Salton Sea Species Conservation Habitat Workshop June 10, 2010.

Slides:



Advertisements
Similar presentations
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Advertisements

Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
Meadowbank Gold Project Cumberland Resources Ltd. Nunavut Impact Review Board Public Hearing Chesterfield Inlet, Nunavut March 30, 2006.
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
Bill Orme, Senior Environmental Scientist, State Water Board Liz Haven, Asst. Deputy Director, Surface Water Regulatory Branch, State Water Board Dyan.
GIBSON ISLAND WATER SYSTEM CAPITAL IMPROVEMENT PROJECT Public Information Meeting June 5, 2012.
Solar Evaporation Ponds at the Salton Sea for Salinity Control
Salton Sea Species Conservation Habitat Stakeholders Meeting April 12, 2011.
Statewide Resource and Species Plans Guide for Restoring, Protecting, and Enhancing Wetlands, Prairies, Forests, and Game, Fish, and Wildlife Habitat -
Water Sustainability Seminar Series Academy Village April 16, 2014 Part 2 – Meeting Challenges.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Module 3 Counterpart Regulations Standards of Review for Determining Project Effects.
Grand Calumet River/Indiana Harbor Canal Feasibility Study
Q AVG US Army Corps of Engineers BUILDING STRONG ® Q AVG US Army Corps of Engineers BUILDING STRONG ® USACE Regional Sediment Management Program Linda.
JOINT VENTURES Celebrating 25 Years of Bird Conservation.
Notice: The views expressed here are those of the individual authors and may not necessarily reflect the views and policies of the United States Environmental.
Range Practices 1 Objectives and Range Practices under FRPA & Objectives & Objectives The Focus is on Results.
West Virginia University Natural Stream Restoration Program An Interdisciplinary Program Focusing on Research, Education, and Professional Services in.
Integrated Natural Resources Management Plan Development on Navy Installations in Southern California Coralie Cobb Natural Resources Specialist Southwest.
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
California Natural Resources Agency U.S. Army Corps of Engineers.
Ballona Wetlands Restoration Sean Bergquist - Restoration Program Manager photo provided courtesy Jonathan Coffin.
Climate Change: SEAFWA Thoughts? Ken Haddad, Executive Director Florida Fish and Wildlife Conservation Commission September 2007.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
Integrated Ecosystem Restoration and Hurricane Protection: Louisiana’s Comprehensive Master Plan for a Sustainable Coast.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
CLIMATE CHANGE AT THE DEPARTMENT OF WATER RESOURCES Climate Change Adaptation Across the Landscape Michelle Selmon Regional Climate Change Specialist June.
1 South San Francisco Bay Salt Ponds Long-Term Restoration Planning.
Science Foundation for Planning and Implementation: Increasing Efficiency, Effectiveness, & Accountability Barry Wilson Gulf Coast Joint Venture Joint.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
Bio-remediation for Selenium Making it Work for Agriculture.
Marin Coastal Watersheds Permit Coordination Program Marin Resource Conservation District U.S.D.A. Natural Resources Conservation Service Sustainable Conservation.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
Western Lake Erie Basin Partnership Presented by: Name, Title Your Organization DATE YOU PRESENTED The Meeting you presented at.
PROSPECT ISLAND RESTORATION& THE FISH RESTORATION THE FISH RESTORATION PROGRAM AGREEMENT Dan Riordan Department of Water Resources.
Fish and Wildlife : Regulatory Framework and Challenges Cherise M. Oram STOEL RIVES LLP Hydrovision 2008 Ocean/Tidal/Stream Power Track 7D “Environmental.
- Aquatics - Presented by: Rick Pattenden Mainstream Aquatics Ltd.
PRESENTATION & DISCUSSION Dave Bergen Southold Town Trustee July 18, 2015.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Stakeholders Meeting November 15,  Review the development and identification of State’s preferred alternative  Provide updates on SCH Project.
U.S. Army Corps of Engineers Inter-Agency Coordination BLM PILOT VERNAL & GLENWOOD SPRINGS U.S. Army Corps of Engineers & U.S. Bureau of Land.
1 Preserving Swainson’s Hawk Habitat LAFCO October 5, 2005.
Salton Sea Species Conservation Habitat Scoping Meetings July 7 and 8, 2010.
Flathead River to Lake Initiative Conservation and restoration through a diverse collaborative effort Part I – How it began Part II – Conservation Successes.
PIANC USA and ASCE-COPRI DREDGING 2012
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
Margaret Byrne, U.S. Fish and Wildlife Service
1 September 13, 2007 North-of-the-Delta Offstream Storage ACWA Regions 9 and 10 Carlsbad Water Summit North-of-the-Delta Offstream Storage ACWA Regions.
South Bay Salt Pond Restoration-- Challenges to Ecological Restoration.
Kettle River Watershed Management Plan Stakeholder Advisory Group Meeting #3 – July 19, 2012.
Salton Sea Species Conservation Habitat Stakeholders Meeting June 10, 2010.
BAY DELTA CONSERVATION PLAN SEPTEMBER SUISUN BAY SACRAMENTO STOCKTON STATE & FEDERAL PUMPING PLANTS Getting Oriented – The Delta.
MRERP Missouri River Ecosystem Restoration Plan and Environmental Impact Statement One River ▪ One Vision A Component of the Missouri River Recovery Program.
Engineering Perspectives – Towards Structural Change Jackie Kepke, P.E. Workshop on Climate, Society, and Technology June 7, 2011.
TRAP 5 th interregional meeting & Site Visits Limerick & Lough Derg, Ireland 9 th October 2013 CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
Investing in Ocean Health Presentation to Ocean Protection Council (February 2016) Sara Aminzadeh, Executive Director, California Coastkeeper Alliance.
Climate Change Threat Sea-Level Rise 1. Potential Impacts from Sea-Level Rise How might our community be impacted by sea-level rise? 2.
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Information Presentation to YBFEPT July.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Russian River Estuary Management.
Back River Mine Project Presentation to the Nunavut Impact Review Board Final Hearing Cambridge Bay, NU April 25-30,
Chesapeake Bay Program
Proposed Plan for No Further Action
View display boards and speak one-on-one with staff
VP1 W Largest vernal pools are visible from this historic 1938 aerial (pre-oil operation)
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
Importance of Flood-irrigation to Continental Bird Populations
Presentation transcript:

