People First … Mission Always Capability Maturity Model Integration (CMMI ® ) Millee Sapp 2 Dec 08 Warner Robins Air Logistics Center.

Slides:



Advertisements
Similar presentations
Implementing CMMI® for Development Version 1.3
Advertisements

Kai H. Chang COMP 6710 Course NotesSlide CMMI-1 Auburn University Computer Science and Software Engineering Capability Maturity Model Integration - CMMI.
National Cheng-Kung University
Copyright 2005 CMMI and ITIL Alison Adams & Kieran Doyle.
Copyright 2003 CMMI: Executive Briefing Presented by Kieran Doyle
CMMI Overview Dr. Korson Software Engineering. 2 Immature organizations can be successful on occasion, but ultimately run into difficulties because –Success.
Sarbanes Oxley & CMMI Mazars / Lamri
CPIS 357 Software Quality & Testing I.Rehab Bahaaddin Ashary Faculty of Computing and Information Technology Information Systems Department Fall 2010.
Stepan Potiyenko ISS Sr.SW Developer.
18 th International Forum on COCOMO and Software Cost Modeling October 2003 Use of Historical Data by High Maturity Organizations Rick Hefner, Ph.D.
Capability Maturity Model Integration (CMMI). CMMI Enterprise-wide process improvement framework Focuses on processes for improved product Process areas:
Software Quality Processes – Part II CSSE 376, Software Quality Assurance Rose-Hulman Institute of Technology March 19, 2007.
Adaptive Processes Comparing CMMI 1.2 vs. CMMI 1.1 LN Mishra Adaptive Processes Consulting.
Lecture 11 CMM CSCI – 3350 Software Engineering II Fall 2014 Bill Pine.
Capability Maturity Model Integration (CMMI) COMP Group Assignment #1 Ario Nejad, Davit Stepanyan, Ian Jackman, Sebastian Henneberg, Wan Chi Chio.
Using Six Sigma to Achieve CMMI Levels 4 and 5
Chapter : Software Process
Process: A Generic View
CMMI Course Summary CMMI course Module 9..
Capability Maturity Model Integration
Integrated Capability Maturity Model (CMMI)
Training on “CMMI for Development – ver 1.2”
TRIALS & TRIBULATIONS ON THE ROAD TO CMMI Process Focus Management Roselyn Whitney Principal 9956 North River Rd. Algonac, MI
COMPANY CONFIDENTIAL Page 1 Final Findings Briefing Client ABC Ltd CMMI (SW) – Ver 1.2 Staged Representation Conducted by: QAI India SM - CMMI is a service.
The Capability Maturity Model in Software Development Paul X. Harder, JD Government Micro Resources, Inc. September 14, 2004.
Process Assessment Motivation SEI Capability Maturity Model
CMMi What is CMMi? Basic terms Levels Common Features Assessment process List of KPAs for each level.
Software Engineering Lecture # 17
HONCHO COMMERCIAL PVT LTD QMS Overview Jan’2015
NDIA Systems Engineering Supportability & Interoperability Conference October 2003 Using Six Sigma to Improve Systems Engineering Rick Hefner, Ph.D.
Process Management Process Management in software started in late 1960’s (but informally and inconsistently) Software Engineering Institute (SEI) is the.
10/16/2015Bahill1 Organizational Innovation and Deployment Causal Analysis and Resolution 5 Optimizing 4 Quantitatively Managed 3 Defined 2 Managed Continuous.
Gary Natwick & Jim Cocci November 2003 Understanding the CMMI ® Validation Process Area CMMI ® Technology Conference & User Group 2003 assured.
CS 3610: Software Engineering – Fall 2009 Dr. Hisham Haddad – CSIS Dept. Chapter 2 The Software Process Discussion of the Software Process: Process Framework,
Capability Maturity Model CS3300 Fall The Problem Contractors over budget and late. Need a way to rank how likely a software company is to deliver.
1 ISO 9001:2000 ISO 9001 is the creation of the International Organisation for Standardisation (ISO), a Swiss-based federation of national standards bodies.ISO.
1 © Mahindra Satyam 2009 Mahindra Satyam Confidential Welcome To CMMI Introduction.
1 通信软件开发与管理 Course OD601 学时: 32 学分: 2 讲师:罗文彬. 2 Communication Overview System Architecture Overview Performance and Reliability Operation, Administration,
IS Methodologies. Systems Development Life Cycle - SDLC Planning Planning define the system to be developed define the system to be developed Set the.
1 1 Major Changes in CMMI v1.3 Configuration Management Working Group April 12, 2011.
Everything You Ever Wanted to Know About CMMI in 30 Minutes or LESS CCS TECHNICAL SERVICES (484) CCS TECHNICAL SERVICES (484) William.
Software Engineering - I
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
Requirements Development in CMMI
January 2003 CMMI ® CMMI ® V1.1 Tutorial Sponsored by the U.S. Department of Defense © 2003 by Carnegie Mellon University SM CMM Integration and SCAMPI.
________________________________________________________________________ Jonsson School of Engineering and Computer Science Dr. Mark C. Paulk 2015 ASEE.
Ch-1 Introduction The processes used for executing a software project have major effect on quality of s/w produced and productivity achieved in project…
Purpose: The purpose of CMM Integration is to provide guidance for improving your organization’s processes and your ability to manage the development,
An Introduction. Objective - Understand the difference between CMM & CMMI - Understand the Structure of CMMI.
Evidence about the Benefits of CMMI ® What We Already Know and What We Need to Know Joe Jarzombek, PMP Deputy Director for Software Assurance Information.
Software Engineering (CSI 321) Software Process: A Generic View 1.
CMMI1 Capability Maturity Model Integration Eyal Ben-Ari 8/2006.
MSA Orientation – v203a 1 What’s RIGHT with the CMMI?!? Pat O’Toole
Project Management Strategies Hidden in the CMMI Rick Hefner, Northrop Grumman CMMI Technology Conference & User Group November.
© 2004 Tangram Hi-Tech Solutions Project Management According to the CMMI1 Project Management according to the Capability Maturity Model (CMMI)
CMMI for Services, Version 1.3
Certification: CMMI Emerson Murphy-Hill. Capability Maturity Model Integration (CMMI) Creation of the Software Engineering Institute (SEI) at Carnegie.
A Comparison of CMMI & SPICE
CMMI Certification - By Global Certification Consultancy.
Serving IT up with ITIL By Thane Price. IT is the laboratory’s pit crew  Goal : Make technology transparent while accomplishing valuable internal customer.
Overview of CMMI Global Certification Consultant is aiming to designed CMMI Presentation to share knowledge about CMMI,
Software Engineering (CSI 321)
Level - 3 Process Areas (CMMI-DEV)
CMMI – Staged Representation
The Journey to CMMI Level 4
Interpretive Guidance Project: What We Know CMMI User’s Conference
Use of CMMI in an Acquisition Context Using CMMI for Process Improvement at USAF Space and Missile Systems Center (SMC) Dr. Jack R. Ferguson
Requirements Development in CMMI
Capability Maturity Model
Presentation transcript:

