Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate.

Slides:



Advertisements
Similar presentations
Volume of Rectangular Prisms
Advertisements

March 28, 2011 DRILL Solve these problems
Heating, Ventilating, and Air-Conditioning (HVAC)
Prof Awad S. Hanna Concrete Structures Concrete Structures.
Mar 13, Low-energy RHIC electron Cooler (LEReC) CRYOGENICS Mar 13, 2014.
3.7 Optimization Problems
What is the surface area of the right triangular prism? A in 2 B in 2 C in 2 D in 2.
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
CONSTRUCTING A FIVE CABIN LATRINE
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Volumes Of Solids. 7cm 5 cm 14cm 6cm 4cm 4cm 3cm 10cm.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Accelerator Laboratory 1 CFS Review of Asian Region (S. Fukuda) June 1/2010 DRFS HLRF System KEK S. Fukuda Introduction: Basic Concept of DRFS Progress.
Space Power Facility (SPF) CEV Environmental Qualification Testing DISCLAIMER: This Initial Government Concept does not represent a preferred Government.
THE NATURE OF MEASUREMENT Copyright © Cengage Learning. All rights reserved. 9.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF ODH Discussion How to avoid ODH2 conditions? August 5, 2015.
NOvA APD Cooling Water Update William Gilbert University of Minnesota.
’ tall Empty space below this metal sheet 66’ 14’ 4’ 10’ Ceiling tiles = 24 Concrete blocks 14’ long There are two “styles” of Ceiling tile,
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Upgrade Injector Test Facility: UITF Why Build It? HDIce commissioning Bubble chamber physics with Bremsstrahlung x-rays: photo-disintegration of oxygen.
Class 2: College Algebra Objectives  Solve Quadratic equations  Add, subtract, multiply, and divide complex numbers.  Solve Quadratic equations in.
Jan. 13,2003 Bill Miller, U of M Off-Axis Detector Quick Overview of Potential Detector Hall Gas Handling Some Soudan numbers ODH Flammable Gas.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Project Status Meeting Matt Poelker July 31, 2015.
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
ERL: G-5/e-Gun Cryogenic & Pressure Safety Committee Review ERL G-5/e-gun Beam Line Vacuum Failure Analysis April 24, 2009.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
MINU GPP WBS 1. Main Injector Neutrino Upgrades - Infrastructure Project Dixon Bogert APD Department Report – March 7, 2007 Russ Alber - FESS Engineering.
Understanding Building Systems. Physical Layout Building Plans Architectural Plans Structural Plans Mechanical Plans Plumbing Plans Electrical Plans HVAC.
Electrical Plans.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Project Status Meeting Matt Poelker October 21, 2015.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
SCH Controls Readiness Review: Site SCH Controls Readiness Review: Site UNIQUE HAZARDS: Significant fields in adjoining magnet cells Magnetic field.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Re-scoping UITF Matt Poelker November 14, 2015.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
Installation of the T600 at Fermilab CSN2, September 22,
CMTF Infrastructure Jerry Leibfritz PIP-II Machine Advisory Committee 9-11 March 2015.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
CMTF GROUNDING FOR PIP-II K. Carlson PXIE Electrical Coordination Meeting December 19 th, 2013.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting What we started with… UITF as imagined Upgraded Injector Test Facility - UITF.
UITF ODH Assessment UITF Safety Review May 10, 2016.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting What we started with… UITF as imagined Upgraded Injector Test Facility - UITF.
PXIE Layout and Infrastructure Building, Cryogenics, Utilities… Rich Stanek On behalf of the CMTF Team PXIE Collaboration Meeting November 28, 2012.
This talk is not a summary of costs for conventional facilities This talk is Review of conventional facilities used by CDF Discussion of status of systems.
Facility Layout and Infrastructure Requirements Rich Stanek (on behalf of CMTF facility team) PXIE Program Review January 16-17, 2013.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Upgrade Injector Test Facility: UITF Why Build It? HDIce commissioning Bubble chamber physics with Bremsstrahlung x-rays: photo-disintegration of oxygen.
Installation of the T600 at Fermilab Fermilab, February 15,
1 CFS Utilities – What’s included in RDR for IR July CFS Utilities – IRENG WG C WATER COOLING: none. Unknown loads on IR. Only have water plants.
Integration of the Spectrometer Solenoid Magnets
CBETA Technical Review
Cryoplant Installation Scope
Heating Ventilating and Air Conditioning
UITF – Upgrade Injector Test Facility
SBN Far Detector integration model overview
UITF Project Status Meeting
EMPTY BIN TREATMENTS Mimoun Abaraw.
Surface Area and Volume Review
SURFACE AREA.
Upgraded Injector Test Facility
Uses of UITF 10 MeV spin-polarized electron accelerator, beam current up to 100 uA M. Poelker December 12, 2018.
Upgraded Injector Test Facility
Get your calculators and your formula sheet!
Presentation transcript:

Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate

Thomas Jefferson National Accelerator Facility Page 2 UITF Progress meeting Improving the ventilation in Cave2 Add a wall to help direct air flow Add ductwork leading to rear of Cave2

Thomas Jefferson National Accelerator Facility Page 3 UITF Progress meeting

Thomas Jefferson National Accelerator Facility Page 4 UITF Progress meeting Cryo lines from CTF along wall GN2 lines along the wall SF6 tank

Thomas Jefferson National Accelerator Facility Page 5 UITF Progress meeting Helium dewars: 1,000 liters, 500 liters, 50 liters = 1,550 L ¼ CM LHe capacity, ~ 400 L (?) Total LHe supply from CTF…. Nitrogen line at 80 psi thru a 3/8 inch pipe = 22 cfm or 1,320 cubic feet per hour SF 6 inside vessel that hold HV power supply: 25 ft 3 filled to 70 psi, ~ 54 lbs: total volume if released? 144 ft 3 Helium, Nitrogen and SF 6

Thomas Jefferson National Accelerator Facility Page 6 UITF Progress meeting Rough Dimensions Cave 1: 12’ x 12’ x 60’ ~ 8,640 ft 3 Cave 2: 22’ x 54’ x 12’ ~ 14,256 ft 3 Dick Owen made a more exact calculation: 25,704 ft 3 Matt’s loose estimate, total volume: 22,896 ft 3 Exhaust vent to outside Exhaust vent to high bay exit/entrance

Thomas Jefferson National Accelerator Facility Page 7 UITF Progress meeting ’ tall Empty space below this metal sheet 66’ 14’ 4’ 10’ Ceiling tiles = 24 Concrete blocks 14’ long There are two “styles” of Ceiling tile, square and rectangular cross sections New stairs here

Thomas Jefferson National Accelerator Facility Page 8 UITF Progress meeting ’ tall Empty space below this metal sheet 66’ 4’ Ceiling tiles = 24 Concrete blocks 14’ long There are two “styles” of Ceiling tile, square and rectangular cross sections New stairs here klystrons Completely empty One waveguide and LCW Two waveguides New electric here HDIce 14’10’

Thomas Jefferson National Accelerator Facility Page 9 UITF Progress meeting

Thomas Jefferson National Accelerator Facility Page 10 UITF Progress meeting Walkway: Backs of racks here Metal plate, rad shielding Electronics racks, side view Front of rack here

Thomas Jefferson National Accelerator Facility Page 11 UITF Progress meeting DeviceQtyAC Power Each Total AC Power LCWLocation Gun High Voltage power supply 1 30A / 208 VAC 3 phase None Top of cave ODH rack needs emergency power 1 20A/120 VAC single phase None from an emergency power loop Trim Rack2 50A / 208 VAC 3 phase 100A/208 3Phase None Top of cave Chicane power supply 1 30A / 208 VAC 3 phase 30A/208 3Phase None Top of cave Chicane magnets 3none 4 GPM Cave LLRF/Master Oscillator 1 20A / 120VAC single phase None Top of cave Water skids for chopper & buncher 2 20A / 208 VAC 3 phase 40A/208 3Phase 4 GPM Cave Solid state RF amps for choppers 4 20 Amp / 208 VAC single phase 80 Amp / 208 VAC single - phase to phase Top of cave 4 Amplifiers at 400 Watts each Solid state amplifier for 750 MHz buncher 1 25A/480 VAC 3 phase 25A/480VA C three phase Top of cave Cathode Power Supply for klystrons 1 100A / 480VAC 3 phase None Top of cave also for High power RF VAC three phase and 120 VAC Top of cave Klystrons3none 16.5 GPM Top of cave 5.5 GPM each Circulators & loads 3none 6 GPM Top of cave 2 GPM each Cave Vacuum & Utility power 20A / 208 3Phase XX A / 240 VAC X circuits 20 A / 120 VAC 20A/208 3Phase 240 VAC Cave Ion Pump power supplies 1 20A 120VAC single phase none Top of cave Control Racks including cryo 12 20A / 120VAC single phase Amps Top of cave Control Room1 20A / 120VAC single phase Amps Control Room Inside the Cave 20A / 120VAC single phase Amps along perimeter of the cave HDIce gets power from Big Bertha. Big Bertha will get power fed from a distribution panel in the annex. This distribution panel is attached to the generator. Ground isolated lines Walt thinks we might want two additional 480 VAC welding receptacles installed inside the cave too. These additional lines do not need to be attached to a generator.

Thomas Jefferson National Accelerator Facility Page 12 UITF Progress meeting

Thomas Jefferson National Accelerator Facility Page 13 UITF Progress meeting Walt: electronics racks platform design, for Neil to build Neil Wilson: rack platform, unistrut to wall, temporary stairs, LCW, GN2 and compressed air Layout of utilities added to unistrut Have facilities remove stuff from control room wall exterior Find a concrete block for empty space near control room Have Walter move concrete block…