1 July 19, 2006M. Woods, SLAC (S. Boogert, RHUL) Collimator design, wakefields (T-480) BPM.

Slides:



Advertisements
Similar presentations
08/01/2007Juan Luis Fernandez-Hernando End Station A Measurements on Collimator Wakefields 4th Wakefield Interest Group - CI 05/03/2008 Luis Fernandez-Hernando,
Advertisements

Energy spectrometer cavity BPM Royal Holloway, University of London S. Boogert, G. Boorman University of Cambridge M. Slater, M. Thomson & D. Ward University.
BPM Energy spectrometry, status & future plans at ESA in SLAC Bino Maiheu University College London Yerevan Collaboration Meeting October 2006 Yerevan.
Fast and Precise Beam Energy Measurement at the International Linear Collider Michele Viti.
March 22, 2011Mike Hildreth – ALCPG 2011, Beam Instrumentation Energy Spectrometer R&D; Plans for End Station A Test Beams Mike Hildreth University of.
October 1, 2009Mike Hildreth – ALCPG09 Energy Spectrometer R&D Progress and Plans Mike Hildreth University of Notre Dame representing SLAC T-474/491 &
M. Woods (SLAC) BI Tests for the Linear Collider Turning the LOI into a Proposal SLAC ALCPG Meeting Jan. 9, 2004 M. Woods, SLAC LC-LEP Beam Tests at SLAC.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
June 15, 2005Marc Ross (ILC) – Instrumentation Development ILC Instrumentation Development Marc Ross, SLAC.
1 June 7, 2006M. Woods, SLAC Collimator design, wakefields (T-480) BPM energy spectrometer.
1 M. Woods, SLACMDI SLAC WORKSHOP Machine-Detector Interface at the International Linear Collider Jan. 6-8, 2005SLAC Introduction to Topic of.
March 17, 2011Mike Hildreth – SLAC ESA Testbeam Workshop Energy Spectrometer Tests at End Station A Mike Hildreth University of Notre Dame SLAC, March.
K. Moffeit 6 Jan 2005 WORKSHOP Machine-Detector Interface at the International Linear Collider SLAC January 6-8, 2005 Polarimetry at the ILC Design issues.
Machine-Detector Interface MDI Panel Report MDI Panel is one of several World-Wide Study (WWS) panels (R&D, Detector costing, MDI, 2 IRs) Interim panel.
P.N. Burrows GDE/MDI Vancouver 19/7/06 (T-488) Philip Burrows John Adams Institute Oxford University EM Background Tests of Feedback BPM.
20 March 2005Ken Moffeit LCWS1 Highlights from the MDI workshop Spin Rotation System for 2 IR’s Downstream polarimetry Ken Moffeit.
EM background tests of IP feedback hardware Christine Clarke Oxford University 24 th September 2007 Oxford (P. Burrows, C. Perry, G. Christian, T. Hartin,
1 DOE FACET Review, Feb. 19, 2008 M. Woods, SLAC FACET Review: End Station A Facility and Science ESA provides 2 nd experimental facility expands FACET’s.
Philip Burrows BDS, LCWS08 Chicago, 17/11/081 BDS Instrumentation Philip Burrows John Adams Institute, Oxford University Thanks to: Mike Woods, Manfred.
M. Woods (SLAC) Beam Diagnostics for test facilities of i)  ii) polarized e+ source January 9 –11, 2002.
12/12/04 1 Stewart Boogert (UCL) Second Mini-workshop Nano project at ATF UK plans for Energy spectrometer studies University College London Stewart Boogert.
___________________ Jürgen Schreiber, ECFA/DESY LC workshop, Amsterdam, April 1-4, 2003 BEAM ENERGY SPECTROMETER DESY – Dubna – TU Berlin Machine physicists,
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
Philip Burrows ECFA LC Workshop, Warsaw, 10 June Philip Burrows John Adams Institute Oxford University G. Christian, C. Clarke, B. Constance, H.
WP9 : Cavity BPM spectrometry Royal Holloway S. Boogert & G. Boorman University College London D. Attree, A. Lyapin, B. Maiheu & M. Wing Cambridge University.
January 8, 2005Mike Hildreth – ILC-MDI Workshop A BPM-Based Energy Spectrometer Technical Considerations & Plans for the End Station A Test Beam Mike Hildreth.
ILC BCD Crossing Angle Issues G. A. Blair Royal Holloway Univ. London ECFA ILC Workshop, Vienna 14 th November 2005 Introduction BCD Crossing Angle Rankings.
