Fermilab Booster Cavity Temperature Measurements – 15Hz Operation January 28, 2015 J. Reid 1.

Slides:



Advertisements
Similar presentations
ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
Advertisements

Performance Limitations of the Booster Cavity Mohamed Hassan, Vyacheslav Yakovlev, John Reid.
LCW Upgrades - Final Booster RF Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions.
Behavior of the TTF2 RF Gun with long pulses and high repetition rates (TESLA note ) Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
Fermilab New Tuner J. Reid M. Slabaugh August 6, 2014 J. Reid 1.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Fermilab Cavity Refurbishment Status J. Reid M. Slabaugh November 19, 2014 J. Reid 1.
PIP Update July Agenda Summary Update – Budget/RLS – Current Activities – Upcoming Activities/ Changes Update Slides High-Power Ferrite TestingDennis.
PIP Update Aug 15 th Agenda Summary Update – Current Activities Dennis Barak / Kiyomi Seiya - High-Power Ferrite Testing Ryan Crawford - Linac and.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Booster Bias Supply Upgrade January 18 th, Ferrite Bias Supply Testing  Four thermocouples added to MADC  Monitoring: center winding, core, input.
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW April 2015.
ILC Power and Cooling VM Workshop Mike Neubauer 1 Collector Cooling Design example Failures in the field Water quality.
PIP Update Aug 6 th Agenda Summary Update – Current Activities/Updates – New Tuner Test Result: Reid & Slabaugh – Anode Supplies: Crawford.
Bias Magnet for the Booster’s 2-nd Harmonic Cavity An attempt to evaluate the scope of work based of the existing RF design of the cavity 9/10/2015I. T.
Booster 15Hz Operation John Reid March 4, Fermilab March 4, 2014J. Reid 2 Scope Brief History of Booster RF systems RF system description Modifications.
Proton Improvement Plan (FY13 PMG Q1). William Pellico, Fermilab PMG, January FY13 Summary Q1 Task Summary – Highlights RFQ Injector Budget.
All Experimenters Meeting PIP Report William Pellico on behalf of PIP team 4/7/2013.
Proton Source Water Systems Proton Source Workshop December 8, 2010 Maurice Ball.
High Power RF Systems, Control and Distribution in the HINS Alfred Moretti, Brian Chase, Chris Jensen and Peter Prieto Fermilab Accelerator Advisory Committee.
PIP Update Jan Agenda Summary Update – Current Activities – Updates (Ken, Pat and John) – Additional Meetings/Notes.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 11/04/2013.
PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.
2015 Shutdown Joe Compton 3/11/2015. RIL PIP Work  Install operational laser notcher  5 days  Dave Johnson & Todd Johnson.
Building a Second Harmonic Radio Frequency Cavity for the Booster Maggie Lankford SIST Intern 2015 The College of Wooster 4 August 2015.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
PIP Update Oct Agenda Summary Update – Current Activities Updates/Talks: Dave Johnson – Linac Notching (laser)
PIP FY15 PMG W. Pellico PIP PMG March 5 th PIP FY15 Year to Date Outline –FY15 activities PIP quarterly milestones Linac Booster Project Controls.
Refurbished Booster RF John Reid October 24, 2012.
Refurbished Booster RF John Reid December 12, 2012.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
PIP Update July 30 th Agenda Summary Update – Current Activities/Updates – Project Controls Update: K. Domann – Linac Lattice – Valeriy Kapin.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (V. Kapin: Booster Collimator) – Additional Meetings/Notes.
Booster Bias Supply and Cavity Upgrade November 16 th, 2011.
Fermilab Proton Driver Project Weiren Chou for Bill Foster Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim,
2 nd harmonic RF perpendicular biased cavity update C.Y. Tan, W. Pellico, G. Romanov, R. Madrak, and D. Wildman 02 Apr 2014.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Alexander Valishev - Simplified Modeling of Space Charge Losses in Booster.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
PIP Update April 10 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Eliana.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Proton Improvement Plan (PIP) William Pellico Fermilab Annual Science and Technology Review September 5-7, 2012.
PIP Update April 3 rd Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
PIP Update Dec 17 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
PIP Update Jan. 16 th Agenda Summary Update – Current Activities/Updates – Shutdown ScheduleHighlights – Upcoming Talks, Reports, Meetings Updates/Talks:
PIP Update Oct 29 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
August 2007 Booster RF Upgrades J.Reid Booster RF Upgrades West Gallery LCW modifications: – Headers in select locations to be upgraded by.
PIP Update August 12 th Agenda Summary Update Current Activities Update – Ryan Crawford - Booster Anode Power Supplies – Dave Johnson - Laser Notcher.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
PIP Update May 28 th Agenda Summary Update – Current Activities/Updates – Ken Domann.
13 th ESLS RF Meeting – 1 st October 2008 DAMPY Cavity 1/20 80 kW at Dampy Francis Perez.
RFQ Cooling Schemes and Instrumentation PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Andrew Lambert - Engineering Division Lawrence Berkeley.
IOTA RF SYSTEM Kermit Carlson 13 Nov 14. RF System Specifications 1 kV RF gap potential 30 MHz CW for electron run – Provide acceleration potential 30.
Booster High Power RF at PIP-II Era John Reid February 18, 2014.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Matt – Cavity Refurbishment) – Additional Meetings/Notes.
Linac 4 SPL tunnel Material access and services shaft Personnel and material access shaft Klystron gallery Emergency exit shaft Transfert line to PS2 Personnel.
704 MHz cavity design based on 704MHZ_v7.stp C. Pai
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 10/06/2014.
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
Report on Sigmaphi 75 kW RFQ Amplifier and Ferrite 75 kW Circulator Ralph Pasquinelli November 18, 2014.
In House RF Power Option John Reid December 14, 2011.
704 MHz cavity folded tuner Thermal Analysis C. Pai
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
Tuner system for CEPC MI Zhenghui 2016/09/14
V. Veshcherevich Cornell University
Presentation transcript:

