TSP PACIFIC - PRESENTATION Second CBS/GCOS Expert Meeting on Coordination of the GSN and GUAN Asheville, September 2005 Betio Atoll & Lagoon, Tarawa, Kiribati.

Slides:



Advertisements
Similar presentations
INTERNATIONAL ASSISTANCE Australia Colonel Lindsay Morton.
Advertisements

World Meteorological Organization (WMO) Severe Weather Forecasting and Disaster risk reduction Demonstration Project (SWFDDP) Steve Ready WMO RA V SSWS.
WMO World Climate Program CLIMAT Report Forming System CliRep TSP Coordination Meeting Miami, Florida, USA May 05 Betio Atoll & Lagoon, Tarawa, Kiribati.
RSMC Nadi Activity Report
1 Introduction Meteorological communications in the SW Pacific AFTN for many years – then it became a charged service in many countries Countries switched.
ITSF STORE BUSINESS SOLUTION PRESENTATION. STORE MODULE INCLUDES: Material Management Purchasing Components Handling Shipments Receiving of parts Store.
Status of GSN-GUAN Improvement Activities Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva, Switzerland.
Julie Fletcher Manager Marine Observations, NZ Chair, VOS Panel PMO-III, March 2006, Hamburg, Germany. Ship Inspections.
International Civil Aviation Organization Presentation Title Regional Cooperation for the Enhancement of Safety Oversight Topic 1.1 – Purpose and classification.
Pacific network for NHA and evidence based policy making - update 4th Technical Review Meeting, Nossal Institute Martina Pellny, WHO DPS, Fiji Melbourne,
Intracompany Stock Transfer Scenario Overview
Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva.
Sushil Ram CYP Pacific Centre. Pacific regional Conference on “Investing in Youth Employment” Held in Port Vila Vanuatu 45 key stakeholders working directly.
United Nations Expert Group Meeting on Revising the Principles and Recommendations for Population and Housing Censuses New York, 29 October- 1 November.
Asia Pacific Consultation on Building Regional Evidence for the First High Level Meeting of the Global Partnership for Effective Development Cooperation.
Stoimen Stoimenov QA Engineer SitefinityLeads, SitefinityTeam6 Telerik QA Academy Telerik QA Academy.
Network Design and Implementation
Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva.
Managing the Information Technology Resource Jerry N. Luftman
Disability Surveys in the Pacific A collaboration between Inclusion International, Asia Pacific Region NZAID& participating Pacific countries.
AOPC Workplan List of collected ideas for a: Work plan towards a GCOS strategy – Including a position on how to address regional / local requests for climate.
Abstract has 6 upper air stations for GPS S SR2K2 Modemwith Radiosonde M2K2_DC, 6 Upper Air stations of RDF Radiotidolite RT20A ( Vaisala ) and three Upper.
The Global Environment Facility 4 th Biennial International Waters Conference July 31 – August , Cape Town, South Africa Managing and Conserving.
THE UNIVERSITY OF THE SOUTH PACIFIC 14 CAMPUSES IN 12 MEMBER COUNTRIES.
The Maintenance and Engineering Organization
AGG Report Back to AOPC Phil Jones and Tim Oakely.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
Page 1© Crown copyright 2005 Voluntary Cooperation Work Richard Smout, John Nash, Jeremy Gillham, Mark Smees and Steve Palmer.
Reference U/A for GCOS Seattle 2006 Richard K. Thigpen GCOS Secretariat Geneva.
STRATEGIC ACTION PROGRAMME (SAP) FOR THE INTERNATIONAL WATERS OF THE PACIFIC SMALL ISLAND DEVELOPING STATES A programme of the Governments of: Cook Islands,
BSBCMN205A Use Business Technology Session 6 1 Maintain Technology.
1 Pacific Logistics Cluster. 2 What is Logistics ? Several Definitions… Getting the right thing at the right time in the right place at the right cost…
Objectives: Identify problems that can occur if hardware is not properly maintained Identify routine maintenance that should be performed by users Identify.
GCOS Implementation Project Manager’s Report Richard K. Thigpen GCOS Secretariat Geneva, Switzerland.
The Pacific IWRM Programme Component 1: Demonstration, Capture and Transfer of Best Practices in IWRM and WUE Component 2: IWRM and WUE Regional Indicator.
Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva.
OVERVIEW OF THE PACIFIC ISLAND REGION GLOBAL CLIMATE OBSERVING SYSTEM (GCOS) PROGRAM Howard J. Diamond, NOAA/NESDIS, Office of the CIO, 1335 East-West.
Research on Capacity Development of Pacific Disabled People’s Organisations Progress Report May 2011 Pacific Disability Forum.
Third Regional Steering Committee Meeting, Palau, 30 th July -3 rd August 2012 GEF Pacific IWRM Project Status Report.
Australian Bureau of Meteorology Station Metadata “SitesDb” Karl Monnik Technical & Field Support Observations & Engineering Program.
Life cycle services for automation products
Baseline Framework Reforms Progress: Information Technology Ezra Dick & Tony Lester August 2011.
On Overview of PFM in the Pacific S Joshi IMF/PFTAC PFM Advisor Suva, Fiji.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Slide no. 1 © South African Tourism 2011 Click to edit Master subtitle style SA Tourism Presentation of the SA Tourism to Portfolio Meeting Tuesday 6 September.
Simplifying the Budget Process
Decent Work for All ASIAN DECENT WORK DECADE Ray Grannall Regional Senior Specialist for Skills Development for Asia Pacific Region Asia Pacific.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
Petroleum Advisory Service 2015 Activities update Pacific Energy Advisory Group meeting 17 November 2015 Nabua, Fiji SPC Petroleum Worshop - December
Duration: 53 months Key Implementing Units: The Secretariat of the Pacific Community; and The University of the South Pacific. IRENA: Regional Consultative.
Roy Thompson, Electronics Technician, National Meteorological Service of Belize address RA-IV WIGOS Implementation Workshop.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Working Group on Information Sharing
Consensus Rainfall Forecast – June to August 2017
Joint GCOS – WMO Integrated Global Observing System Workshop for the Pacific Small Island Developing States (SIDS) 9-12 October 2017, Nadi, Fiji. Simon.
Status update CREWS Pacific Regional Project:
Obtaining High Quality Data in Developing Countries
Joint GCOS – WMO Integrated Global Observing System Workshop for the Pacific Small Island Developing States (SIDS) 9-12 October 2017, Nadi, Fiji. GCOS.
Pacific Regional Navigation Initiative
South West Pacific Hydrographic Commission (SWPHC)
South West Pacific Hydrographic Commission (SWPHC)
IMS UPDATE (Information Management System) 9th Tuna Data Workshop
System for a Transparent Allocation of Resources - STAR
ATTORNEYS AND SOLICITORS
Status of GSN-GUAN Improvement Activities
GISC Melbourne Status Report
Progress report CREWS STEERING COMMITTEE 7 November 2017
IMSAS and the role of the SWPHC
Pacific Hazardous Waste Management Programme (PACWASTE)
TUFMAN – Developments and future plans
Presentation transcript:

