Feed-in tariffs and south-south policy/technology transfer: The evolution and implementation of Very Small Power Producer (VSPP/SPP) Regulations in Thailand.

Slides:



Advertisements
Similar presentations
topics Burmese energy sector (compiled by MEE NET)
Advertisements

Citizen’s meeting on Power Sector Reform Chris Greacen November 25, 2007 Bangkok, Thailand Solar, wind, hydro, CHP in Thailand: technology, cost, potential,
Cambodia’s Profile in Power Sector The First Mekong Energy and Ecology Training May 11-30, 2009, Thailand TONN KUNTHEL, BY HOUR & PHALLUY.
Renewable Energy in Islamic Republic Of Iran
1 Power Sector in Tanzania Recent Developments, Current Crisis, Issues, Challenges and Solutions.
RENEWABLE ENERGY FEED – IN TARIFF REGULATORY GUIDELINES Waste-to-Energy Seminar 17 July 2009 Cape Town By Bianka Belinska.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Cambodian Energy Sector Development Ministry of Industry, Mines and Energy Vietnam, Ho Chi Minh, 11 November, 2011 Greater Mekong Subregion Fifth Meeting.
Chris Greacen Li Garden Hotel, Hat Yai, Thailand 20 Nov, 2005 Solar, wind and micro-hydropower: options, costs, resource assessment Palang Thai.
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
… Towards a Light Handed Regulatory System for Promoting Grid and Off Grid Small Power Producers (SPP): An Update on the Tanzania SPP program AFTEG and.
Practical Policies for Decentralized Electricity Generation Chris Greacen Palang Thai MEE-Net Workshop 18 January 2012 Bangkok.
Alternative Energy Development Plan (2008 – 2022), Medium - and Long – term Investment Plan and the Role of the Private Sector Mr. Rangsan Sarochawikasit.
China’s Sustainable Energy Policy
You currently have no control over ever rising electricity prices Electricity costs have doubled over the last 10 years* What will your electricity bill.
Clean, Affordable Decentralized Energy Options -- Burma Chris Greacen Palang Thai MEE-Net Seminar on Energy in Burma 24 Jan 2011 Chiang Mai.
Empowering Rural Electrification in Myanmar: Opportunities and Policies Tungapuri Hotel Nay Pyi Daw, Myanmar Dr. Chris Greacen March 9, 2013.
Solar Energy in Gujarat Some Aspects of Regulatory Decision-making Dr. P. K Mishra Chairman Gujarat Electricity Regulatory Commission Forum on Clean Energy,
Thailand, May 2009 Mekong Energy and Ecology Network The First Mekong Energy and Ecology Training.
Thailand situation analysis and initial idea for case study Chris Greacen Sopitsuda Tongsopit Chuenchom Greacen Palang Thai.
1 Guidelines for Developers of Small Power Projects (SPP) in Tanzania Main features of a draft for discussion 25 Feb 2009 Chris Greacen
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
Chris Greacen Chiang Mai, Thailand 24 January 2013 Grid-connected renewable energy in Thailand under the VSPP and SPP programs MEENet workshop, session.
OPPORTUNITIES AND CHALLENGES OF POLICY AND REGULATORY REFORMS IN THE POWER SECTOR IN UGANDA (Cogeneration Development and the Private Forestry Sector Participation.
Energy Policy and Planning Office The Energy Conservation Promotion Fund for Developing RE Projects in Thailand Pinnara Premcharoen Policy and Plan Analyst.
Chris & Chom Greacen Oct 4, 2006 RAEL UC Berkeley Towards sustainable energy in Thailand Palang Thai Border Green Energy Team Public interest energy policy.
Electricity Generating Authority of Thailand (EGAT) 1 STRUCTURE, STATUS AND CROSS BORDER POWER INTERCONNECTION 0F THAILAND b y Mr. Prutichai Chonglertvanichkul.
Electricity in Thailand: current arrangements, impacts, alternatives 2 August, 2006 ERI Chris Greacen
PV Policy Group KOM Catania, 6-7 October About PV in Portugal Luís Silva Pedro Paes Hybrid PV-Wind power plant.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
1 Development of Renewable Energy Application in Vietnam Energy and Petroleum Department MINISTRY OF INDUSTRY.