Fermilab Booster Cavity Temperature Measurements – 15Hz Operation January 28, 2015 J. Reid 1

Fermilab Booster RF Cavity January 28, 2015J. Reid 2

Fermilab Cavity January 28, 2015J. Reid 3

Fermilab Blocking Capacitor January 28, 2015J. Reid 4

Fermilab RF Waveforms January 28, 2015J. Reid 5

Fermilab S/N 1002 Heating to LCW January 28, 2015J. Reid 6 Cavity S/N 1002Jan-15 Power measurements for Cavity / Tuner heat removed by the LCW Operating conditions RF Gap Voltage47.3kV Modulator Vout22.5kV Center Casting delta T0.99 C Center Casting Flow1.04 gpm Center Casting heat removed by LCW - Avg0.273 kW Center Casting heat removed by LCW - during RF Pulse0.59kW Back Tuner Cone Cooling US delta T0.33 C Back Tuner Cone Cooling US Flow1.44 gpm Back Tuner Cone Cooling US heat removed by LCW - Avg0.125kW Back Tuner Cone Cooling US heat removed by LCW - RF Pulse0.274kW Back Tuner Cone Cooling DS delta T0.27 C Back Tuner Cone Cooling DS Flow1.62 gpm Back Tuner Cone Cooling DS heat removed by LCW - Avg0.116kW Back Tuner Cone Cooling DS heat removed by LCW - RF Pulse0.253 kW Back Tuner Cone + Ferrite for 1/2 tuner US delta T3.85 C Back Tuner Cone + Ferrite for 1/2 tuner US Flow1.44 gpm Back Tuner Cone + Ferrite for 1/2 tuner US heat removed by LCW - AVG1.46kW Back Tuner Cone + Ferrite for 1/2 tuner US heat removed by LCW - RF Pulse3.2kW Tuner heat removed by LCW for 3 tuners - Avg8.78kW Tuner heat removed by LCW for 3 tuners - During RF Pulse19.19kW

Fermilab January 28, 2015 J. Reid 7 Cavity Temperature Rise

Fermilab Al Cone with Cooling January 28, 2015 J. Reid 8

Fermilab Tuner Cone End View January 28, 2015J. Reid 9

Fermilab Tuner Cone with Skin Installed January 28,2015J. Reid 10

Fermilab Tuner End View January 28, 2015J. Reid 11

Fermilab Tuner Outer Cooling January 28, 2015J. Reid 12

Fermilab East Gallery Operating Temps January 28, 2015J. Reid 13 Booster East Gallery operating 15 Hz