TSP PACIFIC - PRESENTATION Second CBS/GCOS Expert Meeting on Coordination of the GSN and GUAN Asheville, September 2005 Betio Atoll & Lagoon, Tarawa, Kiribati

2 Garry Clarke International Operations Manager Communications expert PI-GCOS Presenter MetService, Wellington, NZ

3 Presentation Outline  Organizational structure  Program activities  Completed and planned work (including site visits)  Problems and solutions  Performance metrics  Inspections and calibrations  Equipment  Site meta-data  RS-92 issues  Better than before Proton training, Galapagos Is.

4 Organizational Structure - TSP Global Distribution Op. Data TSP Countries MS Op. Data Gateway SPAM Bin Archive & Monitoring Intl Ops Manager MIDAS Engineers GCOS Sec. Dick Tony Garry Lots ! Data GTS Faulty messages Manual fix Remote & in-country support Mng. & Reporting Operational things RTH * * Papua New Guinea, Solomon Islands, Vanuatu

5 Countries provided for – GUAN, GSN  Cook Islands  Fiji  Kiribati  Niue  Papua New Guinea  Solomon Islands  Tokelau Islands  Tonga  Tuvalu  Vanuatu Penrhyn Radar (28 years old)

6 TSP Countries Kiribati Solomon Islands Papua New Guinea Vanuatu Fiji Tonga Samoa Tokelau Is. Cook Is Niue Pitcairn Island Comparative distance – Los Angeles to Washington Tuvalu