ILC EMI and bunch length measurements Gary Bower, SLAC Nick Sinev, U. Oregon, speaker Sean Walston, LLNL.
Vertex Detector Review, FNAL, October Beam-induced EMI and detector electronics Gary Bower, SLAC LaVonda Brown, Norfolk State University Nick.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
1 of 29 LCWS’06, March 2006T. Markiewicz for M. Woods, SLAC LCWS’06 Bangalore March 12, 2006.
1 Collimator Design Adriana Bungau The University of Manchester, UK Annual EuroTev meeting - Frascati, Italy, January 2008.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Andrei Seryi ILC BDS, DOE review 1 June 2005 The ILC Beam Delivery System, ATF2 and ESA Andrei Seryi SLAC DOE High Energy Physics Program Review June 14-15,
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
A Short History of Nearly Everything Michele Viti.
S. Molloy, P. Emma, J. Frisch, R. Iverson, M. Ross, D. McCormick, M. Woods, SLAC, CA, USA S. Walston, Lawrence Livermore National Laboratory, CA, USA V.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Collimator design and short range wakefields Adriana Bungau University of Manchester CERN, Dec 2006.
IRENG, SLAC, September 17-21, 2007 Beam-induced EMI and detector electronics Gary Bower, SLAC LaVonda Brown, Norfolk State University Nick Sinev, University.
SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.
Beam Delivery System collimators J. L. Fernandez-Hernando STFC/ASTeC Daresbury Lab.
SLAC ESA T-474 ILC BPM energy spectrometer prototype Bino Maiheu University College London on behalf of T-474 Vancouver Linear Collider.
May 31, 2005Mike Hildreth – ATF 2005 Energy Spectrometry and ATF Components of the nano-BPM Test Program and Plans for Future Tests Mike Hildreth University.
1 SLAC EPAC Meeting, Jan M. Woods, SLAC SLAC EPAC Meeting January 24, 2006 CCLRCLLNLQMULU.
G.R.White: F.O.N. T. From Ground Motion studies by A.Seryi et al. (SLAC) ‘Fast’ motion (> few Hz) dominated by cultural noise Concern for structures.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
1 June 7, 2006M. Woods, SLAC Collimator design, wakefields (T-480) BPM energy spectrometer.
1 SLAC ILC R&D Meeting, 16-Apr-2007 M. Woods, SLAC BPM energy spectrometer (T-474/491) Synch.
Beam induced EMI and detector electronics Nick Sinev, University of Oregon Gary Bower, SLAC Yasuhiro Sugimoto, KEK.
Fast Beam Collision Feedbacks for luminosity optimisation at next-generation lepton colliders Philip Burrows John Adams Institute Oxford University.
LCABD WP 4.2 – Spectrometer and BPM Studies
Design and testing of the Beam Delivery System collimators for the International Linear Collider J. L. Fernandez-Hernando STFC/ASTeC Daresbury Lab.
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
IP Beam Instrumentation R&D and Testbeams for the ILC
ILC EMI and bunch length measurements
Testbeam plans for LEP instrumentation
Beam-induced EMI and detector electronics
ATF nanoBPM system - nanoGrid ATF2 Movers TTF HOM – dipole / monopole
Beam Optics Set-Up at SLAC End Station A
Junji Urakawa (KEK) for ATF International Collaboration
Status Report on E-166 Undulator-Based Production of Polarized Positrons K.T. McDonald Princeton University EPAC Meeting SLAC, November 15, 2003.
Electron Source Configuration
Beam RF Effects Update Mike Woods, SLAC
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
ILC Beam Tests in End Station A
Linac Diagnostics Commissioning Experience
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Presentation transcript:

1 July 19, 2006M. Woods, SLAC (S. Boogert, RHUL) Collimator design, wakefields (T-480) BPM energy spectrometer (T-474) Synch Stripe energy spectrometer (T-475) Linac BPM prototypes IP BPMs/kickers—background studies EMI (electro-magnetic interference) Bunch length diagnostics (…, T-487) ESA testbeam program overview Vancouver LC workshop, 20th July, 2006 S. Boogert (RHUL) on behalf of M. Woods (SLAC) and ESA experiments

