ENVIRONMENT IMPACT ASSESSMENT. EIA Environmental Impact Assessment (EIA) is a process of :  identifying,  predicting,  evaluating and  mitigating.

Slides:



Advertisements
Similar presentations
ENTITIES FOR A UN SYSTEM EVALUATION FRAMEWORK 17th MEETING OF SENIOR FELLOWSHIP OFFICERS OF THE UNITED NATIONS SYSTEM AND HOST COUNTRY AGENCIES BY DAVIDE.
Advertisements

World Meteorological Organization Working together in weather, climate and water WMO OMM WMO GFCS Governance proposal Process of development.
Rule-Making Book II EU Administrative Procedures – The ReNEUAL Draft Model Rules 2014 Brussels, May th Herwig C.H. Hofmann University of Luxembourg.
SYSTEM OF EVALUATION AND MANAGEMENT CONTROL RESULTS-BASED BUDGETING THE CHILEAN EXPERIENCE Heidi Berner H Head of Management Control Division Budget Office,
Presentation of the ECB Framework Regulation Organisational aspects
Agency Drafts Statement of Scope Governor Approves (2) No Agency Drafts: Special Report for rules impacting housing Fiscal Estimate.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE Scoping.
Scoping in the EIA process Proposal Identification Screening
HEADQUARTERS Strategic Environmental Assessment ”SEA is a systematic process for evaluating the environmental consequences of proposed policy, plan or.
ENVIRONMENTAL MANAGEMENT PLAN
Topic 6 Environmental Impact Assessments. EIA – Introduction The start Effectiveness?
Disclosure and Public Consultation Transparency and Participation in the Application of Safeguard Policies.
Environmental Impact Assessment Prepared by: Miss Syazwani Mahmad Puzi School of Bioprocess Engineering UniMAP.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Environment Impact Assessment (EIA) Notification 2006 Information Sources: 1.) Environment Impact Notification 2006; Gazette of India, 14th September,
Environmental Impact Assessment (EIA): Overview
Implementing the Second Pillar of the Aarhus Convention: Problems Identified in the National Implementation Reports Magda Tóth Nagy, Senior Expert Geneva,
UNECE and OSCE joint event, Almaty, May 2012
The Aarhus & Espoo Conventions Making implementation work for stakeholders.
Special meeting on the Operation of SPS Enquiry Points Gretchen H. Stanton Secretary of the SPS Committee 31 October 2003.
Where to find Information About Facilities. Overview of Title V Permits.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
Consultant: CMDC Joint Venture Reflections on draft Recommendations for Revision to Administrative Regulations: By Norman Sheridan, Legal & Institutional.
COMPLIANCE. Importance Environmental integrity Credibility of the carbon market Transparency in actions of Parties.
1 Workshop on the Directive 96/61/EC concerning (IPPC) Integrated pollution prevention and control INFRA Public participation & access to environmental.
1 The NEMA EIA Regulations & the cultivation of virgin soil Gerhard Gerber (DEA&DP) Fynbos Forum – August 2006.
Kashif Rasheed Manager Finance. Office of inspector General (OIG) Global Fund Secretariat Country Coordination Mechanism (CCM ) Principal Recipients (PR)
THE BIOSAFETY BILL, 2007 JACARANDA HOTEL, 26 TH JULY 2007.
RECOMMENDATIONS FOR THE INSTITUTIONALIZATION OF THE ACTIVITIES OF THE REMJA WORKING GROUP ON MUTUAL LEGAL ASSISTANCE IN CRIMINAL MATTERS AND EXTRADITION.
State of implementation of the decision III/6f regarding Ukraine (MOP 2, June, , 2008, Riga, Latvia)
Environmental Impact Assessment in the Slovak republic.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES Public Involvement EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE.
SPS Workshop Taipei, 5-6/12/2001 The Transparency Provisions of the SPS Agreement.
The European SEA Directive Simon Marsden School of International Business, University of South Australia Module 1: Basics of SEA.
SEA in the Czech Republic Prague, 24 September 2008.
Environmental Assessment in British Columbia Forum of Federations Conference September 14, 2009.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
1 Application Process Gwich’in Land & Water Board WG 6 Document Review Prepared by Johnny Edwards.
Responsibilities of Lead Agency Pages 7-8 of Training Guide 1. Preliminary review a) Determine if activity is a project as described by CEQA b) May require.
Briefing to the Portfolio Committee on Police 21 August
CEAA 2012 EA PROCESS OPTIONS OCTOBER 15, 2012
LECTURE 2 EIA/EIS. Proposed Undertaking (> 10 hectares) Determine whether there are environmental, health and safety impacts Application for environmental.
Role of State Pollution Control Boards in Compliance and monitoring of conditions of Environmental Clearance Item No. 9.0.
Disclosure and Public Consultation Transparency and Participation in the Application of Safeguard Policies Presenter: Johnson Appavoo Presentation prepared.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
FDIC Perspective on Environmental Risk Presented by: Gordon Stoner Legal Division Federal Deposit Insurance Corporation May 6, 2008.
Regional Accreditation Workshop For Asia and Eastern Europe Manila, Philippines th March, 2012.
ISO Session 3 Environmental Management and Ethics in Management.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
1 BY P.GIRI (LIFE MEMBER – MEAI / TN ) CHIEF EXECUTIVE CREATIVE ENGINEERS & CONSUTANTS 9/4B, BHARATHWAJAR STREET, EAST TAMBARAM, CHENNAI –
Environmental Safeguards
I II Review areas Review criteria Weighted Rating Description of
EIA approval process, Management plan and Monitoring
ENVIRONMENTAL MANAGEMENT & SUSTAINABILITY ISSUES
14-16 September 2016, Wrocław, Poland
Environmental Impact Assessment Notification
Business environment in the EU Prepared by Dr. Endre Domonkos (PhD)
Towards Modern Environmental Impact Assessment (EIA) in Uzbekistan
EIA- Concept and Practice
Updating the Article 6 guide Outline of envisaged changes
SCREENING SCOPING SEA QUALITY CONTROL DECISION
Meeting of PAP/RAC Focal Points, Split, Croatia, 8-9 May 2019
Purpose and objectives of public involvement
Roles and Responsibilities
REPUBLIC OF CROATIA MINISTRY OF ENVIRONMANTAL AND NATURE PROTECTION
Presentation transcript:

ENVIRONMENT IMPACT ASSESSMENT

EIA Environmental Impact Assessment (EIA) is a process of :  identifying,  predicting,  evaluating and  mitigating the biophysical, social, and other relevant effects of development proposals prior to major decisions being taken and commitments made.

EIA Transparency Certainty Participation Practicability Flexibility Cost- effectiveness Credibility Accountability

Rationale of the EIA Protect environment and control pollution Environment Protection Act, 1986 and Environment Protection Rules, 1986 Section 5 Environment Protection Rules 1986: Prohibitions and restrictions on the location of industries; carrying on of processes and operations in different areas EIA 1994 Environment Protection Act 1986 EIA 2006 is supersession of EIA 1994, except in respect of things done or omitted to be done before such supersession

Requirements of prior Environmental Clearance (EC) Which projects require EC? Projects listed in the schedule to notification (as Category A and B projects) All new projects or activities listed in the Schedule to this notification Expansion and modernization of existing projects or activities listed in the Schedule to this notification Any change in product - mix in an existing manufacturing unit included in Schedule

Requirements of prior Environmental Clearance (EC) EC by whom? Category A projects: MoEF Based on decisions on the recommendation by Expert Appraisal Committee (EAC) Category B projects: At state level the State Environment Impact Assessment Authority (SEIAA) The SEIAA shall base its decision on the recommendations of a State or Union territory level Expert Appraisal Committee (SEAC) as to be constituted for in this notification In the absence of a duly constituted SEIAA or SEAC, a Category ‘B’ project shall be treated as a Category ‘A’ project

