1 AGT Assessment of Gas Quality for Interchangeability March 8, 2007 Gregg McBride Vice President, Rates and Economic Analysis.

Slides:



Advertisements
Similar presentations
1 CDM Study October 19, 2011 Stan But Manager, Economics & Load Forecasting.
Advertisements

1 Interstate Pipeline Gas Quality Primer Business Practices Subcommittee June 15-16, 2004 PIPELINE SEGMENT Wholesale Gas Quadrant North American Energy.
Energy Conservation Energy Management.
New Paradigms for Measuring Savings
Acme Industrial Mechanical, Inc. Capabilities Presentation Performance-Based Planned Maintenance Providing Leadership Quality Service for the HVAC Industry.
DG Interconnection Working Group Fees and Cost Support for DG Interconnections August 6, 2012.
1 Project Nexus Analysis of impacts and next steps Cesar Coelho Ofgem Project Nexus UNC Workgroup 03 April 2012.
BG&E’s PeakRewards SM Demand Response Program Successful Approaches for Engaging Customers August 20, 2014.
FNSB Gas Distribution System Analysis July 12, 2012 Patrick Burden Presentation to Fairbanks Community.
Rate Plan. Value Story When asked, our customers identify the following topics as ways MidAmerican Energy provides value – Emergency Response.
OPPORTUNITIES FOR BUSINESSES TO DIRECTLY IMPROVE THE BOTTOM LINE THROUGH ENERGY EFFICIENCY 3 rd May 2010 Kees Brinkman Managing Director.
IMPLICATIONS OF NATURAL GAS INTERCHANGABILITY FOR CALIFORNIA GAS CUSTOMERS Industrial and Commercial Burners – GTI lead Appliances – LBNL lead David Rue,
California Energy Commission North American Market Gas-trade (NAMGas) Model: Key Drivers and Structure 2015 Integrated Energy Policy Report California.
Federal Energy Regulatory Commission Natural Gas Quality & Interchangeability May 17, 2005 FERC Technical Conference FERC Staff Presentation This presentation.
Monetizing Energy Saving Opportunities CBC Energy Group LLC 2011 Commercial and Industrial Energy Solutions.
CALIFORNIA ENERGY COMMISSION Gas Quality Stakeholders’ Technical Committee Meeting September 20, 2005 Natural Gas Quality: Power Turbine Performance During.
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
Principles of Interstate Gas Michael M. Melnick, President of Interstate Gas Marketing, Inc,, graduate from Pennsylvania State University in 1980 with.
CALPINE March 2, 2004 HARVARD ELECTRICITY POLICY GROUP Natural Gas and Electricity Ron Walter Executive Vice President.
1 EERMC Public Meeting on Combined Heat and Power September 17, 2013.
1 CARB Public Consultation Meeting Compressed Natural Gas Specifications August 3, 2005 WSPA/CIPA Presentation Western States Petroleum Association (WSPA)
Liquid-Phase Methanol Process (LPMeOH) Jill DeTroye, Brandon Hurn, Kyle Ludwig, and Isaac Zaydens.
Connecticut’s Energy Future Connecticut Energy Advisory Board Conference Hartford, Connecticut December 2, 2004 Kevin Kirby Vice President, Market Operations.
RETScreen® Energy Efficiency Projects
1 The Impact of Using LNG-Derived Natural Gas in the South Coast Air Basin January 2006.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Mark Kempic President Columbia Gas of Maryland, Inc. Maryland-District of Columbia Utilities Association Fall Conference Fueling the Economic Engine.
NEW YORK Market Profile July NEW YORK Market Service Map Market Size: $21.7 Billion Market Potential 20.9 Million Potential Customers.
The Potential for Increased Cooperation on Offshore Wind among the Northeast States Warren Leon, Executive Director.
> Natural Gas Composition for NGVs William E. Liss Gas Technology Institute.
Knowledge to Shape Your Future Electric / Gas / Water Information collection, analysis and application EE Potential Summary Study Overview CALMAC Meeting.
Energy Business Solutions Michigan IRP Working Group Meeting June 10, 2005.
Overview of Distributed Generation Technologies June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
INSTALLATION OF CAPACITOR BANKS IN COMMERCIAL/INDUSTRY BUILDINGS African Regional NAMA Workshop Kigali, Rwanda, 2015 By: Kennedy Amankwa, Energy Commission,
1 Gas Expansion in New England Paul Zohorsky Vice President – Engineering, Sales & Marketing, LNG Northeast Utilities Gas Business Unit (Yankee Gas and.
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
Gas Market Dynamics – The Ups and Downs March 11, 2009.
Opting for “Long Term Operations” Technical, economic and regulatory considerations MARC Conference June 8, 2010 Sean Bushart, EPRI Sr. Program Manager.
Sep 2005Power Generation1 Proposed LNG Gas Turbine Interchangeability Study 20 Sep 2005.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
SL Village Hall June 24, 2002 Village of Freeport, New York Freeport Electric Village of Freeport, New York Freeport Electric.
Workshop to Discuss Proposed Amendments to Motor Vehicle CNG Fuel Specifications February 2002 California Environmental Protection Agency Air Resources.
> 30 kW Interconnection Work Group Meeting June 19, 2007.
Overview of Distributed Generation Applications June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
1 CARB Fuel Spec June 21, 2000 Michael Eaves NGV Program Manager Southern California Gas Company.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
WRAP States Four Factor Reasonable Progress Lee Gribovicz WRAP IWG Meeting March 10, 2009.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Benefical Use of Digester Gas Point Loma Wastewater Treatment Plant Industrial Energy Association April 8, 2015.
Investing Our Energy In You Traverse City Light & Power Electric Generation TCL&P Study Session December 1, 2009.
1 Gas Quality & Interchangeability Update NARUC Annual Convention November 11-14, 2007.
LNG quality and market flexibility Challenges and solutions
2015 Mace Advocacy alliance policy conference
1 Interchangeability Sensitive Receptor Inventory Algonquin Gas Transmission New England Customer Meeting Robert D. Wilson Director, Environmental Operations.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
1 DRAFT DO NOT CITE OR QUOTE For NPC Resource Study Discussion Only NPC Demand Task Force – Residential and Commercial Findings & Recommendations January.
SUBJECT : POWER DISTRIBUTION AND UTILIZATION (PRESENTATION) INSTRUCTOR:KASHIF MEHMOOD.
ICS Area Managers Training 2010 ITIL V3 Overview April 1, 2010.
Gas quality variation impact on gas appliances in Japan: a status report Tatsuo Kume Toshikuni Ohashi Energy Engineering Dept. Osaka Gas Co., Ltd. Date:
Overcoming Challenges to Green Power Markets Renewable Energy Certificates 2004 World Resources Institute Sustainable Enterprise Summit March 18, 2004.
Boiler Operations, Maintenance and Performance Conference.
A Road Map to Energy Savings: Elements of a Comprehensive Energy Plan Presented by: Kenny Esser, Senior Associate June 18, 2014 Passaic County Division.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
Fort Stanwix National Monument Energy Audit Contract
EnMS Management Review
CDM Study Stan But October 19, 2011
CDM Study Stan But October 19, 2011
Options for the Development of a Demand Side Response Mechanism
Presentation transcript:

