©2011 AAI Corporation Overview of AAI Supplier First Article Inspection (FAI) expectations See your Supplier Quality Engineer with questions.

Slides:



Advertisements
Similar presentations
AS9102 First Article Inspection Report
Advertisements

3 Title Blocks and Part Lists Permission granted to reproduce for educational use only. Describe drawing sheet sizes and formats Identify marginal information.
Vendor Analysis. 2 of : Vendor Analysis / DA0199-w1 Last updated: Vendor Analysis Information in Inventory Control Introducing numerous modifications.
Copy Exact Training For SMC Suppliers
Global Supplier Quality Manual PPAP Requirements
PPAP Requirements Training
Premier Supplier of Energetic Mission Critical Solutions FORM 2716-A 01/12 Supplier PO Review Training.
First Article Inspection Report
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
QLF Contract Quality Clauses Working Group QUALITY LEADERSHIP FORUM CONTRACT QUALITY CLAUSES WORKING GROUP Ken Crane MSFC September 24, 2002.
Week 6 - Lecture Product Documentation
First Article Inspection 9102 Carl ZimmermanSept,2013.
First Article Inspection
Implant Purchase Management
Instructions for Completing the S upplier V erification of P urchased P roduct Package.
UNCLASSIFIED User Guide Applicant. UNCLASSIFIED Table of Contents What is the SAFETY Act? Applicant Guide Help Desk.
By: Carol Martineau, Acting Assistant Manager, Aircraft Maintenance Division, AFS-301 Date: June 7, 2015 Federal Aviation Administration ASA Conference.
By: Farzad Dadgari Soil and Environmental Specialist SWHISA.
Applied Materials Confidential Authorized Labels for Information: Applied Materials Confidential. Applied Materials Confidential Restricted/Modifier Applied.
Detail and Assembly Drawing
Engineering Graphics V
Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Supplier Process Control.
1 International Aerospace Standard for for First Article Inspection(FAI) First Article Inspection(FAI) Dick Pocock VP, Quality Assurance Honeywell Engines.
Instructions for Completing the P rint A ttribute R esults Form Last revised 3 January 2005.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
High Schools United with NASA to Create Hardware (HUNCH)
06/27/100 Internationally Harmonized Aerospace Standards for First Article Inspection AS9102, EN 9102, SJAC 9102 Philippe Removille SNECMA Moteurs 5.
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
1 Internationally Harmonized Aerospace Standards for First Article Inspection AS9102, EN 9102, SJAC 9102 AS9102, EN 9102, SJAC 9102 Dick Pocock VP, Quality.
06/27/100 Internationally Harmonized Aerospace Standards for First Article Inspection AS9102, EN 9102, SJAC 9102 Chetan Date, Ph.D., P.E. Director of Design.
Proprietary + Confidential1 Tech Review Guideline Please arrive at your Tech Review ready to present and discuss all of the following information. The.
Supplier Quality Improvement
A JSJ Business APQP/PSO. A JSJ Business Purpose: To understand key concepts of the GHSP APQP and PSO process by reviewing the.
How the NCSX Project Does Business
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
Computer Aided Draughting (CAD) for Engineers SQA Unit No. F5H4 11.
Assist and Specialized Tool Ergonomics Worksheet Training & Instructions.
First Article Inspection Reports (FAIRs) Instructions for Suppliers
Supplier Corrective Action Request (SCAR) Supplier Training
MRB file  MRB delivery, assemblies  MRB Index  MRB compilation  Bookmarking  Bookmark adding (series)  MRB checklist.
SQA01 Supplier Guidance Material: Certificate of Conformance Requirements GKN Aerospace Services – CowesDate:13/5/16.
External Provider Control
ERP/QMS by PMI Aerospace ERP/QMS by PMI Aerospace
DSQR Training Reliance System
First Article Inspection Reports (FAIRs) Instructions for Suppliers
CDM DMSS Desktop Instruction Re-Order supplier Pick List
SQA01 Supplier Guidance Material: Certificate of Conformance Requirements GKN Aerospace Services – Cowes Date: 13/5/16.
<NPI/Engineering Change/Phase Out>
Materials Engineering Product Data Management (ePDM)
First Article Inspection
DSQR Training Supplier Quality Manual
Appearance Approval Report (AAR)
Quality Improvement Plan (QIP) Training Session
First Article Inspection Report (FAIR) Training
First Article Inspection (Per AS9102)
Statistical Product Acceptance
CDRL E003 CFAT REPORT TEMPLATE
First Article Inspection Reports (FAIRs) Instructions for Suppliers
HEATING, COOLING & WATER HEATING PRODUCTS
Detail Drawings and Assembly Drawings
SQA01 Guidance Material: FAI Review
KAMAN AEROSPACE GROUP L. Chodasiewicz - Supplier Quality Assurance.
SQA01 Supplier Guidance Material: Permission to Ship Forms
First Article Inspection
SENSE Completion Process
Guide for successful completion of First Article Inspection Reports
Guide for successful completion of First Article Inspection Reports
Working Drawings Legal Documents that Provide All the Visual, Numerical and Textural Information Required to Manufacture a Component, Mechanism or Structure.
First Article Inspection (Per AS9102)
Assembly drawings Flóra Hajdu B406
Presentation transcript:

©2011 AAI Corporation Overview of AAI Supplier First Article Inspection (FAI) expectations See your Supplier Quality Engineer with questions

2 ©2011 AAI Corporation AS9102A is available through SAE International – International Aerospace Quality Group (IAQG) FAQs – Forms are available through Americas Aerospace Quality Group (AAQG) – –Additionally on the same page is Rolls-Royce training AS9102 – Aerospace First Article Inspection Requirement AS9102 Guidelines are available

3 ©2011 AAI Corporation Ensure the product being delivered meets Drawing requirements. –Including any material and test specifications identified. Provide expectations to allow proactive practices to support effective generation of a complete FAI including... –Submitting sub-tier FAI requirements to sub-tier suppliers. Supplier can then receive FAI documentation from sub-tier upon sub-item receipt. –Ensuring supplier drawings and specifications support an FAI. Purpose Do what you say and say what you do...

4 ©2011 AAI Corporation The item that is the subject of the FAI report shall be selected from the first production lot All related process and test documentation shall be under revision control in your document control system A detailed bill of material (BOM) should be included Include all AAI drawing requirements in FAI Ensure the current revision AAI drawing is being used AAI prefers to receive the report in electronic format. –If proprietary concerns are applicable, discuss with your Supplier Quality Engineer AAI Expectations Identify FAI requirements in your PO negotiations

5 ©2011 AAI Corporation AAI Form Expectations Sub-assemblies are to be listed on Form 1 section 15 –complete separate FAI reports & attach to top assembly report Identify COTS (Commercial Off-The-Shelf) parts on the BOM –COTS parts only need to be recorded on Form 3 if a BOM is not provided. Modified COTS parts are non-COTS parts –Non-COTS parts must be listed on Form 3 or made part of the sub-assembly list of Form 1 section 15 and provide details of the modification in the report. List the ATP document number and revision on Form 2 section 11 and included in report. –Also list any special processes and the associated industry specifications on Form 2

6 ©2011 AAI Corporation AAI Form Expectations (continued) Include tolerance information in Form 3, column 8 and record actual dimension in column 9. –Do not use “Pass” or “Complies” for dimensional data. –No need to include reference dimensions on form 3

7 ©2011 AAI Corporation Form 1 Example PO 002 / Parts List A

8 ©2011 AAI Corporation Form 2 Example

9 ©2011 AAI Corporation Form 3 Example

10 ©2011 AAI Corporation Included Sections and pages Bubbled Drawing BOM

11 ©2011 AAI Corporation Included Sections and pages (cont) Certificates of Conformance (CoC) to required specifications Material Certificates to required specifications

12 ©2011 AAI Corporation COTS reference COTS PO and Identification it meets specification

13 ©2011 AAI Corporation Details by AS-9102 Field Form #/ Field # (e.g., 2/1 = form 2 / field 1) 1/1: part # from PO 1/2: part name from PO (abbreviated name) 1/3: S/N of FAI part (N/A if not applicable) 1/4: Supplier generated number (consider lower level FAIs) 1/5: from AAI PO (may include Parts List Rev) 1/6: AAI drawing number 1/7: AAI drawing revision 1/8: Identify if applicable (else N/A) 1/9: Supplier Work Instruction # (or “build to print”)

14 ©2011 AAI Corporation Details by AS-9102 Field (cont) 1/10: Complete name 1/11: Cage code number (else AAI Supplier number) 1/12: AAI PO # to Supplier 1/13: Detail if “flat BOM”/ Assembly if “top level” 1/14: Partial = Delta FAI (due to changes) Area with out field number: if initial FAI state: “initial FAI” 1/15-18: Top Level assemblies of BOM –Supplier lower level FAIs or sub-tier FAIs required for assemblies. 1/21-22: Strongly suggested!

15 ©2011 AAI Corporation Details by AS-9102 Field (cont) 2/1: part # from PO 2/2: part name from PO (abbreviated name) 2/3: S/N of FAI part (N/A if not applicable) 2/4: Supplier generated number (consider lower level FAIs) 2/5: May include find # from BOM or AAI Parts list, or Bubbled drawing #, or WI section (each should be cross-referenced) 2/6-7: Identified on drawing or WI. Example: Spec = IPC-610, Code = Class 3 Remaining fields self explained in AS-9102

16 ©2011 AAI Corporation Details by AS-9102 Field (cont) 3/1: part # from PO 3/2: part name from PO (abbreviated name) 3/3: S/N of FAI part (N/A if not applicable) 3/4: Supplier generated number (consider lower level FAIs) 3/5: May include Bubbled drawing #, or WI section (Notes must be included in “bubbles”) –Drawings with specifications must use section #’s 3/8: Must include tolerances (if applicable) –Reference dimensions not needed. 3/9: For non-specification oriented visual acceptance mark “visual”.

17 ©2011 AAI Corporation Details by AS-9102 Field (cont) 3/10: Record special tool ID #. –Desirable: Calibration asset # and due date Remaining fields self explained in AS-9102 Contact your AAI Supplier Quality Engineer with questions or concerns related to these directions.