JPV, TB of Nov.15 th, 20051 ‘Rack Status‘ Jean-Pierre Vanuxem, PH-AIS.

Slides:



Advertisements
Similar presentations
André Augustinus 22 June 2004 DCS Workshop Status on services controls.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
André Augustinus 16 June 2003 DCS Workshop Safety.
Power distribution box XD1 top DTTF_Crate XD2 middle DTTF_Crate XD3 bottom DTTF_Crate Connection to DTTF_Crate through cable USE H07 ZZ-F 3G1,5 RACK S1D01.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
SAFETY FOLLOW-UP HL-LHC PROJECT WP17 – Infrastructures meeting S. La Mendola, Jose Gascon DGS/SEE 09 July 2015.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
L.Jirden1 Update on Power Supplies DCS WS L.Jirden u Wiener u Caen u Global Support Contracts.
Electronic Systems Support LHC Crates 2005 Paul Harwood PH Electronic Systems Support Group (PH-ESS) Meeting Sept 1, 2004.
André Augustinus 16 September 2002 Safety issues.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
Electronic Systems Support CAN Branch PSU Designed: Bjorn Halgren PH-ESS Responsible:Paul Harwood.
1 Responsibilities & Planning DCS WS L.Jirdén.
Ken Wyllie, CERN Upgrade infrastructure, Feb LHCb Upgrade Electronics Infrastructure K. Wyllie & L. Roy.
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
Electronic Systems Support Demonstrator Racks Rack coordination meeting 12 October 2004.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
The LHC PC Rack Project Fred Wickens On behalf of the LHC PC-Rack Study Group 10th LECC Workshop Boston Sep 2004.
Internal review of superconductor and magnet laboratories1 Status of LHC-TB Power Converters Hugues Thiesen TE-EPC.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
L.Jirden + J.P. Vanuxem TB VME crates in ALICE (reviewed) u Most detectors (16) need VME crates: u Total 62 crates; 52 for UX, 8 for CR, 2 for.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
17/03/2003 Referee Meeting M. Beretta 1 MDT Barrel - Complete LV-HV rack 6U 1U 4U 2U 45U 19” Tangential Fan High Voltage Crate Low Voltage Crate Heat Exchanger.
, RACK POWER SUPPLY AND CONTROL as proposed by ST-EL. J. Pedersen, ST-EL Presentation,J.C.O.B.,
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
V. Bobillier1 Cable installation status.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
17 th November 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 – November 17 th 2006 Michele Battistin (TS/CV/DC) TS/CV Detector Cooling On call and.
Report on database work for INB in ALICE Latchezar Betev (ALICE) Information Session INB – June 8, 2006.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
External Data and DIP Oliver Holme 18 th January 2008.
ACS news RF cabling campaign: DONE Final tests cavity tuning motor (ctrl): in progress recabling software upgrade Water cooling: ADT static pressure test:
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
Status of integration in USA15. Status of rack layout 20/03/2015FTK Italia - A. Lanza2 Rack Y A2 equipped with turbine cooling system and nominal.
Interventions on electrical distribution and racks’ infrastructure still to be done during LS1 and their impact W.Iwanski.
CALO News Pascal Perret LPC Clermont 22 January 2012.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
Demineralised water cooling system
CC LLRF SM18 test plan and BA6 infrastructure
Cabling for LHCb Upgrade
MICE RF System Power Supplies, Control and Monitoring Status report
Rack Design Proposal as of 01/03/2013
FTK infrastructure in USA15 Status and plans for 2015 A
COOLING LHC RACKS PROCUREMENT
CERN Data Centre ‘Building 513 on the Meyrin Site’
on behalf of the RF group
Electrical and electronic systems projects
TTC System Status May 2007 System overview Production Status
Status of the cryogenic system for B180
ACS news Circulator TCU: control tests in progress All cavity racks
Presentation transcript:

JPV, TB of Nov.15 th, ‘Rack Status‘ Jean-Pierre Vanuxem, PH-AIS

JPV, TB of Nov.15 th, Rack Status (1) Layout and Allocation: –known to ~ 100% ! –250 racks to be used + 52 spare locations –documented in: EDMS ALICE-SER-SPC-021, v.3 Power: –known to ~ 100% ! –type: 1-phase / 3-phase and standard power / UPS –documented in: EDMS ALICE-SER-SPC-022, v.3 Contents: –known to ~ 80% at sub-rack level –documented under ‘Rack contents’ at: –Help from all sub-detectors is still required to complete this task !

JPV, TB of Nov.15 th, Rack Status (2) Purchase of Infrastructure Components: –Standard: turbine units + air deflectors, heat exchangers, ventilation units, water collectors, brackets, adaptors, fittings, etc. –Non-standard: cooling doors for PC racks (CR1-CR3), internal power distribution boxes (UX25) Installation: –Cooling: TS-CV –‘Hazemeyer’ switchboards + ZTBF32 modules: TS-EL –Rack enclosures: ALICE Integration Team (AIT) –Primary power to ‘Hazemeyer’ + control: TS-EL –Secondary power to racks + control: TS-EL + DCS team –Rack infrastructure components: AIT

JPV, TB of Nov.15 th, Guidelines to maintain costs low Recuperate existing LEP equipment –CV (L3): water cooling for racks + air conditioning systems in CR1-CR4 –Mechanics (L3, ALEPH): Rack enclosures + Other Rack components (back doors, brackets, etc.) –Electricity (L3): »UPS units (80 kVA + 60 kVA) »Hazemeyer Switchboards with ZTBF32 modules Make use of COTS (if possible from CERN stores) –CV: turbines, ventilation units –Mechanics: »rack enclosures  new ‘LHC racks’ 52U/41U, 1000mm deep »VME crates (6U/9U) –Electricity: VME-PS, LVPS, HVPS, Cables, Connectors, Group Orders with other LHC experiments –cooling doors for PC racks (together with LHCb) Organize maintenance locally at CERN –define the role of PH-ESS Electronics Pool

JPV, TB of Nov.15 th, Civil Engineering (TS) – All done, except false floors in C and D areas which are being built General Cooling and Ventilation (TS-CV) –All done, except in C and D General Power (TS-EL) –Mostly done in CR1-CR5 + A + B Rack Placement (AIT) –All racks in CR1-CR5 + A + B are installed Basic Rack Equipment (AIT) –All 250 racks will need to be equipped with infrastructure components during 1 st semester 2006 Installation details (1)

JPV, TB of Nov.15 th, 20056

7 Individual Rack Powering (TS-EL + AIT) –A few racks (5 ?) are already powered for tests in CR1+ CR3 –PX24 (CR1-CR5) : all racks will be powered in April 2006 –UX25 (A + B + C + D): May 2006 Power Control (TS-EL) –Done by ‘ENS’ at the level of Hazemeyer ZTBF32 modules –PLC of type ‘Premium’ (from Schneider) –DCS as ‘client’ to ENS ‘server’ –Entire system ready in July 2006 Installation details (2)

JPV, TB of Nov.15 th, And now follows a pictorial trip, around and inside the ALICE racks: ‘ALICE in Rackland’...