EIA to be assessed as per :  Physical  Ecological  Socio-economic .. EIA REGIME

EIA regime

To ensure that significant issues are identified; project related information is gathered, alternatives are considered. To avoid biases/inaccuracies in analysis; identify local values/preferences; assist in consideration of mitigation measures; select best alternative. To consider and comment on EIA Report To monitor the implementation of EIA Report’s recommendations and decision’s conditions. To consult people likely to be affected by proposal Salient EIA Steps

contd… Stage 1 - Screening Based on info (form 1, 1A) supplied by Proponent Pre-feasibility report and conceptual plan - no guidelines or requirements, thereby no need to address environmental issues Stage 2 - Scoping No public participation in scoping process - local knowledge about what environmental concerns should be investigated is not given consideration Strict timeline – not a continuous process Biased in securing favorable Terms of Reference (TOR) for investors Access to TOR limited

Contd … Stage 3 – Public consultation Local affected persons having plausible stake in impact of project Public Consultation shall ordinarily have two components comprising of The Public Consultation shall ordinarily have two components comprising of:- public hearing at the site or in its close proximity obtain responses in writing from other concerned persons having a plausible stake in the environmental aspects

Contd … No quorum required for holding public consultation Tight timeline: 45 days from the time requested by the project proponent

Access to information EIA report made available, EIA with all TOR from the scoping process, Public Hearing, additional information Confidential information need not be disclosed in summary EIA Publicity Use of internet as the main means PP notifies through advertisement in news paper etc..

EIA process and tentative Timelines Submission of application (Form 1, prelim reports) Stage 1: Screening; Decide project A, B1 or B2 Stage 2: Scoping; Come up with Terms of Reference (TOR) Prepare preliminary EIA report Stage 3: Public consultation (2 components) Stage 4: Appraisal Final Decision 60 days 45 days 60 days 15 days 30 days Investor Expert Committee Project proponent SPCB Expert Committee Regulatory Authority Who is responsible! Update EIA report (Investor)

Other related EIA Regulations (OMs) 19 th July, 2013 Preparation and Presentation Environmental Impact Assessment (EIA) report and Environmental Management Plan (EMP) o Accreditation of consultants: The Quality Council of India (QCI) or National Accreditation Board for Education and Training (NABET) or any other agency as may be notified 19 th March, 2013: Updating information in the website of the MoEF

Contd.. 30th May, 2012: Consideration of expansion proposals for grant of Environmental Clearance under the EIA Notification, 2006: Submission of certified report of the status of compliance of the conditions stipulated in the EC from the by the RO, MoEF 30 th October, 2012: De-listing of pending projects: Additional information not received even after 6 months of the EAC meeting will be de-listed from pending projects.

18 th May, 2012: Consideration of projects for grant of environment clearance under EIA Notification, 2006, which involve forestland: Stage-I FC not submitted by the PP within the prescribed time limit will be referred to EAC for consideration 12 th December, 2012: regarding violations: Board’s Resolution, Credible Action, a time limit of 60 days, limit to EC granted or cancelled.

4 th December, 2012: Sector specific Manuals 30 th March, 2012: Consideration of projects for environmental clearance based on Comprehensive Environmental Pollution Index (CEPI) - Extension of Moratorium till further orders 20 th March, 2012: Submission of project documents and information in electronic format along with hard copy

Contd.. Coal Beneficiation draft notification: 34 % ash content on daily average basis. Use of Beneficiated coal with an Ash content not more than 34 % and gross calorific value (GCV) should not be < 4000 Kcal/kg on daily average basis Any stand alone TPP should be located beyond 500 km from the pit-head.

EIA Benefits/Flipsides BenefitsFlip sides Provides systematic methods of Impact assessment Time -consuming Estimates the cost/benefits trade-off of alternative actions Costly Facilitates the Public participation Provides an effective mechanism for  Coordination  Environmental integration  Negotiations  Feed back Title public participation in actual implementation Unavailability for reliable data (mostly in developing countries Top-level decision makingfocused on scientific analysis Triggers an institutional building Presentation of EIA report(bulky volumes, scientific explanation, sometimes difficult to understand) Achieve a balance between the impact of Developmental and environmental concern Compliance monitoring after EIA is seldom carried out Compliance to EC ConditionsJudicial process and NGO activism

Thank You