ENERGY POLICY DEVELOPMENTS EE & RE OPPORTUNITIES U.S. Business Mission 2010 June 15 – 17, 2010 Chisinau, Republic of Moldova.
May 20, 2009 MeeNet, Thailand Micro-hydro, biomass, biogas: technology, cost, potential, applications Palang Thai.
Link on sitor/direction/en.
Renewable Energy Policies: China’s Scale-Up Story Dr. Xiaodong Wang Senior Energy Specialist EASIN, the World Bank SDN Week, Energy Day February 23, 2012.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Net Metering and Embedded Generation NB Climate Action Change Hub Advisory Committee Meeting – October 1, 2008 Saint John, NB Linda Berthelot.
RDL Utility Based Financial Incentives for Renewable Energy & Energy Efficiency in New Zealand EGNRET Workshop Honolulu, Hawaii, USA 30 March – 1 April,
Presentation on the Green Energy Act for South Simcoe Municipalities Susan Lloyd Swail M.E.S. Planning Candidate Intern at Nottawasaga Futures Green Economy.
Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai.
Privatization of profits, socialization of costs & risk: Privatization in Thailand’s Power Sector Chris Greacen Palang Thai July.
Power Sector Planning and Development: Lessons from Thailand’s and international experience Chuenchom Sangarasri Greacen 9 March 2013 WORKSHOP ON “ELECTRIC.
Grid-tied decentralized power generation: experience from Thailand and Tanzania Chris Greacen Palang Thai AEPF 9 17 October 2012 Vientienne, Lao.
Clean electricity options for a free Burma Chris Greacen Palang Thai Seminar on “Energy: Tragedy in Burma” 20 November 2007 Chulalongkorn University.
Thailand’s VSPP Program 15 March 2010 Energy Policy and Planning Office Presented to representatives from Tanzania.
Electricity in Thailand: current arrangements, impacts, alternatives 27 June, 2007 ERI Chom Greacen Chris Greacen
Evolution of Thailand’s Very Small Power Producer (VSPP) regulations Humboldt State University 11 September 2008 Chris Greacen Palang Thai.
GMS Power Grid Who gains, who loses? Chuenchom Sangarasri Greacen 17 July 2005 Piyawan Resort.
Selling renewable energy profitably to the grid: The evolution and results of Very Small Power Producer (VSPP) Regulations in Thailand and Tanzania Regional.
Thailand’s experiences in the power sector Chuenchom Sangarasri Greacen Chris Greacen, Ph.D. Palang Thai International Seminar on Dams and Sustainable.
28 August August Office of the National Economic and Social Development Board O F F I C E O F T H E P R I M E M I N.
Governance issues in the Thai Electricity Sector WRI/TEI Workshop on Electricity Governance in Asia Chuenchom & Chris Greacen Palang Thai:
Presentation to Select Committee on Economic Development
Renewable Energy for conviviality: some experiences from Thailand Chris Greacen Palang Thai Eco-Village Training 20 December 2007 Mu Ban Dek, Kanchanburi.
RENEWABLE ENERGY REGULATION IN KENYA KENYA-SPAIN MULTILATERAL PARTNERSHIP MEETING HELD AT CROWNE PLAZA Presented by Caroline Kimathi Asst Manager, Licensing.
Chris & Chom Greacen 16 April 2009 Towards clean, just and democratic energy development in Thailand and South-east Asia Palang Thai.
Chris Greacen Integrated Resource Planning for Myanmar’s Electricity Sector Naypyitaw, Myanmar 11 Feb 2015 Integrated Resource Planning (IRP) -- a tool.
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
The Energy Conservation Promotion Fund
Renewable energy potential in Thailand
Clean energy in Thailand: Potential, Planning and Policy
Renewable Energy In Egypt
Regional Energy Conference
City Council April 30, 2018 Item 13
Connecting small renewable energy generators to the grid in Thailand: case studies & technical requirements Renewable Energy Forum Thursday, 28 October.
Connecting pigfarm biogas to the grid in Thailand – VSPP regulations
Energy transition in Uruguay
Presentation transcript:

Feed-in tariffs and south-south policy/technology transfer: The evolution and implementation of Very Small Power Producer (VSPP/SPP) Regulations in Thailand and Tanzania Monterey Institute for International Studies Monterey, California, USA 8 May 2010 Chris Greacen

Palang Thai พลังไท Thailand NGO Objective: – To ensure that the transformations that occur in the region's energy sector: augment, rather than undermine, social and environmental justice and sustainability. Key approaches: – We teach hands-on energy technology – We draft / comment on policies – We work to empower citizens to look critically at government and industry projects and plans – We advocate structural reform พลัง (palang): n 1. Power. 2. Empowerment. ไท (thai): adj. 1. Independence. 2. Self-reliance

Can’t we hook it up and sell power back? Mae Kam Pong village microhydro

Meeting between National Energy Policy Offic (NEPO) and Mae Kam Pong villgers to discuss grid interconnection of their village micro-hydro

$

Technical regulations: Allowable voltage, frequency, THD variations Protective relays – 1-line diagrams for all cases: Induction Synchronous Inverters Single/multiple Connecting at different voltage levels (LV or MV) Communication channels Commercial regulations: Definitions of renewable energy, and efficient cogeneration Contract parties Cost allocation Principle of standardized tariff determination Invoicing and payment arrangements Arbitration $ + Standardized Power Purchase Agreement (PPA)

Import (3%)‏ EGAT (45%)‏ IPPs (42%)‏ Generation (% share)‏ Transmission Distribution EGAT (100%) PEA (66%)‏ MEA (32%)‏ Direct Customers (2%)‏ Users SPPs (10%)‏ Thailand’s Electricity Industry Structure

Import (3%)‏ EGAT (45%)‏ IPPs (42%)‏ Generation (% share)‏ Transmission Distribution EGAT (100%) PEA (66%)‏ MEA (32%)‏ Direct Customers (2%)‏ Users VSPPs (<1%)‏ SPPs (10%)‏ Thailand’s Electricity Industry Structure

Import (3%)‏ EGAT (45%)‏ IPPs (42%)‏ Generation (% share)‏ Transmission Distribution EGAT (100%) PEA (66%)‏ MEA (32%)‏ Direct Customers (2%)‏ Users VSPPs (<1%)‏ SPPs (10%)‏ Thailand’s Electricity Industry Structure Firm / non-firmPeak / off-peak

Evolution of Thai VSPP regulations 2002 – VSPP regulations drafted, approved by Cabinet – Up to 1 MW export, renewables only – Tariffs set at avoided cost (bulk supply tariff + FT)

Biogas from Pig Farms Reduces air and water pollution Produces fertilizer Produces electricity 8 x 70 kW generator Ratchaburi

Biogas from Pig Farms

40 kW Mae Kam Pong, Chiang Mai, Thailand Micro hydropower

Uses waste water from cassava to make methane Produces gas for all factory heat (30 MW thermal) + 3 MW of electricity 3 x 1 MW gas generators Korat Waste to Energy – biogas … an early Thai VSPP project

Evolution of Thai VSPP regulations 2002 – VSPP regulations drafted, approved by Cabinet – Up to 1 MW export, renewables only – Tariffs set at avoided cost (bulk supply tariff + FT) 2006 – Up to 10 MW export, renewables + cogeneration – Feed-in tariff “adder” – If > 1 MW then utility only pays for 98% of energy

Rice husk-fired power plant 9.8 MW Roi Et, Thailand

Bangkok Solar 1 MW PV Project size: 1 MW Uses self-manufactured a-Si

Evolution of Thai VSPP regulations 2002 – VSPP regulations drafted, approved by Cabinet – Up to 1 MW export, renewables only – Tariffs set at avoided cost (bulk supply tariff + FT) 2006 – Up to 10 MW export, renewables + cogeneration – Feed-in tariff “adder” – If > 1 MW then utility only pays for 98% of energy 2009 – Tariff adder increase, more for projects that offset diesel for English version of regulations, and model PPA

Thai VSPP feed-in tariffs Assumes exchange rate 1 Thai baht = U.S. dollars FuelAdderAdditional for diesel offsetting areas Additional for 3 southern provinces Years effective Biomass Capacity <= 1 MW $ $ Capacity > 1 MW $ $ Biogas <= 1 MW $ $ > 1 MW $ $ Waste (community waste, non-hazardous industrial and not organic matter) Fermentation $ $ Thermal process $ $ Wind <= 50 kW $ $ > 50 kW $ $ Micro-hydro 50 kW - <200 kW $ $ <50 kW $ $ Solar $ $ Tariff = adder(s) + bulk supply tariff + FT charge Biomass tariff = $ $ $0.027 = $0.085/kWh

call center การไฟฟ้าส่วนภูมิภาค การไฟฟ้าส่วนภูมิภาค PROVINCIAL ELECTRICITY AUTHORITY Generating Capacity supply to Grid from August 2009

VSPP project pipeline as recorded in EPPO data Application under consideration Permission received, awaiting PPA PPA signed Generating & selling electricity Leakage (Project abandoned)