2 July 19, 2006M. Woods, SLAC (S. Boogert, RHUL) Beam Parameters at SLAC ESA and ILC ParameterSLAC ESAILC-500 Repetition Rate 10 Hz5 Hz Energy 28.5 GeV250 GeV Bunch Charge 2.0 x Bunch Length 300  m Energy Spread 0.2%0.1% Bunches per train 1 (2*)2820 Microbunch spacing - (20-400ns*)337 ns *possible, using undamped beam

3 July 19, 2006M. Woods, SLAC (S. Boogert, RHUL) ESA Equipment Layout 18 feet 4 rf BPMs for incoming trajectory 1 st Ceramic gap w/ 4 diodes (16GHz, 23GHz, 100GHz), 2 EMI antennas Wakefield boxWire Scannersrf BPMs blue=April ’06 green=July 06 red=FY07 Upstream Dipoles + Wiggler + T-487 for longitudinal bunch profile (location tbd) using pyroelectric detectors for Smith-Purcell radiation FONT-ESA Ceramic gap BLMs + ceramic gap (downstream of 3BPM11, not shown) for EMI studies

4 July 19, 2006M. Woods, SLAC (S. Boogert, RHUL) Funding from: i) SLAC ILC group, ii) UK, iii) DOE LCRD, iv) SLAC LCLS (for some of bunch length measurements) 4 test beam experiments have been approved: T-474, T-475, T-480, T Running schedule: i.January 5-9 commissioning run ii.April 24 – May 8, Run 1 iii.July 7-19, Run 2 T-474, T-475 T-480, EMI and Bunch Length measurements in Run 1 and Run2 FONT-ESA (IP BPM background studies) in July Plan for two 2-week runs in each of FY07 and FY08 ILC Beam Tests in End Station A

5 July 19, 2006M. Woods, SLAC (S. Boogert, RHUL) ILC-ESA Beam Tests Run 1: April 24 – May 8, 2006 ~40 participants from 15 institutions in the UK, U.S., Germany and Japan: Birmingham, Cambridge, Daresbury, DESY, Fermilab, KEK, Lancaster, LLNL, Notre Dame, Oxford, Royal Holloway, SLAC, UC Berkeley, UC London, U. of Oregon 1.Energy spectrometer prototypes T-474 BPM spectrometer: M. Hildreth (Notre Dame), S. Boogert (Royal Holloway and KEK) are co-PIs T-475 Synch Stripe spect.: Eric Torrence (U. Oregon) is PI 2. Collimator wakefield studies T-480: S. Molloy (SLAC), N. Watson (Birmingham U.) co-PIs 3. Linac BPM prototype BPM triplet – C. Adolphsen, G. Bowden, Z. Li 4. Bunch Length diagnostics for ESA and LCLS S. Walston (LLNL) and J. Frisch, D. McCormick, M. Ross (SLAC) 5. EMI Studies G. Bower (SLAC) + US-Japan collaboration with Y. Sugimoto (KEK) New hardware installed since January Commissioning Run was successfully commissioned: 1. 8 sets of collimators to test in collimator wakefield box (2 sets of 4) 2. 2 bpm triplets downstream of wakefield box + bpm processors 3. 2nd wire scanner downstream of wakefield box 4. 2nd 100-GHz diode bunch length detector 5. 2 EMI antennas (broadband up to 7GHz; use with 2.5GHz bandwidth scope)

6 July 19, 2006M. Woods, SLAC (S. Boogert, RHUL) A-Line Optics R 56  m T 566  2.74 m compression parameters P. Emma S (m, after last bend)  (m) Wakefield Box F. Jackson

7 July 19, 2006M. Woods, SLAC (S. Boogert, RHUL) Emittance measurements in Sector 28 and ESA LI28 wire scans give  x = (79 ± 1) mm-mrad  x = (10.8 ± 0.3) mm-mrad ESA quad scans give  x = (310 ± 20) mm-mrad  x = (13 ± 2) mm-mrad  vertical emittance in S28 varied from 5-30 mm-mrad, usually fixed by tuning Linac steering, ex. LI06 steering feedback setpoints

8 July 19, 2006M. Woods, SLAC (S. Boogert, RHUL) PIs: Steve Molloy (SLAC), Nigel Watson (U. of Birmingham) Collaborating Institutions: U. of Birmingham, CCLRC-ASTeC + engineering, CERN, DESY, Manchester U., Lancaster U., SLAC, TEMF TU Concept of Experiment Vertical mover BPM 2 doublets ~40m BPM Two triplets ~16m T-480: Collimator Wakefields Collimators remove beam halo, but excite wakefields. Goal is to determine optimal collimator material and geometry. These studies address achieving the ILC design luminosity.

