as Not Right first Time, quality defects, The first stage of the improvement process it to measure how many times these occur to determine the quantity of quality defects and the types of defect occurring,

Data collection There are many ways to collect the frequency and type of quality defect starting with simple tally charts General Location Concern Tally Frequency Total 10 40 8 15 5 7 95 IIII III II Check moodle content Contact part time Lecturer for grades Re print lecture notes Change rooms Reject Assessment s Review MID Admin Registry Call students for course work

Data collection Other ways to collect the frequency and type of quality defect include electronic spreadsheets Not right first time check sheet code   Monday Tuesday Wednesday Thursday Friday sat Sunday total 1 incorrect information on job ticket 5 14 2 repair cost needs further authorisation 7 3 incorrect person sent to job 4 do not have the materials to complete the job 11 incorrect materials sent to job 6 18 incorrect location on job ticket 28 further fault finding necessary 8 pulled of job for urgent works 9 Access issues 10 weather issues

Data collection electronic spreadsheets, can then be used to produce Bar charts, pie charts, line charts etc.

Data analysis Analysing the data will help to identify which is the greatest problem and therefore the one we should attempt to fix first. Not right first time check sheet code   Monday Tuesday Wednesday Thursday Friday sat Sunday total 6 incorrect location on job ticket 4 28 5 incorrect materials sent to job 2 18 1 incorrect information on job ticket 14 7 further fault finding necessary do not have the materials to complete the job 3 11 9 Access issues 8 repair cost needs further authorisation 10 weather issues incorrect person sent to job pulled of job for urgent works

Data analysis Re producing our bar chart it is easy to identify that our biggest NRFT is incorrect location on Job ticket.

Case study activity 1 In a group of between 3 and 4 produce a tally chart from the given data collection cards Produce a Bar chart which uses the data you have identified Identify the largest cause for concern

Data analysis Now think of an activity or process that you think is a problem, and then produce a list of the things that may occur to cause the problem Causes of problem tally total

Data analysis You can keep adding to the list anything new that occurs during the data collection phase. At the end of the data collection phase you should review your list of causes and group any that are the same or similar. If more than one person is collecting and selecting the causes for the same activity they will need to go through the lists and agree on the final names for the causes

Data analysis Process Flow Charts Used to analyse the flow of the product through it’s route Key tool Used at various levels of detail Key symbols used See diagram

Process Flow Charts Flow chart allows data to be collected systematically Highlights value adding tasks Highlights non value adding tasks Should be done on the workplace Records as it is now Enables you to ‘speak with data’

Flow chart symbols Symbol Material/worker flow Information flow Adds value? operation operation YES store file NO delay Waiting responce NO transport transport NO inspection Check/ clarification NO Decision process NO

Descriptive chart Store Student Assignments In AS In Archives moderate Mark assessments Wait until All work Is in Move to MF128

Problem Student feedback is not being achieved within the University service agreement time scales

Batch size 30 assignments Flow chart Batch size 30 assignments Distance Time Description 30 s X Take in students work 15 s X View for paper work 5 m 10 s X Store in assessment box 7.5 hrs X Wait for all assessments 45 s X Send lecturer an email 5 days X Waite for lecturer to collect 600 m 3600 s X Transport to MF128 3 days X Store in office 7.5hrs X Mark assessments Send to be moderated 800 m 4600 s X 2days X Waite for moderation 30 min X Enter scores onto moodle 300 s X Send message to student 2 s X Store students work 70 m 120 s X Return students work

Value Added (NVA) Ratio Compares the time a single activity spends in system with the time value is added In a batch transfer system the “in system time” is the batch lead time VA Ratio = Batch lead-time Value added time per component

VA & NVA work content VA Non VA activity 900s Take in students work (each) x 30 450s Check paperwork is correct (each) x 30 300s Place in assessment box (each) x 30 7.5 hrs Wait for all assessments to be handed in 45s Send lecturer an email 5 days Wait for lecturer to collect 3600s Transport to MF128 3 days Store in office 7.5 hours Mark assessments 4600s Send to moderator 2 days Wait for moderation 30 min Enter scores onto moodle 300 s Send message to students to collect work 10days Wait for students to collect work 120 s Give back work to individual students 8.35 hours 16 hours Total lead time per batch

NVA ratio VA Ratio = Value added time per component Batch lead-time 160 hours (8.35 hrs total / 30 assessments = 0.27 hrs) VA Ratio = 1:572

NVA ratio analysis Q :What does it tell us? A: We have a big problem with Non Vale added activities with in the process Q:What do we do with the information? A: Carryout Pareto analysis and identify biggest waste

Spaghetti diagrams and work flow SEQUENCE Move Queue Administrators desk Add value Storage cupboard Move MF 128 Ian’s desk Queue Student pick up point. Student hand in point. Add value Rays desk AS116 etc. Central achieves etc. CHARACTERISTIC Lead time short/long? WIP low/high? Easy to control yes/no? Responsive no/yes? Non value adding/value adding ratio high/low

Case study activity 2 Using the information from the flow chart activity produce a spaghetti diagram showing the information flow

Case study activity 3 Using the job cards and map provided produce a spaghetti diagram for a given days workload. Identify the Value added Vs Non Value added ration

Insert map of Coventry http://wwwm.coventry.ac.uk/university/maps/Documents/campus_map.pdf

Data collection and analysis equipment High tech Low tech

Bring to next weeks session data you have collected around you problem Your analysis of the data (Pareto analysis, workflow diagram, spaghetti diagram VA analysis).