Salton Sea Species Conservation Habitat Workshop June 10, 2010

2 Provide Stakeholders the opportunity to guide the direction of the SCH Project Meeting Purpose

3 Agenda Introductions Goals and objectives Critical screening criteria Construction challenges

4 Introduction of Presentation Team Rick Davis – Davis Group Arturo Delgado – California Department of Fish and Game Ramona Swenson – ENTRIX, Inc. Rob Thomson – ENTRIX, Inc. Vince Thompson – Ducks Unlimited

Species Conservation Habitat Project Goals and Objectives

6 Need for SCH Project Declining surface water elevation will lead to loss of Salton Sea habitat Increasing salinity will lead to fishery collapse Fishery collapse will result in loss of forage base for fish-eating birds

7 SCH Project Purpose SCH will provide conservation measures while the Legislature determines long-term action Provides replacement for some near-term habitat losses as sea levels decline Target: piscivorous bird species present in 2010 and dependent on the Sea for: Foraging – fishery resources Essential habitat components – foraging, nesting, roosting, loafing Viability of a significant portion of their population

8 Goals and Objectives Goal 1: Develop a range of aquatic habitats that will support fish and wildlife species dependent on the Salton Sea Objectives Provide adequate foraging habitat for piscivorous (fish- eating) bird species Develop habitats required to support piscivorous bird species Support a sustainable, productive aquatic community Provide suitable water quality for fish Minimize adverse effects to desert pupfish Minimize risk of selenium Minimize risk of disease/toxicity impacts

9 Goals and Objectives Goal 2: Develop and refine information needed to successfully manage the SCH Project through an adaptive management process Objectives Identify uncertainties in achieving the objectives Design science-based means to test alternatives and reduce uncertainty Develop and implement a monitoring plan Develop a decision-making framework Provide proof-of-concept for future restoration efforts

10 Questions and Feedback Goal 1: Develop a range of aquatic habitats that will support fish and wildlife species dependent on the Salton Sea Goal 2: Develop and refine information needed to successfully manage the SCH Project through an adaptive management process Do you agree with these goals and objectives? Are we missing any others?