9 July 19, 2006M. Woods, SLAC (S. Boogert, RHUL) 1500mm Concept of Experiment Vertical mover BPM 2 doublets ~40m BPM Two triplets ~16m T-480: Collimator Wakefields Vertical mover

10 July 19, 2006M. Woods, SLAC (S. Boogert, RHUL) Collimators to study resistive wakefield effects in CuCollimators to study 2-step tapers in Cu T-480: Collimator Wakefields 8 new collimators, fabricated in UK, were tested in Run 1

11 July 19, 2006M. Woods, SLAC (S. Boogert, RHUL) 1000mm OFE Cu, ½ gap 1.4mm Collimators for Wakefield Kick Measurements

12 July 19, 2006M. Woods, SLAC (S. Boogert, RHUL) First results on Collimator Wakefield Kicks (Run 1 Data) Online results during Run 1 Error bars will come down w/ offline analysis Have measurements on all 8 sets of collimators Took data with different bunch charge and bunch length settings Collimator Offset (mm) Kick Angle

13 July 19, 2006M. Woods, SLAC (S. Boogert, RHUL) “LEP-Type”: BPM-based, bend angle measurement w/  = 3.77 mrad “SLC-Type”: SR-stripe based, bend angle measurement p  “upstream”  “downstream” 2 Energy Spectrometers proposed for ILC

14 July 19, 2006M. Woods, SLAC (S. Boogert, RHUL) Upstream E-spectrometer chicane Energy collimation Energy spectrometer

15 July 19, 2006M. Woods, SLAC (S. Boogert, RHUL)  rad bend angle (LEP-II was 3.8mrad) 5mm dispersion at mid-chicane (100ppm : 500nm!) reverse polarity for calibration ~55 meters z-space required Upstream Energy Spectrometer Chicane 50  m

16 July 19, 2006M. Woods, SLAC (S. Boogert, RHUL) 20mrad IR downstream diagnostics layout K.Moffeit, Y.Nosochkov, et al ILC Extraction Line Diagnostics for 20mrad IR

17 July 19, 2006M. Woods, SLAC (S. Boogert, RHUL) T-474, T-475: Energy Spectrometers Precision energy measurements, parts per million, needed for Higgs boson and top quark mass msmts BPM (T-474) & synch. stripe (T-475) spectrometers will be evaluated in a common 4-magnet chicane. These studies address achieving the ILC precise energy measurement goals: resolution, stability & systematics For BPM spectrometer,  E/E=100ppm →  x= 500nm, at BPMs 3-4 (same as for ILC design)  study calibration procedure, which includes reversing the chicane polarity,  study sensitivity to: beam trajectory, beam tilt, bunch length, beam shape, …

18 July 19, 2006M. Woods, SLAC (S. Boogert, RHUL) T-474 and T-475 T-474 BPM Energy Spectrometer: PIs: Mike Hildreth (U. of Notre Dame) & Stewart Boogert (RHUL) Collaborating Institutions: U. of Cambridge, DESY, Dubna, Royal Holloway, SLAC, UC Berkeley, UC London, U. of Notre Dame See Talk of B. Maiheu T-475 Synchrotron Stripe Energy Spectrometer: PI: Eric Torrence (U. of Oregon) Collaborating Institutions: SLAC, U. of Oregon Prototype quartz fiber detector: micron fibers micron fibers w/ multi-anode PMT readout See Talk of E. Torrence