Jun 2009 Thailand VSPP Status

Dec 2009 Thailand VSPP Status

Mar 2010 Thailand VSPP Status

Mar 2010 Thailand VSPP Status 811 MW online

Mar 2010 Thailand VSPP Status 811 MW online PPAs signed for additional 4159 MW

Import (3%)‏ EGAT (45%)‏ IPPs (42%)‏ Generation (% share of GWh)‏ Transmission Distribution EGAT (100%) PEA (66%)‏ MEA (32%)‏ Direct Customers (2%)‏ Users VSPPs (<1%)‏ SPPs (10%)‏ … but it’s still a tiny part of Thailand’s electrical energy

Evolution of Tanzania SPP regulations Approved by regulator August 2009 Up to 10 MW export, renewables & cogeneration SPP Tariffs at average of LRMC and SRMC – Grid-connected SPP tariff (2009): $0.066/kWh – In rural mini-grid areas offsetting diesel (2009): $0.26/kWh 5 PPAs signed by March for English versions of regulations, and model PPAs

Wealthy countries pay Feed-in tariff incremental costs?

GET FiT proposed mechanism

South-south policy/technology transfer: Technical Visit of the Delegation from the United Republic of Tanzania to Thailand regarding Thailand’s Very Small Power Producer (VSPP) program March 2010

call center การไฟฟ้าส่วนภูมิภาค การไฟฟ้าส่วนภูมิภาค PROVINCIAL ELECTRICITY AUTHORITY How we have done? Submitted Proposals Line connecting construction Meter installation Meter reading Billing Acceptance Letter PPA signedFirst synch.CODEvery 1 ft Meter reading license check All test PPA Check Document check Identify circuit connection System study All license check VSPP will get first settlement within 3 month after COD.

call center การไฟฟ้าส่วนภูมิภาค การไฟฟ้าส่วนภูมิภาค PROVINCIAL ELECTRICITY AUTHORITY Who have involved in PEA ? DG office Technical & System Analysis Document Coordinator Research Div. PQ test Relay Div. Switchgear & Relay test Meter Div. Meter installation System Operation Div. First synch. test System Operation Area Office 1-12 Identify circuit connection Control & Operation Communication Area Office 1-12 & Local Office Line connecting construction Meter reading Tariff Div. Billing Finance Dep. Settlement Legal Div. PPA check

Thailand VSPP Tanzania Vietnam? Philippines?

Winter … community built, community-owned, profitable VSPP micro-hydro in Thailand

Unlimited living?

Office of the National Economic and Social Development Board O F F I C E O F T H E P R I M E M I N I S T E R Low Quality Education Low Quality labour Insufficient in R&D Investment Slow Technology Development Low Quality for Raw-material, machinery and equipment (Low margin/return) Low Basic infrastructure and Logistic development Enabling factors: MACROECONOMIC MANAGEMENT No immunity/ High volatility Financial System Lack of Saving Lack of regulation on industrial product’s quality control Low Value Creation High Import Contents & Sheer size of export to GDP High Energy Intensity & Low Efficiency & Unsustainable structure Macroeconomic Analysis

Electricity production and consumption (GWh) 1700 families relocated Loss of livelihood for >6200 families Loss of 116 fish species (44%) Fishery yield down 80% 65 Mae Hong Song Source: MEA, EGAT, Searin, Graphic: Green World Foundation Dams Malls Province Pak Mun Impacts of Pak Mun Dam alone

Bonok-Ban Krud story

Bonok Bankrud

Power Demand: Projections vs. Actual 1992 – 2009 If no systemic bias, the chance of over-projecting demand 15 times in a row = (½) 15 = 1/32,768 MW

E x c e s s c a p a c i t y Generation capacity in excess of demand ( ) Fictional power demand did lead to real investments that become waste & burden (not to mention disturbed ecology, communities) Excess gas/ pipeline capacity/ generation capacity economic waste + excess burden for consumers Under centralized monopoly structure Source of data: EGAT หมายเหตุ คำนวณจากกำลังผลิตติดตั้งและความต้องการไฟฟ้าสูงสุดรายเดือน Very little incentives to do energy efficiency/conservation

Linear versus exponential extrapolation

Fuel mix in power generation - power development plan 2007 GWh Import Nuke RE Gas Coal Lignite Hydro

PDPs of the Pacific Northwest, USA Source: Seattle City Light

Concluding thoughts VSPP regulations enable small generators together to profitably make substantial contributions to electricity generation. Zero / small carbon footprint Useful for decreasing diesel expenditures for rural electrification VSPP projects help develop local engineering / project development capacity. South-South policy/technology exchange English versions of regulations available online Still a drop in the bucket in Thailand… IRP needed

Thank you This presentation available at: VSPP regulations available at: And