City of Gooding Town Hall Meeting October 2, 2013.

Slides:



Advertisements
Similar presentations
DESIGN LAYOUT OF DISTRIBUTION SYSTEMS
Advertisements

Simple Tabletop Exercise Objectives:  Evaluate ER preparedness and crisis management  Develop a procedure to simultaneously and efficiently handle widespread.
LEED NC Water Efficiency INTENT & CODE Slide Editor: James A. Strapko LEED Source:
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
LEE COUNTY UTILITIES DIVISION Integrated Water Resources Master Plan
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
1 Manassas Park Town Meeting 29 October Welcome This is the first Manassas Park Town Meeting Governing Body implemented this as a way to improve.
City of Gooding FLOOD IRRIGATION SYSTEM Town Hall Meeting September 5, 2013.
Colorado Springs’ ASR Program Presented by Cortney Brand Western Water Workshop, Gunnison, CO July 28, 2005.
WATER RESOURCES STRATEGY IMPLEMENTATION Mayor Martin J. Chavez City of Albuquerque, New Mexico 2005 Urban Water Council Albuquerque, New Mexico.
Membrane Softening Water Treatment Plant completed in –Upper Floridan groundwater wells provide the source water for treatment. –Treatment process.
Rainwater Conservation System Town of Cary Senior Center Facility.
Is there a Drought in Ventura? City Manager’s Report July 16, 2007.
POTABLE WATER CVEN 451 Term Project. Demand Estimate Water Use Average Flow (GPD/Capita ) # of People ADD (GPD ) MDD^ (ADD*2.4) PHD^ (MDD*1.85) Residential.
Simple Tabletop Exercise Objectives:  Evaluate chemical supply alternatives  Determine interdependencies between the utility and other infrastructures.
Overview and Project Approach  Clinton is currently experiencing surface water supply shortages in their raw water source, Clinton Lake, and has been.
 Groundwater Supply ◦ Quantity ◦ Quality  Infrastructure ◦ Treatment ◦ Transmission ◦ Distribution  Response Plans ◦ Long-term ◦ Short-term ◦ Emergencies.
Well Systems. Well System Capacity Well system capacity needs to be large enough to supply daily water need in 10 to 12 hours. Some designers assume 5.
1 CTC 450 Review Water Quality Water Quality. 2 CTC 450 Water Distribution Systems Water Distribution Systems.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
City of Polson April 5, 2010 PUBLIC HEARING Water System Improvements PRESENTATION ON PRELIMINARY ENGINEERING REPORT.
February 24, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
Demands, Supplies & Priorities. Demand Sectors Irrigation Livestock Mining Industrial Commercial Ecosystems Domestic Total Water Demand Major Cities.
Water System Planning Study
What are some global concerns about water? Where is most of the water? Most valuable resource Less than 3% is freshwater Most of that in unavailable.
Determination of Ellenburger Aquifer Sustainability
Residential Fire Sprinkler Concerns. Water Supplier Reliability Issues Water Supply Water Facilities Water Quality Cost.
Cottonwood Water & Sanitation DistrictSeptember 2002 Arber Indirect Potable Reuse at Cottonwood Water and Sanitation District Rick Arber, Ben Johnson Richard.
1 Why Budgeting Matters NC Local Government Budget Conference Wilmington, NC July 2007.
ADELAIDE DARWIN MELBOURNE PERTH WHYALLA Page 1 Metropolitan Local Government Group Recycled Water Scheme For Metropolitan.
Joint WRAP Update Meeting III January 26, WELCOME… Thank you for joining us Please sign in Tonight’s topic… How we plan to meet the County’s future.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
TACOMA WATER RESILIENCY Providing Clean, Reliable Water Now And In The Future.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
NATIONAL WATER RESOURCE STRATEGY SOUTH AFRICA’S WATER SITUATION AND STRATEGIES TO BALANCE SUPPLY AND DEMAND BERG WMA.
SOUTH METRO WATER SUPPLY STUDY DECEMBER 2003 Stretching our Water Supplies South Metro Denver Area Gunnison Water Conference July 28, 2004.
Equus Beds ASR Program A Case Study in Success Texas Innovative Water 2010 Seminar October 11, 2010 Texas Innovative Water 2010 Seminar October 11, 2010.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
Investing In Our Future. Statement from Mayor Tom Murphy “The Gillette Regional Water Supply Project is essential for quality of life and economic development.
Canaan Valley Tucker County, West Virginia Decentralized Wastewater Management Facility Plan July 28, 2005 Pio Lombardo, P.E Lombardo Associates, Inc.
Implementation of the Joint Operations Plan Regionalization of the Water Resource Carol Bryck Capstone Project Executive Masters of Public Administration.
1 Water Resources Management - DEQ’s Role in Water Supply - State Water Commission October 1, 2002.
Potable Reuse in Texas: A Glimpse into the New Water Frontier Ellen McDonald, Ph.D., P.E. Alan Plummer Associates, Inc.
Reservoir Development Update Region K Meeting July 11, 2012 Karen Bondy, P.E. Manager of Resource Strategy 1.
Metropolitan Council Regional Groundwater Flow Modeling Twin Cities Metropolitan Area Water Supply: March 11, 2008 Lanya Ross Senior Environmental Scientist.
City of Gooding Town Hall Meeting October 29, 2013.
1 EASTERN MUNICIPAL WATER DISTRICT Water Supply Strategic Plan Brian Jack Powell, P.E. Director of Planning June 17, 2015.
City of Palo Alto Utility Rate Changes FY 2013 Facility Managers’ Meeting August 16, 2012 Ipek Connolly, Senior Resource Planner.
Phase II and Compost Facility Upgrade Projects February 16, 2012.
Town of Enfield : Upgrading the Water Pollution Control Facility & Collection System Jay Sheehan, PE Michael Burns, PE.
MWRA WATER SOURCE TOWN MEETING OCTOBER 05, :30 PM NR HIGH SCHOOL PERFORMING ART CENTER.
Home Water Supply Basic Facts a Homeowner Needs to Know
Where is Cambrai located ? Cambrai is located in the North of France, about 180 kilometers far from Paris. How many inhabitants are there in Cambrai ?
Monthly Reporting on Drought Response
SB411 (2015): Public School Overcrowding and Repair Needs Committee Presentation to the Reno City Council October 7, 2015 Dylan Shaver.
Lecture (11): Water Distribution Systems
Chromium 6 Regulation Corrective Action Plan October 6, 2015
Outline of Presentation
Town of Dunn Sanitary District No. 3
Name: _________________ Class: ________
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
City of Pilot Point 2018 bond election
WSAC Decision Making Framework
City of Sunrise Wastewater Reuse Program
Water Supply Planning for the Twin Cities Metropolitan Area
OBJECTIVE HYDROSPHERE
Out and About at City Hall
Local Government.
Presentation transcript:

City of Gooding Town Hall Meeting October 2, 2013

2 OLD SYSTEM November 5, 2013 BOND ELECTION Bond = $5,000,000 NEW RELIABLE SYSTEM Objectives OCTOBER 2, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS

3 Old System  Non-potable irrigation system  Drinking water system OCTOBER 2, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS

4 Old System  Non-potable irrigation system Deteriorated beyond repair Continued use is not practical  Drinking water system Non-compliant OCTOBER 2, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS

5 New Drinking Water System  Water Facility Planning Study (WFPS) Evaluate existing system Develop alternatives to improve the system Select preferred alternative  Design selected alternative  Project Construction OCTOBER 2, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS

6 New Drinking Water System  Existing water system Insufficient water rights Current Maximum Day Demand: 2,264 gpm OCTOBER 2, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS Ground Water Rights 3,164 gpm Well Pumping Capacity 3,543 gpm Redundant Supply 2,025 gpm

7 New Drinking Water System  Existing water system Insufficient water rights OCTOBER 2, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS Ground Water Rights 3,164 gpm Well Pumping Capacity 3,543 gpm Redundant Supply 2,025 gpm Max Day Demand 2,264 gpm

8 New Drinking Water System OCTOBER 2, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS By 2017 demand is greater than redundant supply while using gravity irrigation system

9 New Drinking Water System OCTOBER 2, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS Preferred alternative – Alternative 3A

10 New Drinking Water System OCTOBER 2, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS  Estimated increase in monthly user rates Alternative 3A eliminates yearly gravity irrigation charge of $39.91/lot/year

11 Selected Alternative Cost OCTOBER 2, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS Aquifer Recharge project – Water Rights – additional Transmission Improvements

12 New Drinking Water System OCTOBER 2, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS

13 NEXT STEPS OCTOBER 2, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS Town Hall Meeting October 29, 7:00-9:00 PM Bond Election November 5, 2013

14 THANK YOU! OCTOBER 2, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS Gooding Mayor and City Council Walt Nelson, Mayor Vern France Mitch Arkoosh Diane Houser Mel Magnelli Keller Associates, Inc. Jim Mullen, P.E. Oksana Roth, E.I. (208)