People First … Mission Always Capability Maturity Model Integration (CMMI ® ) Millee Sapp 2 Dec 08 Warner Robins Air Logistics Center

W A R N E R R O B I N S A I R L O G I S T I C S C E N T E R People First … Mission Always 2 What is the CMMI? Process improvement maturity model for the development of products and servicesProcess improvement maturity model for the development of products and services Consists of best practices that address development and maintenance activities that cover the lifecycle from conception through delivery and maintenanceConsists of best practices that address development and maintenance activities that cover the lifecycle from conception through delivery and maintenance Helps set process improvement goals and prioritiesHelps set process improvement goals and priorities Provides guidance for quality processesProvides guidance for quality processes Provides a point of reference for appraising current processesProvides a point of reference for appraising current processes

W A R N E R R O B I N S A I R L O G I S T I C S C E N T E R People First … Mission Always 3Sponsors DoD (Office of the Undersecretary of Defense – Acquisition, Technology, & Logistics)DoD (Office of the Undersecretary of Defense – Acquisition, Technology, & Logistics) Industry (National Defense Industrial Organization – NDIA)Industry (National Defense Industrial Organization – NDIA) Software Engineering Institute (Steward of Model)Software Engineering Institute (Steward of Model)

W A R N E R R O B I N S A I R L O G I S T I C S C E N T E R People First … Mission Always 4 Continuous Representation Project Management Process Areas Category Requirements Management Requirements Development Technical Solution Product Integration Verification Validation Engineering Configuration Management Process and Product Quality Assurance Measurement and Analysis Decision Analysis and Resolution Causal Analysis and Resolution Support Project Planning Project Monitoring and Control Supplier Agreement Management Integrated Project Management +IPPD Risk Management Quantitative Project Management Organizational Process Focus Organizational Process Definition +IPPD Organizational Training Organizational Process Performance Organizational Innovation and Deployment Process Management Slide adapted from Intro to CMMI Course

W A R N E R R O B I N S A I R L O G I S T I C S C E N T E R People First … Mission Always 5 Staged Representation Organizational Innovation and Deployment Causal Analysis and Resolution 5 Optimizing 4 Quantitatively Managed 3 Defined 2 Managed Continuous Process Improvement Quantitative Management Process Standardization Basic Project Management Organizational Process Performance Quantitative Project Management Requirements Development Technical Solution Product Integration Verification Validation Organizational Process Focus Organizational Process Definition +IPPD Organizational Training Integrated Project Management +IPPD Risk Management Decision Analysis and Resolution Requirements Management Project Planning Project Monitoring and Control Supplier Agreement Management Measurement and Analysis Process and Product Quality Assurance Configuration Management Risk Rework 1 Initial Process AreasLevel Focus Quality Productivity 1 Initial Slide adapted from Intro to CMMI Course