19 July 19, 2006M. Woods, SLAC (S. Boogert, RHUL) Beam RF effects at Colliders SLC Problem with EMI for SLD’s VXD3 Vertex Detector Loss of lock between front end boards and DAQ boards Solved with 10  sec blanking around beamtime – front end boards ignore commands during this period PEP-II Heating of beamline components near IR due to High-order Modes (HOMs) S. Ecklund et al., High Order Mode Heating Observations in the PEP-II IR, SLAC-PUB-9372 (2002). A. Novokhatski and S. Weathersby, RF Modes in the PEP-II Shielded Vertex Bellows, SLAC-PUB-9952 (2003). Heating of button BPMs, sensitive to 7GHz HOM, causes BPMs to fall out HERA Beampipe heating and beam-gas backgrounds HOM-heating related to short positron bunch length Electro-Magnetic Interference (EMI) and Beam RF Effects Effects of Beamsstrahlung Pair Backgrounds and EMI for IP Feedback BPMs

20 July 19, 2006M. Woods, SLAC (S. Boogert, RHUL) Beam RF effects at ILC IR? SLCPEP-II e + ILC Electrons/Bunch, Q4.0 x x x Bunch Length,  Z 1 mm12 mm0.3 mm Bunch Spacing8 ms4.2 ns337 ns Average Current7 nA1.7 A 50  A (Q/  Z ) 2 relative PEP-II experience HOM heating scales as (Q/  Z ) 2 - same scaling for EMI affecting detector electronics? - does scaling extend to mm and sub-mm bunch lengths? - need a cavity of suitable dimensions to excite IR geometry (aperture transitions, BPMs) has similar complexity as for ILC VXD and other readout systems ok for EMI in signal processing ILC Considerations HOM heating ok because of small average beam current EMI affecting Signal Processing and DAQ? Impact on Detector Design and Signal Processing Architecture?

21 July 19, 2006M. Woods, SLAC (S. Boogert, RHUL) EMI Studies in ESA US-Japan funds; Y. Sugimoto (KEK), G. Bower (SLAC), N. Sinev (U. of Oregon) Characterize EMI along ESA beamline using antennas & fast 2.5GHz scope Measured dependence of EMI antenna signals on bunch charge, bunch length  Linear dependence on bunch charge  No dependence on bunch length (only see dependence for 100GHz detectors) Will test failure mode observed with SLD’s vertex detector in July run 7.5GHz antenna near ceramic gap Also, WR10 and WR90 waveguides to Diode Detectors EMI Antenna Signal on 1.5GHz Bandwidth Scope (w/ ~x10 signal attenuation due to RG58 cable extension in Counting House on 3/8” heliax cable from ESA to ChA) See Talk of N. Sinev

22 July 19, 2006M. Woods, SLAC (S. Boogert, RHUL) 100GHz Diode, WR10 waveguide and horn Bunch length detectors at ceramic gap too much signal on 100GHz diodes necessitated removing horn and backing waveguide ~4” away from ceramic gap WR90 waveguide also against ceramic gap; 30-meter length of this to 2 diode detectors in ChA WR10 and WR90 waveguides at ceramic gap WR90 waveguide to 16GHz and 23GHz diodes in Counting House Radiated Power Spectrum for  z =500um, 1/e decrease is at f=100GHz

23 July 19, 2006M. Woods, SLAC (S. Boogert, RHUL) IR Mockup in ESA for FONT IP BPM studies PI: Phil Burrows, U. of Oxford Collaboration: U. of Oxford, Daresbury Lab, SLAC ILC flux densities in 3 schemes x ESA flux densities Energy Densities at Low Z Absorber Profile Monitor for “spray flux on BPM module” commission IP BPM with primary beam simulate ILC pairs hitting components in forward region of ILC Detector near IP bpms, exceeding maximum ILC energy density of 1000 GeV/mm 2 by up to factor 100 can vary ESA beam energies from GeV can use primary beam or secondary beam from Be target in Linac See Talk of P. Burrows

24 July 19, 2006M. Woods, SLAC (S. Boogert, RHUL) Summary  strong collaborations for important ILC beam tests, addressing ILC luminosity and ILC precision  energy spectrometer R&D and beam tests are necessary to test capability for 100ppm accuracy; significant impact on machine design; new BPMs being designed and built in the UK  4 test beam experiments have been approved; additional ones in preparation or under study  Successful 5-day commissioning run in January 2006, 2-week Run 1 in April/May and Run 2 in July  Plans to continue into FY07 andFY08, parasitic with PEP-II operation. Studying possibilities to continue into LCLS era.