7 Upper air stations in TSP Countries Kiribati Solomon Islands Papua New Guinea VanuatuFiji Tonga Samoa Tokelau Is. Cook Is Niue Pitcairn Island Tuvalu Active Active, may stop soon Silent Non GUAN WMO US DOE ARM Project KEY Penrhyn Tarawa Funafuti Port Moresby Honiara Bauerfield Nadi Rarotonga Momote (Manus Is)

8 Stations provided for – GUAN, GSN Stn No.Station 91490Christmas Is (Kiritimati) 91610Tarawa 91701Kanton 91503Munda 91517Honiara 91554Tekoa Airport, Santo 91557Bauerfield 91568Aneityum 91631Nanumea 91643Funafuti 91650Rotuma 91652Udu Point 91680Nadi Stn No.Station 91699Ono I Lau 91724Nukunonu 91780Lupepau’u 91789Nuku’alofa 91802Penrhyn 91812Pukapuka 91831Aitutaki 91843Rarotonga 91824Hanan Airport 92014Madang 92035Port Moresby 92044Momote 91960Pitcairn Island Active GUAN Silent GUAN All GSN except Bauerfield

9 Program activities  Routine GUAN stn visits – Tarawa, Funafuti  Fault mtce visits (3 allowed – none needed so far)  GUAN stn supply ground equipment consumables  GUAN stn – supply technical spares  GUAN stn – reimburse local expenses as agreed  GSN stn – establish inspectors kits  GSN stn – inspections costs, in-country, kit recal. Db.  Reserve funds – GUAN spares, other agreed activity  Program management and administration

10 Routine / Fault GUAN station visits  Present programme allows for one routine visit to Tarawa and Funafuti  Both will be completed in May / June by engineers  Three fault maintenance visits budgeted (VCP requirement), none needed so far.  One fault visit remains in budget  Budgeted funds for other two diverted (along with other savings) to training course and GUAN surveys Penrhyn technician and “truck” (what’s left of it!)

11 GUAN station supplies  Regional spares kit established for:  Proton Hogen 20 generators (Depot Kit)  Digicora  Other supplies as required, as can be funded e.g.  Demineraliser cartridges  Radar thyratrons  Reimburse local costs  Nothing needed so far Balloon release, Tarawa, Kiribati

12 GSN Station Inspection kits  Designed and manufactured by MetService  Three kits for TSP countries to do inspections and update meta-data, check instrument serviceability Inspectors barometer TSP GSN Station Inspection Kit

13 GSN Station Inspection kits TSP GSN Station Inspection Kit - components

14 GSN Station Inspections  Provides for  Each country’s travel disbursements to do its GSN station inspections  Freighting the kit  Kit recalibration and replacement of used items  Entry of returned meta-data from the inspections Funafuti Atoll, Tuvalu 91643

15 Program management & administration  Provides for  Management and administration functions that are associated with the TSP – internal and external Coordination of program activities Financial planning and control Interactions with stakeholders Performance monitoring Reporting  Meta-data database construction Penrhyn radar – WF3 prototype – supplied 1977

16 Completed and planned work  Completed work Remote support to GUAN stations – many areas Enhanced GUAN/GSN performance monitoring and interaction with GUAN stations when data not received (as practicable) Enhancing performance metrics Facilitation of GUAN messages throughput In-country support under TSP for some items e.g. replacement printer Port Moresby, power supply Funafuti System spares – radar thyratrons – Penrhyn (in progress) Establish GSN Inspection kits GSN Station inspections (in progress) Establish regional spares kits Construction of meta-data reporting system (in progress) GUAN station surveys – Port Moresby and Honiara CLIREP, inspection kit training course Programme management

17 Completed and planned work  Planned work – to 30 June 2005 Routine station visits – Tarawa and Funafuti (June) Continue GSN station inspections Complete meta-data reporting system Supply thyratrons to Penrhyn Provide Honiara GUAN survey report Add PNG stations to performance monitoring Programme management Balloon release Port Moresby

18 Completed and planned work  Suggested work – July 2005 – June 2006 Subject to GCOS objectives, priorities, approvals and funding Continue TSP support and extend to any new/restored GUAN stations One routine visit each year to GUAN stations (technical and management) If GUAN station numbers increase budget three fault trips, undertake only if needed, otherwise budget two Improve communications of upper air messages Enhance performance metrics – GUAN and GSN Continue station inspections, filing meta-data and sending to NCDC, kit re-calibration etc Identify GSN station’s needs resulting from inspections Establish CLIREP in each country, as required, with one- on-one mentoring