Species Conservation Habitat Project Critical Screening Criteria

12 Screening Criteria Two types of screening criteria Exclusionary criteria Factors essential to the successful completion of the SCH Project Evaluative criteria Factors considered in comparing Project components and alternatives Not necessarily cause for elimination Construction and operational costs Environmental considerations Other

13 Critical Screening Criteria Exclusionary criteria used to begin refining the range of potential sites Exclusionary criteria are Adequate water supply (quantity, quality, and seasonal availability) Available water rights Available land Three general locations being considered

14 Three Generalized Alternative Locations

15 Available Land – Whitewater River

16 Available Land – New River

17 Available Land – Alamo River

18 Questions and Feedback Are these the right criteria? Are there others we should consider?

Species Conservation Habitat Project Construction Challenges

20 Construction of SCH Ponds Construction may occur in areas between -228 and -234 msl Exposed playa with high groundwater Shallow flooded areas Water a few feet deep

21 Potential Site Conditions Examples of conditions that may be encountered during berm construction Exposed moist but relatively firm soils Shallow flooded relatively firm soils Shallow flooded soft mucky soils Water a few feet deep with soft or firm soils Examples of water control structure installation Localized dewatering Structure support in soft soils

22 Receding Sea Water Surface

23 Example – Moist, relatively firm soils Equipment Low ground pressure tractors with carry-all scrapers Method Excavate, haul and place with the same piece of equipment Haul distance Short to Medium Relative cost Low Building Berms on Exposed Playa

24 Low Ground Pressure Tractors

25 Example – Shallow water, relatively firm soils Equipment Excavators, low ground pressure dump trucks, bulldozers Method Excavate and load, haul with dump trucks, spread with dozers Haul distance Short to long Relative Cost High Building Berms in Shallow Water

26 Excavator, Load, and Haul

27 Dump and Spread

28 Building Berms in Shallow Water Example –Shallow water, soft mucky soils Equipment Amphibious excavators Method Excavate and drop Haul distance Adjacent Relative Cost High

29 Amphibious Excavators

30 Building Berms in Deeper Water Example – 2 feet of water, soft or firm soils Equipment Derrick barge with clamshell bucket Method Excavate and drop Haul distance Adjacent Relative Cost Medium

31 Derrick Barge Clamshell Bucket

32 Layer Height Depends on Strength

33 Hydraulic Dredge

34 Site Dewatering

35 Water Control Structure

36 Structure Site Dewatering

37 Structure Support in Soft Soils

38 Functional Wetland Management

39 Next Step – Design Considerations Preliminary Geotechnical Investigation Sample and test soils at potential project sites Previous investigations have not sampled locations around the river deltas Assess construction feasibility at potential sites Preliminary Berm Stabilization Alternatives Examples of design solutions to be considered Source of embankment material Dewatering Base stabilization with geogrids Berm stabilization with geotubes

40 Questions and Feedback Are there other issues we should address?

41 Contact Information DFG Contact: Kim Nicol, Environmental Program Manager California Department of Fish and Game Country Club Drive, Suite 109 Bermuda Dunes, CA (760) USACE Contact: Lanika Cervantes, Project Manager San Diego Section, Regulatory Division U.S. Army Corps of Engineers - Los Angeles District 6010 Hidden Valley Road, Suite 105 Carlsbad, CA (760)

42 SCH Project Website

43 USGS Ponds

44 USGS Pond Construction