W A R N E R R O B I N S A I R L O G I S T I C S C E N T E R People First … Mission Always 6 SCAMPI Appraisal Method Organization/ Projects Process Deployment Lessons Learned/ Improvements Appraisal Team Findings, Recommendations Actual Practice Appraisal Requirements The Process Organizational Process Suite Slide adapted from Intro to CMMI Course

W A R N E R R O B I N S A I R L O G I S T I C S C E N T E R People First … Mission Always 7 Appraisal Method Classes RequirementsClass AClass BClass C Types of Objective Evidence Gathered Documents and interviews Documents or interviews Ratings GeneratedGoal ratings required Not allowed Organizational Unit Coverage RequiredNot required Minimum Team Size421 Appraisal Team Leader Requirements Lead Appraiser Person trained and experienced Slide adapted from Intro to CMMI Course

W A R N E R R O B I N S A I R L O G I S T I C S C E N T E R People First … Mission Always 8 Costs May Vary The cost of CMMI adoption is highly variable depending on many factors, including organizational goals size culture structure processes Regardless of the investment, organizations generally experience a respectable return on their investment. Slide adapted from Intro to CMMI Course

W A R N E R R O B I N S A I R L O G I S T I C S C E N T E R People First … Mission Always 9 Benefit Information Information about CMMI benefits is available in the August 2006 SEI technical report, Performance Results of CMMI-Based Process Improvement (CMU/SEI-2006-TR-004). This report is based on public reports, interviews, supplementary materials, and comprehensive literature review. It is available on the SEI Web site at tr004.html. tr004.html tr004.html For more information, see the CMMI Performance Results Web site at Slide adapted from Intro to CMMI Course

W A R N E R R O B I N S A I R L O G I S T I C S C E N T E R People First … Mission Always 10 Performance Measures Performance CategoryMedian Improvement Cost34% Schedule50% Productivity61% Quality48% Customer Satisfaction14% Return on Investment4:1 The performance results in the following table are from 30 different organizations that achieved percentage change in one or more of the six categories of performance measures below. Slide adapted from Intro to CMMI Course

W A R N E R R O B I N S A I R L O G I S T I C S C E N T E R People First … Mission Always 11 Process Improvement Background Began work with Software Engineering Institute Avionics Organization Appraised at CMM-SW Level 3 EW and F-15 Organizations Appraised at CMM-SW Level 2 Consolidated Software Organizations Software Engineering Division Appraised at CMM-SW Level 3 Participated in WR-ALC Pilot of CMMI Transitioned to CMMI Rolled Out Revised Software Engineering Process Software Engineering Division Appraised at CMMI-SW ML 5 Performed SCAMPI Class B Appraisals 2007 Enhanced Measurement Processes 2006

W A R N E R R O B I N S A I R L O G I S T I C S C E N T E R People First … Mission Always 12 Process Improvement Infrastructure Software Engineering Process Group (SEPG) (SEPG) SquadronBSquadronBSquadronDSquadronD SquadronASquadronASquadronCSquadronC SquadronESquadronE Test Program Set (TPS) Development and TPS Maintenance & Modification Domains Quality Metrics Group(QMG) Group(QMG) Technology Integration Group (TIG) (TIG) Measurement Working Group(MWG) Group(MWG) Software Steering Team(SST) Team(SST) Operational Flight Program Domain

W A R N E R R O B I N S A I R L O G I S T I C S C E N T E R People First … Mission Always 13 Process Improvement Infrastructure Project’s Defined Software Process (PDSP) and Project Plans Business Goals Organizational Policies Organization’s Standard Software Process (OSSP) Squadron Level Processes SST SEPG/QMG Domain WGs/ Squadron Process POCs Project Teams ORGANIZATIONALORGANIZATIONAL DOCUMENTSDOCUMENTS

W A R N E R R O B I N S A I R L O G I S T I C S C E N T E R People First … Mission Always 14 Sample of Results at WR-ALC Project A Block Cycle Change Reduced flight tests by 50% Reduced flight tests by 50% Delivered block cycle 27% under cost and on schedule Delivered block cycle 27% under cost and on schedule Delivered 50% more change requests than planned Delivered 50% more change requests than planned No defects detected No defects detected Project B Block Cycle Change Reduced flight tests by 50% Reduced flight tests by 50% No defects detected No defects detected TPS Development 25% decrease in effort 25% decrease in effort

W A R N E R R O B I N S A I R L O G I S T I C S C E N T E R People First … Mission Always 15 Words of Advice – Implementer’s Perspective Build business case for implementing improvement programBuild business case for implementing improvement program Ensure solid measurement program is in placeEnsure solid measurement program is in place Investment is requiredInvestment is required Patience and perseverance are essentialPatience and perseverance are essential “High maturity is not for sissies!”“High maturity is not for sissies!”

W A R N E R R O B I N S A I R L O G I S T I C S C E N T E R People First … Mission Always 16 Contact Information Millee Sapp