19 Problems and solutions - GUAN  Problems You can’t rely on countries to keep you informed Programs can just stop because bills havn’t been paid and supplier has cut them off, e.g. power and communications or there are technical issues Consumables run out and the program stops Message preamble is faulty causing messages not to file Equipment develops a fault and no-one says anything  Solutions You must monitor stations’ output – daily if practicable Ask questions if exceptions occur Monitor stock holdings and request monthly stock on hand if returns aren’t routinely filed

20 Problems and solutions - GSN  Problems You can’t rely on countries to keep you informed Communications, communications, communications – many issues – radio faults, ISP problems – congested systems  Suspect instruments and observing practices Staff performance issues Message preamble is faulty causing messages not to file  Solutions Monitor performance – impractical to do so daily Improve communications systems Inspect GSN stations – inspections have started Advise stations of incorrect preambles

21 Performance metrics  We monitor station performance for GUAN and GSN in the region  This process has been enhanced and expanded for TSP PNG, Vanuatu, Solomon Islands stations added Converting monitoring GUAN termination heights from altitude to pressure We are trying to develop meaningful comparisons pre / post TSP stations’ performance Performance chart example

22 Performance metrics - GUAN Performance chart examples

23 Performance metrics - GSN Performance chart example As received by MetService and compared against WMO published station reporting times

24 Inspections and calibrations - GUAN  Equipment is inspected routinely during GUAN station visits  There is a Proton calibration that station staff have been instructed in but engineers check this during visits regardless  No other calibrations are required of upper air equipment Proton training Tarawa

25 Inspections and calibrations - GSN  Countries have commenced inspecting their GSN stations using TSP inspections kits  We believe most stations will not have been inspected in 10 years  Once the kits are returned and inspection data analyzed we will have a better idea of station instrument accuracies Instrument enclosure, Tarawa

26 Equipment  Tarawa, Funafuti and Penrhyn  All have “new” Protons and  All have old Vaisala Digicora II ground stations that require upgrading to take RS-92 radiosondes  Port Moresby  Digicora I, upgraded by Bureau of Meteorology, for RS-92  Teledyne hydrogen generator 10 years old (an orphan) New hydrogen gas tanks, Tarawa

27 Equipment  Bauerfield and Honiara  Silent stations with unserviceable M28 hydrogen generators  Digicora II both require repair and upgrading for RS92 Silent Upper air station, Honiara

28 Site meta-data  GSN stations  Underway with inspections process and creation of a meta- data system for entering and storing data at MetService and passing to NCDC, copy to go back to country  GUAN stations  Really still to be done, but will by nature be less involved than GSN. Digicora testing, Bauerfield

29 RS-92 issues  MetService approach to upgrading Digicoras  We have issued an RFP to suppliers for our own stations and will await the outcome of that before making a recommendation to the UKMO regarding upgrading at Tarawa, Funafuti and Penrhyn  The decision will be based on economics and include capital and consumable costs  MetService has budgeted for the upgrade and the UKMO has kindly agreed to fund through their Pacific Trust Fund we administer Digicora testing, Honiara..hot and humid – check out the shirt!

30 Better than before  We need to focus on demonstrating improvements as a result of the TSP GUAN  Improvements to existing station performance – either better termination heights or improved numbers of flights per month  But…existing stations numbers of flights (maybe Tarawa excepted) are not too bad…they would be a bit worse if not for the TSP but how do you show that?  Bringing “silent” stations on line and lifting their performance Not GUAN, included as some interest has been expressed in this station. We are holding a surplus, incomplete Digicora for it, donated by UKMO

31 Better than before  We need to focus on demonstrating improvements as a result of the TSP GUAN  Can make some gains in going from 350gm to 700gm balloons – in progress for Tarawa and Funafuti and done for Penrhyn (not strictly ‘cos of the TSP but…)  Ensuring data gets to archiving centres Penrhyn termination heights Change to 700gm

32 Better than before  We need to focus on demonstrating improvements as a result of the TSP GSN (to the extent that this is a priority)  Establish CLIREP  Improve communications (this will show an improvement in the performance metrics)  Repair/replace instruments according to inspection results  Continue inspection programs; maybe consider providing a GSN station inspection kit for each country Tony Veitch and Bill Witham discussing Honiara GUAN survey with Director, Chanel Iroi

Betio Atoll & Lagoon, Tarawa, Kiribati