1 AGT Assessment of Gas Quality for Interchangeability March 8, 2007 Gregg McBride Vice President, Rates and Economic Analysis

2 Purpose & Agenda Interchangeability Implementation Process GTI Interchangeability Studies Strawman – Proposed Tariff Considerations Interchangeability Implementation Process GTI Interchangeability Studies Strawman – Proposed Tariff Considerations Agenda Develop a gas quality specification which reasonably facilitates and accommodates regasified LNG as a source of supply for the markets served, while not being unduly burdensome to any customers affected by regasified LNG. 1.Maximize Supply Options for Customers and Markets. 2.Minimize Operating and Cost Impacts from Changing Supply 3.Implement Tariff Modifications in a Manner that Facilitates Accomplishing Objectives 1 and 2. 1.Maximize Supply Options for Customers and Markets. 2.Minimize Operating and Cost Impacts from Changing Supply 3.Implement Tariff Modifications in a Manner that Facilitates Accomplishing Objectives 1 and 2.

3 3 1 Understand Historical Supply 2 Identify “Sensitive Receptors” - LDC’s catalog potential sensitive customer equipment 4 Assessment - Assess sensitive equipment - Establish extent of retrofits - Negotiate fixes 5 Settlement Agreement - Establish interchangeability Tariff parameters - Establish most economical retrofit strategy, schedule & cost sharing mechanism - Work with Pipelines to establish system adjustment gas Work with Pipelines and Suppliers Establish reasonable supply compositions Understand “Zone of Influence” Interchangeability Implementation Process Source: B. Wilson, Keyspan 02/02/2006 Historical Supplies 03/07/2006 Add. Flow Studies 03/08/2007 Assessment Mtg. 06/15/2006 GTI Collaborative 12/01/2006 GTI 1 st Draft Report 04/11/2006 Stakeholder Issues 05/04/2006 Technical Data

4 Assessment of Gas Quality for Interchangeability Objective/Deliverables – Given a list of potentially sensitive natural gas end use applications and a survey of possible liquefied natural gas (LNG) imports, estimate the range of gas quality that would or would not require a specific retrofit and the estimated per-unit cost of such retrofit. The natural gas compositions in the report are representative of the possible LNG imports by Suppliers, and the equipment are the potentially sensitive end uses identified by the Northeast Stakeholders Group. Research Contractor : Gas Technology Institute Stakeholders: Algonquin Gas Transmission, LLC Bay State Gas Company BP Energy Company Connecticut Natural Gas Corporation Consolidated Edison Company of New York, Inc. Distrigas of Massachusetts, LLC Excelarate Energy, L.P. Keyspan Energy Delivery Companies Orange and Rockland Utilities, inc. Public Service Electric and Gas Company Repsol Energy North America Corporation Shell NA LNG LLC The Southern Connecticut Gas Company Virginia Power Energy Marketing, Inc. Weaver’s Cove Energy, LLC Yankee Gas Services Company

5 Three classes of natural gas end use were identified in the assessment: –power generation –process heating –use as feedstock Each had particular performance needs, and were further classified into equipment that are not likely to require retrofit, equipment that may require retrofit, equipment that may require an operational change, and equipment for which gas quality variation is not well known. The assessment comprises of six total documents: Assessment of Gas Quality for Interchangeability 1.Executive Summary 2.Properties of the Representative LNGs 3.Reciprocating Engines, Gas Turbines, and Fuel Cells 4.Feedstock Applications Including Liquefaction Facilities 5.Industrial Process Heaters 6.Appendices

6 Abbreviated Summary of GTI Study Sensitive end users of natural gas included: – The liquefaction process for peak shaving facilities, – Some utility-scale gas turbine burners, – Older reciprocating engines without knock sensing or newer reciprocating engines with high BMEP and no emissions control. Those systems which cannot accommodate a gas supply with wider variability than has historically been present could be retrofited or replaced at some cost. Process heating end users should to be aware of the changes to gas quality so that they can adjust their air-to-fuel ratio to accommodate both the historical and future Wobbe Number values.

7 Strawman - Path Forward Understand the impacts to AGT Customers based on proposed Gas Quality Tariff under consideration. Identify Sensitive End User Data Requirements – Equipment – Age – Location – Flow volume Determine Cost Impacts – End Users – Suppliers Proposed Tariff Language Action Item: Provide Geographically accurate AGT Map with delivery point names/cities for placement of end user facilities. Out to attendees first of next week (NLT 13-Mar-07) LDCs to place sensitive receptors on map with data items from data requirements above. Breakout volumes by Winter/Summer seasons. Rate of Change after volume information is obtained and plotted. Turnaround time for data: two weeks. Looking to provide GTI the data 7 to 10 days after data is received. Understand the impacts to AGT Customers based on proposed Gas Quality Tariff under consideration. Identify Sensitive End User Data Requirements – Equipment – Age – Location – Flow volume Determine Cost Impacts – End Users – Suppliers Proposed Tariff Language Action Item: Provide Geographically accurate AGT Map with delivery point names/cities for placement of end user facilities. Out to attendees first of next week (NLT 13-Mar-07) LDCs to place sensitive receptors on map with data items from data requirements above. Breakout volumes by Winter/Summer seasons. Rate of Change after volume information is obtained and plotted. Turnaround time for data: two weeks. Looking to provide GTI the data 7 to 10 days after data is received.

8 AGT Gas Quality Tariff Consideration Current AGT TariffTariff Under Consideration Heating Value Min: Heating Value max:Not stated1110 Wobbe NumberNot stated Liquefiable HydrocarbonsNot stated.032 GPM of C6+ 15 degree F CHDP Safe Harbor Objectionable MatterCommercially Free OxygenNot stated.20% Inerts – Total Max: CO2 Max: Nitrogen Max: Not stated 4.0% 2.0% 2.5% H2S Max:1.0 gr/100cf.50 gr/100cf Total Sulphur Max20 gr/ 100cf10 gr/100cf TempNot statedMax 120 deg F LiquidsFree at flowing conditionsNo Change Water7 lbs/1MMcfNo Change Microbiological AgentNot statedFree OdorizationContain as requiredNo Change

9 Wobbe Number vs. HHV for AGT and LNGs Figure 16. Wobbe Number vs. HHV Source: Assessment of a Gas Quality Survey for Interchangeability: Properties of the Representative LNGs, February 2007 DRAFT LNG Supplies compared to NGC+ Recommendations: Interchangeable: 26% Interchangeable w/2% Stab. 74% Non-Interchangeable: 26% Interchangeable w/4% Stab. 92% Non-Interchangeable: 8% LNG Supplies compared to NGC+ Recommendations: Interchangeable: 26% Interchangeable w/2% Stab. 74% Non-Interchangeable: 26% Interchangeable w/4% Stab. 92% Non-Interchangeable: 8%

10 Acceptable LNG Sources (green & orange) LNG Supplies compared to NGC+ Recommendations and AGT Considerations: Interchangeable: 26% Interchangeable w/2.5% Stab. 82% Non-Interchangeable: 18% LNG Supplies compared to NGC+ Recommendations and AGT Considerations: Interchangeable: 26% Interchangeable w/2.5% Stab. 82% Non-Interchangeable: 18%

11 AGT Assessment of Gas Quality for Interchangeability Meeting March 8, 2007